ABB 3AFE61004955 YPC111A Output Distributor Module 61004955
ABB 3AFE61004955 YPC111A Output Distributor Module 61004955
ABB 3AFE61004955 YPC111A Output Distributor Module 61004955
ABB

ABB 3AFE61004955 YPC111A Output Distributor Module 61004955

SKU: YPC111A 3AFE61004955
Categories : ABB
In Stock
  • Dimensions: 15.5 x 8 x 5 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB 3AFE61004955, also cataloged as the YPC111A Output Distributor Module, operates as a dedicated hardware component for optical signal distribution within industrial automation architecture.

Designation Matrix & Nomenclature

Designation Field Identifier / Value
Product Family YPC Series
Model Code YPC111A
Spare Part Number 61004955
Ordering Identifier 3AFE61004955
Component Class Optical Distributor Module

Hardware Specifications

Parameter Specification
Model YPC111A
Brand ABB
Origin Switched manufacturing facility (Verify nameplate)
Weight 0.42 kg
Shipping Dimensions 15.5 x 8 x 5 cm
Operating Temp -10 deg C to +55 deg C
Power Consumption 2.5 W nominal via backplane bus
Core Function Optical pulse and signal fan-out distribution
Mounting Type DIN-rail / Panel mounting footprint

Industrial Controller Architecture & Bus Integration

The unit interfaces directly with local backplane communication vectors, handling deterministic network data packets and converting them across optical transmission mediums. Data transmission speed adheres to standard industrial bus latency thresholds, ensuring low jitter during signal splitting operations. The backplane bus communication velocity requires strict adherence to maximum node limitations to prevent communication timeouts. Firmware flash compatibility is maintained through authorized system configuration tools, preventing version mismatch errors during hot-replacement cycles.

Package Configuration & Contents

  • 1 x ABB YPC111A Output Distributor Module
  • 1 x Protective anti-static deployment shielding bag
  • 1 x Factory conformance inspection slip

Mechanical & Electrical Installation Guidelines

  • Grounding Requirements: Secure the module chassis directly to the grounded metal cabinet backplane to eliminate high-frequency electromagnetic interference.
  • Ambient Airflow: Maintain a minimum vertical clearance of 50 mm above and below the module housing to facilitate natural convection cooling.
  • Optical Fiber Handling: Ensure optical transceiver ports are free from dust contamination; attach protective dust caps immediately if fiber jumpers are detached.
  • Terminal Torquing: Tighten all pluggable terminal block screws to a torque rating of 0.5 Nm to prevent intermittent electrical contact.

Operational Inquiry & Troubleshooting

  • Q: Does this module support live insertion and removal under power?

    A: Hot-swapping is restricted; disconnect system power prior to physical extraction to prevent backplane bus latch-up.

  • Q: What is the maximum optical attenuation budget supported by the distribution ports?

    A: The optical transceiver output power is calibrated for standard industrial runs up to 100 meters using multimode fiber.

  • Q: How is internal fault status indicated on the front panel?

    A: Diagnostic status LEDs illuminate solid green for normal operation and flash red during communication bus faults.

  • Q: Can the unit operate in environments exceeding +55 deg C?

    A: Operation above +55 deg C requires derating of output distribution capacity or forced-air cabinet cooling.

  • Q: What protocol governs the internal signal routing of the distributor?

    A: The module manages proprietary optical layer telegrams mapped directly from the host rack controller.

  • Q: Is external power supply fusing required for the 24 VDC supply input?

    A: Yes, install an external 2.0 A fast-acting fuse on the incoming power feed to protect internal circuitry.

  • Q: What maintenance is required for optical interfaces over time?

    A: Periodic inspection using lint-free optical cleaning swabs is recommended every 12 months in dusty environments.

  • Q: How does firmware updating occur on this specific hardware revision?

    A: Firmware flashing must be executed via the master controller interface using designated engineering software.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Assembly
Oct 15, 2026
Maxwell
Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Ass...
On September 29, 2026, the Future Astronaut Xiongan Smart Manufacturing Base officially commenced operations in...
Read More
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
Oct 15, 2026
Maxwell
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
The 2026 World Manufacturing Conference, held September 20-23 in Hefei, Anhui Province, concluded with an...
Read More
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More