140ARI03010 Schneider Electric Analog Input Module Modicon Quantum
140ARI03010 Schneider Electric Analog Input Module Modicon Quantum
140ARI03010 Schneider Electric Analog Input Module Modicon Quantum
Schneider Electric

140ARI03010 Schneider Electric Analog Input Module Modicon Quantum

SKU: 140ARI03010
Categories : All Products
In Stock
  • Dimensions: 4.7 cm x 16.5 cm x 31.4 cm
  • Country of origin: France
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for precision temperature data acquisition in Modicon Quantum automation platforms, the Schneider Electric 140ARI03010 (140ARI03010 Analog Input Module) provides direct physical electrical execution for 8 differential temperature probe inputs.

Technical Model Matrix

The 140ARI03010 is an 8-channel analog input module designed for temperature sensing via RTD probes. It supports Pt100, Pt200, Pt500, Pt1000 and Ni100, Ni200, Ni500, Ni1000 sensors, utilizing 13-bit resolution to process thermal signals across multiple range settings.

Hardware Specifications

Parameter Specification
Model 140ARI03010
Brand Schneider Electric
Origin Refer to product labeling
Weight 0.3 kg
Shipping Dimensions 4.7 cm x 16.5 cm x 31.4 cm
Operating Temp 0 to 60 deg C
Power Consumption 200 mA (Bus current) / 1 W (Power dissipation)
Input Channels 8 (Differential)
Resolution 13 bits
Accuracy +/- 0.1 deg C absolute error

System Integration and Communication

The Quantum platform architecture relies on standardized backplane communication for module polling and data updates. The 140ARI03010 requires 9 input words for register mapping within the PLC memory. Bus communication velocity is consistent with the Quantum backplane timing, and firmware compatibility should be verified within the Unity Pro or EcoStruxure Control Expert environments to ensure correct hardware configuration of the thermal scanning cycle.

Ordering Info

  • 1 x 140ARI03010 Analog input module

  • 1 x Technical installation instruction

  • Note: Field terminal connectors are required for external wiring and are typically supplied with the associated mounting base.

Field Installation Guidelines

  • Mounting: Ensure the module is fully seated into the Quantum backplane rack. Secure the locking mechanism to maintain electrical contact and structural stability.

  • Shielding: Connect probe shields to the designated chassis ground terminal on the terminal block to prevent electromagnetic interference.

  • Wiring: Maintain consistent cable lengths between probe types; use 3-wire configurations for leads exceeding 5 m to compensate for line resistance variations.

  • Environment: Verify the local ambient temperature does not exceed 60 deg C and ensure the installation site is free from corrosive gasses or excessive dust accumulation.

Frequently Asked Questions

  • Q: Does this module support hot-swapping?

    A: No, the 140ARI03010 does not support hot-swapping. The rack power must be cycled off before extracting or inserting the module to prevent electrical damage to the backplane pins.

  • Q: How are broken wires detected?

    A: The module internal logic monitors the loop integrity. If an open circuit occurs, the channel status LED indicates a fault, and the diagnostic register is updated.

  • Q: Is the input isolated from the backplane?

    A: Yes, the module provides 1780 VAC isolation between the input channels and the internal bus.

  • Q: Can I mix Pt100 and Ni100 probes on the same module?

    A: Yes, channels are independently configurable for specific sensor types through the software configuration menu.

  • Q: What is the update time for 3-wire measurements?

    A: The module provides an update time of 1200 ms for 3-wire probe configurations.

  • Q: Is external power required for the probes?

    A: No, the module provides the necessary excitation current (0.5 mA or 2.5 mA) internally for the connected RTD sensors.

  • Q: How many words are consumed in the PLC memory?

    A: The module requires 9 input words for data and status reporting.

  • Q: What does the red fault LED indicate?

    A: A red fault LED signals either a broken wire (open circuit), an out-of-range signal, or a hardware failure detected by the internal self-diagnostic routines.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Nextek Industrial Internet Platform Empowers SME Digital Transformation
Oct 22, 2026
Maxwell
Nextek Industrial Internet Platform Empowers SME Digital Transformation
The Nextek Industrial Internet Platform has emerged as a transformative force in China's manufacturing sector,...
Read More
26th China International Industry Fair to Showcase Smart Manufacturing in Shanghai
Oct 22, 2026
Maxwell
26th China International Industry Fair to Showcase Smart Manufacturing in Shanghai
The 26th China International Industry Fair (CIIF), scheduled for September 23-27, 2026, in Shanghai, promises...
Read More
China Industrial Robot Installations Reach Record 354000 Units in 2025
Oct 22, 2026
Maxwell
China Industrial Robot Installations Reach Record 354000 Units in 2025
China's dominance in the global industrial robotics market reached new heights in 2025, with the...
Read More
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
Oct 21, 2026
Maxwell
Dajin Heavy Industry Signs Offshore Wind Installation Vessel Contract with Ulstein
In a strategic move that signals China's growing ambitions in offshore wind installation services, Dajin...
Read More
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Oct 21, 2026
Maxwell
Boston Dynamics Atlas Robot Enters Hyundai Motor Georgia Factory
Boston Dynamics, the robotics subsidiary of Hyundai Motor Group, has officially inaugurated its "Robot Meta-Factory...
Read More
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Oct 21, 2026
Maxwell
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Chengdu Economic and Technological Development Zone hosted a landmark conference on September 23, 2026, bringing...
Read More
OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More