V680-HA63B Omron V680 Series Amplifier Unit
V680-HA63B Omron V680 Series Amplifier Unit
V680-HA63B Omron V680 Series Amplifier Unit
Omron

V680-HA63B Omron V680 Series Amplifier Unit

SKU: V680-HA63B
Categories : All Products
In Stock
  • Dimensions: 110 mm x 60 mm x 40 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for high-frequency signal conditioning and read/write head interface processing in industrial RFID networks, the Omron V680-HA63B (V680-HA63B Amplifier Unit) provides direct physical/electrical execution.

Model Nomenclature & Structural Identification

  • V680: Industrial RFID system architecture platform
  • HA: External amplifier processing unit designation
  • 63: High-capacity multi-kbyte memory tag protocol interface option
  • B: Generation revisions with enhanced environmental ingress sealing

Performance Parameters & Hardware Metrics

Parameter Specification
Model V680-HA63B
Brand Omron
Origin Japan
Weight 0.65 kg
Base Unit Dimensions 110 mm x 60 mm x 40 mm
Shipping Dimensions 180 mm x 130 mm x 90 mm (Shipping weight: 0.95 kg)
Operating Temp -10 deg C to 55 deg C (with no icing)
Power Consumption Max. 3.5 W (supplied via main controller interface)
Ingress Rating IP67 / IP65 (IEC60529)
Storage Temp -25 deg C to 65 deg C (with no icing)
Memory Compatibility 2-kbyte / 8-kbyte RFID tag memory profiles

Industrial Control & Network Integration

The amplifier processes radio-frequency analog signals between the host controller and antenna head, maintaining tight timing alignment with high-speed automated material handling lines. Integrated backplane bus communication velocity Licences and deterministic network interfaces like Profinet / EtherNet/IP allow precise real-time synchronization during I/O density scaling. The onboard logic maintains full firmware flash compatibility to prevent communication dropouts across high-density tag transactions.

Package Component Checklist

  • 1 x V680-HA63B Amplifier Unit Assembly
  • 2 x M4 Mounting Screws with Lock Washers
  • 1 x Cable Strain Relief Fitting Set
  • 1 x Installation Sheet

System Mounting & Wiring Protocol

Mechanical Integration

  • Secure the amplifier unit directly to a flat metal panel using two M4 mounting screws.
  • Position the unit to maintain at least 30 mm spacing from surrounding metal surfaces to prevent RF signal interference.

Electrical Connections

  • Connect the dedicated antenna cable to the amplifier input connector, tightening the locking collar to secure the IP67 seal.
  • Route the amplifier interface cable to the host ID controller, keeping signal lines isolated from high-voltage motor power leads.

Technical Questions & Answers

  • What specific memory capacities are supported by this amplifier unit?

    The unit is fully compatible with 2-kbyte and 8-kbyte memory RFID transponder tags.

  • What degree of environmental protection does the housing provide?

    The unit conforms to IEC60529 standards, offering IP67 and IP65 dust and water resistance ratings.

  • What ambient temperature range is allowable during field operation?

    Operating ambient temperatures must be maintained between -10 deg C and 55 deg C with no icing present.

  • How is electrical power provided to the amplifier module?

    Power is delivered directly through the multi-conductor cable linked to the host ID controller.

  • What mechanical precautions prevent signal degradation from metal obstruction?

    Maintain a minimum clearance of 30 mm around the housing face from adjacent metallic structural members.

  • Does the amplifier require manual firmware adjustments when swapping tag sizes?

    No, the amplifier automatically adapts its transmission timing protocols based on host controller command parameters.

  • What cable shielding protocols are required for the antenna lead?

    Use only manufacturer-certified double-shielded RF cabling and ensure the host ground terminal connects to functional earth.

  • What are the storage thermal thresholds for this hardware?

    Storage temperature limits must stay within -25 deg C to 65 deg C without condensation or freezing.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More