GJR5144900R0001 35ST90 ABB Connector Procontic T300
GJR5144900R0001 35ST90 ABB Connector Procontic T300
GJR5144900R0001 35ST90 ABB Connector Procontic T300
ABB

GJR5144900R0001 35ST90 ABB Connector Procontic T300

SKU: GJR5144900R0001
Categories : ABB
In Stock
  • Dimensions: 26.1 x 6.2 x 2cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB GJR5144900R0001 35ST90, also cataloged as the GJR5144900R0001 Connector, operates as a dedicated hardware component for signal path routing and electrical termination within Procontic T300 DCS platforms.

Model Identification Data

The GJR5144900R0001 (35ST90) is a passive interconnection module. The part number designates a specific connector assembly tailored for T300 architecture. There are no configurable sub-assemblies for this hardware; it functions as a single-unit interface for field wiring termination to the system backplane.

Hardware Specifications

Parameter Specification
Model GJR5144900R0001 35ST90
Brand ABB
Origin Sweden
Weight 0.24 kg
Shipping Dimensions 26.1 x 6.2 x 2 cm
Operating Temp Industrial Standard
Power Consumption Passive
System Compatibility Procontic T300 / DCS
Interface Connector / Ethernet Router Support

Industrial Control Integration

This connector supports backplane bus communication velocity requirements for Procontic T300 nodes. It facilitates deterministic signal transfer by providing a stable physical interface between field-side wiring and system I/O modules. While the module itself is passive, its geometry allows for high I/O density scaling within constrained cabinet spaces. The physical design ensures firmware flash compatibility with the host system by providing a transparent signal path that does not interfere with data transmission protocols or real-time diagnostic cycles.

Ordering Information

  • GJR5144900R0001 Connector unit

  • Technical specification and installation document

  • Protective packaging for transport

Field Installation Guidelines

  • Mounting: Fix the connector assembly securely to the cabinet rail. Ensure the space-constrained form factor allows for adequate cable bend radii.

  • Termination: Verify all conductor connections to the connector pins are tightened to manufacturer specifications to prevent high-resistance joints.

  • Grounding: Maintain consistent shielding for all connected signals to ensure immunity against electromagnetic interference in the cabinet environment.

  • Inspection: Perform visual verification of pin alignment before mating the connector with the Procontic T300 I/O module.

  • Maintenance: Keep the connector area free of dust and moisture; use a non-conductive contact cleaner if oxidation is detected during routine inspections.

Frequently Asked Questions

  • Q: Is this connector hot-swappable?

    A: No. Power to the Procontic T300 rack must be isolated before mating or un-mating the connector to prevent potential electrical arcing or system faults.

  • Q: Does the connector influence signal propagation delay?

    A: As a passive interconnect, it introduces negligible signal latency; signal timing is governed by the host I/O module and backplane bus.

  • Q: Can this be used for high-speed Ethernet routing?

    A: It serves as a physical interface for signals within systems supporting Ethernet router communication; ensure cable specifications match the required data rate.

  • Q: Is the connector shell shielded?

    A: The connector assembly is designed for use in industrial control cabinets; ensure system grounding protocols are followed for proper shield continuity.

  • Q: What is the maximum wire gauge supported?

    A: Refer to the Procontic T300 hardware manual for the specific wire cross-section limits allowed by the connector terminals.

  • Q: How do I troubleshoot intermittent connectivity?

    A: Check for loose terminal screws, wire breaks, or physical debris inside the connector housing that may impede electrical contact.

  • Q: Does the connector require maintenance?

    A: Routine inspections for corrosion and mechanical integrity are recommended as part of the standard industrial cabinet maintenance cycle.

  • Q: Is it possible to use this in a non-T300 system?

    A: The connector is designed for Procontic T300 architecture; utilization in other systems may result in pin mismatch or mechanical incompatibility.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Comau and Omron Form Strategic Alliance to Expand Next-Gen Industrial Robotics Solutions
Aug 14, 2026
MaxWell
Comau and Omron Form Strategic Alliance to Expand Next-Gen Industrial Robotics Solutions
Strategic automation alliances are reshaping the modern manufacturing landscape, driven by an imperative to boost throughput,...
Read More
Rockwell Automation Faces New Industry Dynamics as AI, Open Architecture and Next-Generation PLC Platforms Reshape Automation
Aug 14, 2026
MaxWell
Rockwell Automation Faces New Industry Dynamics as AI, Open Architecture and Next-Generation PLC ...
Rockwell Automation’s long-established position in industrial control is facing new competitive pressures as the automation...
Read More
OMRON Introduces Next-Generation AMRs to Advance Smart Manufacturing Logistics
Aug 14, 2026
MaxWell
OMRON Introduces Next-Generation AMRs to Advance Smart Manufacturing Logistics
OMRON Robotics is preparing to showcase its latest generation of autonomous mobile robots (AMRs) at Automate...
Read More
Comau and Invent Highlight Smart Automation for Future Industrial Operations
Aug 13, 2026
MaxWell
Comau and Invent Highlight Smart Automation for Future Industrial Operations
Comau and Invent have presented their latest automation and intralogistics technologies at Brasil em Código...
Read More
More Than 4,400 Rockwell PLCs Found Exposed Online Amid Water Sector Cyber Risks
Aug 13, 2026
MaxWell
More Than 4,400 Rockwell PLCs Found Exposed Online Amid Water Sector Cyber Risks
A global scan conducted by cybersecurity researchers has identified thousands of internet-facing Rockwell Automation programmable...
Read More
HII Partners with Robotics Firms to Accelerate AI-Powered Shipbuilding
Aug 13, 2026
MaxWell
HII Partners with Robotics Firms to Accelerate AI-Powered Shipbuilding
Huntington Ingalls Industries (HII) has announced long-term performance-based production agreements with Path Robotics and GrayMatter...
Read More
ABB Powers Allseas’ Next-Generation Offshore Converter Transport Vessel
Aug 12, 2026
MaxWell
ABB Powers Allseas’ Next-Generation Offshore Converter Transport Vessel
ABB has signed a new agreement with Guangzhou Shipyard International (GSI) to provide the complete power...
Read More
Schneider Electric Unveils Digital Mining Technologies for Electra Mining Africa 2026
Aug 12, 2026
MaxWell
Schneider Electric Unveils Digital Mining Technologies for Electra Mining Africa 2026
Schneider Electric will showcase the future of intelligent mining at Electra Mining Africa 2026, presenting...
Read More
Vale and ABB Launch AI Automation Program to Transform Iron Ore Processing
Aug 12, 2026
MaxWell
Vale and ABB Launch AI Automation Program to Transform Iron Ore Processing
Vale S.A. and ABB have entered into a strategic agreement to expand the use of artificial...
Read More
Siemens Redefines Software-Defined Automation via Simatic AX Extensions
Aug 11, 2026
MaxWell
Siemens Redefines Software-Defined Automation via Simatic AX Extensions
In an ongoing effort to democratize software-defined automation, Siemens has rolled out critical updates to its Simatic...
Read More