20F14NC104JA0NNNNN Allen-Bradley PowerFlex 753 AC Drive
20F14NC104JA0NNNNN Allen-Bradley PowerFlex 753 AC Drive
20F14NC104JA0NNNNN Allen-Bradley PowerFlex 753 AC Drive
Allen-Bradley

20F14NC104JA0NNNNN Allen-Bradley PowerFlex 753 AC Drive

SKU: 20F14NC104JA0NNNNN
Categories : All Products
In Stock
  • Dimensions: 29.5 x 40.5 x 17.2 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley 20F14NC104JA0NNNNN serves as the primary PowerFlex 753 AC Drive utilized to execute speed and torque regulation of three-phase induction motors across factory automation platforms.

Physical and Electrical Parameter Array

Parameter Specification
Model 20F14NC104JA0NNNNN
Brand Allen-Bradley
Origin USA
Weight 6 kg
Shipping Dimensions 29.5 cm x 40.5 cm x 17.2 cm
Operating Temp Not stated
Power Consumption 4 kW Normal Duty / 2.2 kW Heavy Duty (Frame 1 parameters)
Output Current 8.7 Amps
Voltage Class 400 VAC, 3 PH / 540 VDC
Enclosure Type IP20, NEMA/UL Type Open, Frame 1
Frame Size Frame 1
Protection Type Standard Protection, Forced Air Cooling
Input Type AC Input with DC Terminals, w/Precharge
Filtering Options Filtered, CM jumper installed
Dynamic Braking DB Transistor
Integrated Hardware Embedded I/O

Deterministic Network Architecture and Firmware Execution

The variable frequency drive interfaces with host processing units via high-velocity backplane bus communication channels. Deterministic networks, such as EtherNet/IP topologies, enable real-time parameter tracking and drive synchronization. Firmware flash compatibility ensures unified control execution profiles across connected Logix architectures, optimizing overall I/O density scaling.

Procurement Package Content

  • 1 x 20F14NC104JA0NNNNN AC Drive

  • 1 x Integrated I/O Terminal Kit

Field Installation Procedures

  • Mechanical Placement

    Mount the Frame 1 open-type chassis vertically inside a protective industrial enclosure capable of preventing dust ingress. Maintain standard clearance zones for forced air cooling paths.

  • Electrical Termination

    Connect line power to the AC input or common DC bus lines to the DC terminals. Verify that the pre-installed common mode jumper matches the plant grid grounding topology.

  • Wiring Constraints

    Route low-voltage control circuits and embedded I/O signal lines through dedicated pathways isolated from high-power input and motor wiring to mitigate electromagnetic interference.

Field Infrastructure Verification

  • Is this drive configuration hot-swappable?

    No, this power conversion device cannot be serviced while energized. All input voltage lines must be isolated and verified de-energized before handling.

  • Does this model contain an internal dynamic braking transistor?

    Yes, the unit contains an internal dynamic braking transistor, but the actual braking resistors must be sized and wired externally.

  • What is the enclosure environmental rating?

    The unit has an IP20, NEMA/UL Open Type physical construction requiring integration into a secondary protective control cabinet.

  • Can this model interface directly with a common DC bus system?

    Yes, this specific hardware configuration features AC input with dedicated DC terminals to allow direct connection to a standard common DC bus link.

  • How is the internal filtering jumper utilized?

    The pre-installed jumper connects the internal filter networks to ground. It must be configured based on the system earthing setup.

  • What cooling method does this frame configuration use?

    Thermal management is achieved via forced air cooling paths through the internal heat sink assembly.

  • How does firmware flash compatibility affect operation?

    The drive firmware must match the host controller configuration profiles to maintain data structure alignment during runtime.

  • What is the maximum continuous current rating for this device?

    The module supports a continuous output current of 8.7 Amps when operating under rated normal duty load parameters.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Nextek Industrial Internet Platform Empowers SME Digital Transformation
Oct 22, 2026
Maxwell
Nextek Industrial Internet Platform Empowers SME Digital Transformation
The Nextek Industrial Internet Platform has emerged as a transformative force in China's manufacturing sector,...
Read More
26th China International Industry Fair to Showcase Smart Manufacturing in Shanghai
Oct 22, 2026
Maxwell
26th China International Industry Fair to Showcase Smart Manufacturing in Shanghai
The 26th China International Industry Fair (CIIF), scheduled for September 23-27, 2026, in Shanghai, promises...
Read More
China Industrial Robot Installations Reach Record 354000 Units in 2025
Oct 22, 2026
Maxwell
China Industrial Robot Installations Reach Record 354000 Units in 2025
China's dominance in the global industrial robotics market reached new heights in 2025, with the...
Read More
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
Oct 21, 2026
Maxwell
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
In a strategic move that signals China's growing ambitions in offshore wind installation services, Dajin...
Read More
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Oct 21, 2026
Maxwell
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Boston Dynamics, the robotics subsidiary of Hyundai Motor Group, has officially inaugurated its "Robot Meta-Factory...
Read More
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Oct 21, 2026
Maxwell
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Chengdu Economic and Technological Development Zone hosted a landmark conference on September 23, 2026, bringing...
Read More
OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More