Allen-Bradley 1746-IO8 Combination Input/Output Module SLC 500
Allen-Bradley 1746-IO8 Combination Input/Output Module SLC 500
Allen-Bradley 1746-IO8 Combination Input/Output Module SLC 500
Allen-Bradley

Allen-Bradley 1746-IO8 Combination Input/Output Module SLC 500

SKU: 1746-IO8
Categories : All Products
In Stock
  • Dimensions: 14 x 13 x 3.3 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley 1746-IO8, also cataloged as the 1746IO8 Digital I/O Cards, operates as a dedicated hardware component for discrete signal acquisition and relay switching within programmable logic controller networks.

Part Nomenclature and Catalog Mapping

  • 1746-IO8: Primary catalog designation for the combination module
  • 1746IO8: Standard manufacturer part string without separator hyphens
  • 1746-IO8/: Alternative revision suffix marker for alternate stock tracing

Hardware Specifications

Parameter Specification
Model 1746-IO8
Brand Allen-Bradley
Origin USA
Weight 0.2 kg
Shipping Dimensions 14 cm x 13 cm x 3.3 cm
Operating Temp 0 deg C to +60 deg C (standard industrial enclosure range)
Power Consumption Backplane current draw sourced from chassis power supply
Operating Voltage 85 Volts AC to 132 Volts AC
Channel Configuration 4 inputs and 4 relay outputs
Signal Delay 35 milliseconds to 45 milliseconds
Output Current Capacity 1.2 amps at 24 VDC per output point

Backplane Network Velocity and I/O Scaling

The module communicates via the SLC 500 backplane bus communication velocity framework, establishing deterministic data transfer intervals between the physical terminals and the central processing unit. Backplane bus communication velocity handles discrete state updates within fixed scan cycles, preserving loop timing synchronization across distributed rack expansions. I/O density scaling allows seamless integration alongside specialized analog and communication modules without violating backplane current loading limits or introducing protocol conversion latencies. Firmware flash compatibility is managed through system software tools to maintain baseline operational stability across revision changes.

Ordering Information

  • 1 x Allen-Bradley 1746-IO8 Combination Input/Output Module
  • 1 x Removable Field Wiring Terminal Block Block
  • 1 x Technical Hardware Reference Leaflet

Physical Installation Guidelines

  • Chassis Slot Insertion
    • Ensure system rack power is fully isolated before mounting or dismounting the module to prevent backplane bus damage.
    • Align the circuit board evenly with the internal chassis guide rails and push firmly until the locking latches snap into position.
  • Field Wiring Terminations
    • Strip field conductors to recommended lengths and insert them securely into the removable terminal block screw terminals.
    • Verify that high-voltage AC input lines are separated from low-voltage control loops to reduce electromagnetic interference.

Frequently Asked Technical Inquiries

  • Q: What is the total channel breakdown provided by this module?
  • A: The unit provides 4 discrete inputs and 4 relay outputs.
  • Q: What is the specified operating voltage range for the input channels?
  • A: The input circuits operate within a range of 85 Volts AC to 132 Volts AC.
  • Q: What is the signal delay timing for input and output state changes?
  • A: The signal delay spans between 35 milliseconds and 45 milliseconds.
  • Q: What is the maximum current rating per output point at 24 VDC?
  • A: Each output point delivers up to 1.2 amps at 24 VDC.
  • Q: Does this hardware component support live hot-swapping inside an active rack?
  • A: No, power must be cut from the chassis backplane prior to inserting or removing the module.
  • Q: What are the physical dimensions of the shipping package?
  • A: The shipping dimensions measure 14 cm x 13 cm x 3.3 cm.
  • Q: How much does the packaged hardware unit weigh?
  • A: The total unit weight is 0.2 kg.
  • Q: Why is proper grounding important for the terminal wiring?
  • A: Proper grounding prevents ground loops and suppresses electrical noise from disrupting digital signal integrity.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More
China Intelligent Technology Empowers Global South
Oct 11, 2026
Maxwell
China Intelligent Technology Empowers Global South Mining Development
China's mining intelligence technologies are gaining international recognition as countries across the Global South seek...
Read More
Luliang Builds 62 Intelligent Coal Mines with 678 Positions Achieving Unmanned Operation
Oct 11, 2026
Maxwell
Luliang Builds 62 Intelligent Coal Mines with 678 Positions Achieving Unmanned Operation
The city of Luliang in Shanxi Province has emerged as a showcase for the transformation...
Read More
2026 Hefei International New Energy Vehicle Exhibi
Oct 11, 2026
Maxwell
2026 Hefei International New Energy Vehicle Exhibition Opens September 30
The 2026 Hefei International New Energy Vehicle Exhibition opened on September 30 at the Hefei...
Read More