ABB INICT03A Infi-Net to Computer Transfer Module Infi 90
ABB INICT03A Infi-Net to Computer Transfer Module Infi 90
ABB INICT03A Infi-Net to Computer Transfer Module Infi 90
ABB

ABB INICT03A Infi-Net to Computer Transfer Module Infi 90

SKU: INICT03A
Categories : ABB
In Stock
  • Dimensions: 3.7 x 31.7 x 17.8 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB INICT03A, also cataloged as the INICT03A Infi-Net to Computer Transfer Module, serves as the primary INICT03A Transfer Module utilized to execute high-bandwidth asynchronous and synchronous bidirectional protocol translation across Infi 90 platforms.

Physical and Electrical Specifications

Parameter Specification
Model INICT03A
Brand ABB
Origin Sweden
Weight 0.54 kg
Shipping Dimensions 3.7 x 31.7 x 17.8 cm
ROM Memory Capacity 512 kbytes
RAM Memory Capacity 2 Mbytes
Input Voltage Required +5 VDC (operating tolerance ±5%)
Power Consumption 9.8 W typical (10 W maximum)
Operating Current 1.958 A typical
Serial Communication Rates 50 to 19,200 baud (user-selectable)
Parallel Communication Rate 4 Mbytes/sec via dedicated SCSI port
Module Mounting Profile Occupies exactly one slot in standard INFI 90 module mounting unit
Operating Temp -40 to +70 deg C
Storage Temp -40 to +85 deg C
Relative Humidity Range 5% to 95% RH (non-condensing)
Tariff Code 8537101190

Backplane Bus Communication Velocity and Firmware Compatibility

The module integrates directly into the INFI 90 cabinet backplane, matching internal backplane bus communication velocity constraints to prevent processing bottlenecks during multi-node broadcast storms. Onboard execution logic relies on a designated firmware flash compatibility matrix to synchronize data packets between the 512 kbytes ROM block and the host computer operating system environment.

The 2 Mbytes RAM array buffers transient real-time process data, enabling uninhibited throughput configuration shifts without disturbing concurrent I/O density scaling routines across parallel controller slots. The embedded system hardware monitors transmission parity and frame alignment errors, processing local protocol translations directly inside the network layer before presenting the output vector to the host bus interface.

Technical Performance Queries

Q: What is the procedure for altering the serial interface baud rate on the module?

A: Adjustments must be performed prior to installation by setting the physical dual-inline package (DIP) switch configurations located on the primary circuit board to match the desired baud value from 50 to 19,200 baud.

Q: How does the SCSI port interface function under continuous communication scenarios?

A: The SCSI port functions as a high-speed parallel interface running at 4 Mbytes/sec, utilizing direct memory access (DMA) transfers to move data blocks from the module 2 Mbytes RAM directly to the host application memory buffer without overloading the central processing unit.

Q: Can the module withstand continuous operation at elevated temperatures without thermal throttling?

A: Yes, the hardware components are rated for continuous industrial execution across a standard thermal profile of -40 to +70 deg C, assuming the module mounting unit fan assemblies deliver unhindered forced-air vertical cooling vector paths.

Q: Is hot-swapping supported for the module during active system monitoring?

A: No, live removal or insertion of the module while the backplane is energized creates inductive voltage spikes that risk damaging the onboard CMOS memory chips and terminating active data streams on the serial or parallel link.

Field Insertion and Earthing Protocols

  • Completely isolate the power source feeding the specific INFI 90 module mounting unit compartment before attempting module insertion.

  • Align the upper and lower circuit board edges with the molded plastic track guides of the chassis frame to ensure parallel entry.

  • Smoothly press the card slide lock mechanism home until the rear connectors mate securely with the backplane pin distribution block.

  • Verify that the integrated metal grounding clip achieves clean, unpainted surface contact with the system enclosure sub-rack frame to ground static accumulation paths.

  • Fasten front panel captive retention screws to a torque specification of 0.45 Nm to minimize vibration-induced connection failure risk.

Package Component Checklist

  • One fully assembled INICT03A transfer module unit.

  • Pre-configured onboard jumper configuration headers.

  • Factory electrical performance verification datasheet.

Logistical Dispatch Profiles

Delivery time: 2-7 days when payment finish, utilizing international expedited shipping networks via DHL, FEDEX, or UPS. The module is enclosed inside moisture-impermeable, anti-static industrial packaging assemblies lined with precise physical shock-mitigation foam layers to safeguard micro-component integrity during transit.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More