Allen-Bradley FLEX I/O 1783-US8T Stratix 2000 Unmanaged Switch
Allen-Bradley FLEX I/O 1783-US8T Stratix 2000 Unmanaged Switch
Allen-Bradley

Allen-Bradley FLEX I/O 1783-US8T Stratix 2000 Unmanaged Switch

SKU: 1783-US8T
Categories : All Products
In Stock
  • Dimensions: 25.3 x 20.3 x 10 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for unmanaged Ethernet packet forwarding in industrial automation architectures, the Allen-Bradley 1783-US8T (1783US8T Stratix 2000 Unmanaged Switch) provides direct physical/electrical execution.

Model Identifier & Suffix Matrix

  • Base catalog model: 1783-US8T
  • Order code variant: 1783US8T
  • Hardware revision suffix: 1783-US8T/A
  • Switch architecture: Stratix 2000 unmanaged series

Hardware Specifications

Parameter Specification
Model 1783-US8T
Brand Allen-Bradley
Origin China
Weight 1 kg
Shipping Dimensions 25.3 x 20.3 x 10 cm
Operating Temp Not specified (Standard industrial limits apply)
Power Consumption 4.6 W
Switch Type Unmanaged Switch
Series Stratix 2000
Total Ports 8 RJ45 Copper Ports
DC Input Ratings 250 mA at 12-48 VDC
AC Input Ratings 500 mA at 18-30 VAC (50/60 Hz)
Inrush Current 1.31 A peak

Industrial Control & Drive Integration

The unmanaged switch processes backplane bus communication velocity parameters to ensure deterministic data throughput across connected Allen-Bradley controllers. Profinet and EtherNet/IP deterministic networks integrate smoothly through wire-speed packet forwarding without requiring user configuration tables. Input and output density scaling requirements are supported transparently by maintaining constant link integrity across all 8 copper physical ports.

Ordering Information

  • 1 x 1783-US8T Stratix 2000 Unmanaged Switch hardware unit
  • 1 x Removable power supply connector block

Physical Installation & Field Wiring Guidelines

  • Mount the switch vertically onto a standard DIN rail inside an industrial control enclosure, maintaining proper clearance for natural convection cooling.
  • Terminate the incoming power supply wires securely to the removable terminal plug, verifying that DC voltage stays within 12-48 VDC or AC voltage within 18-30 VAC.
  • Connect shielded Category 5e or higher copper Ethernet cables to the 8 RJ45 ports while observing maximum transmission distance limitations.
  • Attach a low-impedance ground conductor from the designated chassis earth screw directly to the panel backplate to suppress electrical noise.

Frequently Asked Questions

  • Q: Does this unmanaged switch support firmware flash updating or IP address configuration?
  • A: No, the 1783-US8T is a layer 2 unmanaged switch requiring zero software configuration, firmware updates, or network address assignments.
  • Q: What is the peak inrush current value during initial power-up sequence?
  • A: The device draws a maximum inrush current of 1.31 A when initially energized from a stable DC or AC power source.
  • Q: Can the unit be powered using standard industrial AC voltage supplies?
  • A: Yes, the switch supports an AC input voltage range of 18-30 VAC at 50/60 Hz, with a maximum current draw of 500 mA.
  • Q: What is the total power dissipation load during normal operation?
  • A: The hardware consumes a nominal operating power level of 4.6 W under full port load conditions.
  • Q: Are management protocols such as SNMP or VLAN tagging supported on this model?
  • A: No, unmanaged switches lack management software features, meaning VLAN grouping, IGMP snooping, and SNMP monitoring are unavailable.
  • Q: What physical connector type is utilized for all communication links?
  • A: All 8 communication ports utilize standard RJ45 copper connectors supporting 10/100 Mbps auto-negotiation.
  • Q: Is live hot-swapping permitted for Ethernet cables attached to the front ports?
  • A: Yes, copper Ethernet patch cables can be connected or disconnected while the unit is fully powered without causing hardware damage.
  • Q: What is the required mounting orientation inside an electrical cabinet?
  • A: The switch must be mounted upright on a standard DIN rail to allow adequate thermal airflow across the internal circuitry housing.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More