DS3800HVDB1G1D GE Mark IV Digital I/O Isolator Board
DS3800HVDB1G1D GE Mark IV Digital I/O Isolator Board
DS3800HVDB1G1D GE Mark IV Digital I/O Isolator Board
General Electric

DS3800HVDB1G1D GE Mark IV Digital I/O Isolator Board

SKU: DS3800HVDB1G1D
Categories : All Products
In Stock
  • Dimensions: 28.0 cm x 21.5 cm x 4.0 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The GE DS3800HVDB1G1D, also cataloged as the DS3800HVDB Digital I/O Isolator Board, operates as a dedicated hardware component for galvanic isolation and digital discrete signal conditioning within Mark IV Speedtronic control racks.

Printed Circuit Board Designators & Revision Levels

  • Base Board Number (DS3800HVDB): Base printed circuit board architecture engineered for high-density discrete signal opto-isolation.
  • Revision Level (1G1D): Dynamic hardware revision designation indicating functional artwork revisions and updated component placements.

Physical & Electrical Hardware Attributes

Parameter Specification
Model DS3800HVDB1G1D
Brand GE
Origin USA
Weight 0.45 kg
Shipping Dimensions 28.0 cm x 21.5 cm x 4.0 cm
Operating Temp 0 deg C to +60 deg C
Power Consumption 5.0 W derived from internal rack backplane bus
Isolation Type Optocoupler-based optical channel isolation
Channel Count Multi-channel discrete digital input/output paths
Connector Type Multi-pin card edge and ribbon cable header connectors

System Bus Architecture & Backplane Execution

The circuit board establishes direct electrical connectivity to internal system buses, processing field-side discrete signals through optical isolation stages. Real-time signal transfer preserves backplane bus communication velocity while maintaining deterministic timing across field feedback loops. Firmware flash compatibility across system controller cards enables seamless integration with existing Mark IV system backplanes without requiring bus timing reconfiguration.

Standard Delivery Contents

  • 1 x GE DS3800HVDB1G1D digital I/O isolator circuit board
  • 1 x Anti-static protective enclosure packaging
  • 1 x Board installation and jumper setting sheet

Handling & Installation Protocols

Board Insertion & ESD Protection

  • Wear an earthed anti-static wrist strap prior to removing the circuit board from protective packaging.
  • Align board edges with card cage guide rails and push firmly until edge connectors seat fully into the backplane.

Cable Connections & Grounding

  • Secure flat ribbon cables to front headers using locking tabs to prevent loose pin contact under vibration.
  • Ensure enclosure cabinet frame earthing complies with system ground bus requirements to prevent stray noise coupling.

Frequently Asked Questions

  • What technical role does the DS3800HVDB1G1D board perform in the system?

    It provides galvanic optical isolation for digital input and output signals to protect backplane logic circuits.

  • What does the 1G1D suffix indicate on the part number?

    The 1G1D designation identifies specific hardware revision levels and factory component modifications on the PCB.

  • Is power supplied directly from an external source or via backplane?

    Operational power is pulled directly from the system backplane power rails through edge connectors.

  • Can the board be inserted into a live rack under power?

    No, system rack DC power must be fully isolated before inserting or removing the board to prevent bus corruption.

  • How are field noise surges blocked from the control logic?

    Optocouplers integrated on the board establish galvanic isolation, blocking high-voltage transients from backplane buses.

  • What maintenance step is required before replacing an existing board?

    Verify that all DIP switch and jumper pin configurations on the new board match the removed board exactly.

  • How is the board secured inside the card cage enclosure?

    The board slides into dedicated card cage guide slots and secures using captive screws on the faceplate rail.

  • Does replacing this board require software flashing?

    No, the hardware operates as a passive signal isolation interface and maintains direct firmware flash compatibility.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Nov 19, 2026
Maxwell
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Schneider Electric has announced a strategic collaboration with NVIDIA and Hewlett Packard Enterprise to accelerate...
Read More
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
Nov 19, 2026
Maxwell
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
SpaceX has placed an order with German equipment manufacturer SINGULUS Technologies for a heterojunction (HJT)...
Read More
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Nov 19, 2026
Maxwell
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Rockwell Automation has unveiled PanelView Pro, a next-generation high-performance human-machine interface designed to meet the...
Read More
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
Nov 18, 2026
Maxwell
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
A milestone in the American energy transition is approaching, and it is happening in the...
Read More
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Nov 18, 2026
Maxwell
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Humanoid robots have crossed a threshold from laboratory curiosity to production floor reality in the...
Read More
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
Nov 18, 2026
Maxwell
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
The global industrial automation sector is witnessing a dramatic reshuffling of strategic alliances as SoftBank...
Read More
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
Nov 17, 2026
Maxwell
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
The global electric vehicle battery landscape has undergone a decisive shift. According to data released...
Read More
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Nov 17, 2026
Maxwell
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Honeywell has entered a new chapter. At the ninth China International Import Expo (CIIE), held...
Read More
Siemens Signs Strategic Partnership with Nanjing for Smart Manufacturing Under 15th Five-Year Plan
Nov 17, 2026
Maxwell
Siemens Signs Strategic Partnership with Nanjing for Smart Manufacturing Under 15th Five-Year Plan
Siemens is deepening its roots in one of China's most important manufacturing hubs. On November...
Read More
Apple Unveils HALO Humanoid Robot Autonomous Control System with 91% Task Success Rate
Nov 16, 2026
Maxwell
Apple Unveils HALO Humanoid Robot Autonomous Control System with 91% Task Success Rate
Apple has entered the humanoid robotics race, albeit in characteristically understated fashion. On November 4,...
Read More