NT20S-ST121B-V1 Omron Programmable Terminal NT Series
NT20S-ST121B-V1 Omron Programmable Terminal NT Series
NT20S-ST121B-V1 Omron Programmable Terminal NT Series
NT20S-ST121B-V1 Omron Programmable Terminal NT Series
Omron

NT20S-ST121B-V1 Omron Programmable Terminal NT Series

SKU: NT20S-ST121B-V1
Categories : All Products
In Stock
  • Dimensions: 110 mm x 190 mm x 58 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for real-time operator interface monitoring and parameter visualization in host PLC automation architectures, the Omron NT20S-ST121B-V1 (NT20S Programmable Terminal) provides direct physical/electrical execution.

Alphanumeric Code & Configuration Matrix

  • NT20S: Compact monochrome programmable operator terminal base framework
  • ST: Screen touch panel operator interface type
  • 121: RS-232C point-to-point host interface port configuration
  • B: Black panel frame bezel housing scheme
  • V1: Hardware version code featuring upgraded memory allocation and system firmware

Operational Ratings & Physical Parameters

Parameter Specification
Model NT20S-ST121B-V1
Brand Omron
Origin Japan
Weight 2.0 kg
Shipping Dimensions 110 mm x 190 mm x 58 mm
Operating Temp 0 deg C to 50 deg C
Power Consumption 10 W max.
Input Voltage 24 VDC
Inrush Current 3 A max.
Storage Temperature -20 deg C to 70 deg C
Operating Environment Non-corrosive gases

System Integration & Bus Controller Interfacing

The display terminal communicates via serial links with host PLC backplane structures. Firmware flash compatibility maintains deterministic network synchronization, preserving high backplane bus communication velocity Licences during cycle scans. Internal memory architecture allows steady screen mapping and continuous I/O density scaling without disrupting real-time host controller task execution.

Standard Shipping Enclosure Contents

  • 1 x NT20S-ST121B-V1 Programmable Terminal Base Assembly
  • 4 x Panel Mounting Brackets with Securing Screws
  • 1 x Waterproof Gasket for Enclosure Panel Seal

Installation Instructions & Cabling Guidelines

Cutout Assembly & Panel Mounting

  • Prepare a clean rectangular enclosure panel cutout matching the specified 110 mm x 190 mm frame dimensions.
  • Insert the terminal through the front opening and tighten all four rear mounting brackets evenly to establish an airtight seal.

Power Connection & Grounding Directives

  • Connect regulated 24 VDC supply power to the designated terminal block, ensuring conductor size satisfies voltage drop limits.
  • Establish a direct ground connection from the terminal ground stud to a dedicated earth ground bus to suppress electrical noise.

Technical Inquiry Resolutions

  • What is the rated input power requirement for the terminal?

    The unit operates on a 24 VDC input supply voltage and consumes a maximum electrical power of 10 W.

  • How much peak inrush current occurs during cold startup?

    The power power input circuitry generates a peak inrush current rated at 3 A maximum.

  • What environmental conditions are specified for operation?

    The unit operates from 0 deg C to 50 deg C in atmospheres completely free of corrosive gas contaminants.

  • What physical serial interface port is provided on the module?

    Host serial communication relies on an onboard RS-232C port utilizing standard point-to-point protocol drivers.

  • Can the terminal module be hot-swapped while energized?

    Main 24 VDC system power must be disconnected prior to removing or installing the operator terminal unit.

  • How is the front panel sealed against dust and moisture ingress?

    A continuous rubber mounting gasket secures the front bezel flush against the cutout frame during installation.

  • What temperature range is permissible for equipment storage?

    The terminal withstands non-operational storage temperatures ranging between -20 deg C and 70 deg C.

  • How are user screens flashed and stored on the device?

    Screen layouts and system firmware load into non-volatile internal flash memory via dedicated host software utilities.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More