140ARI03010 Schneider Electric Analog Input Module Modicon Quantum
140ARI03010 Schneider Electric Analog Input Module Modicon Quantum
140ARI03010 Schneider Electric Analog Input Module Modicon Quantum
Schneider Electric

140ARI03010 Schneider Electric Analog Input Module Modicon Quantum

SKU: 140ARI03010
Categories : All Products
In Stock
  • Dimensions: 4.7 cm x 16.5 cm x 31.4 cm
  • Country of origin: France
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for precision temperature data acquisition in Modicon Quantum automation platforms, the Schneider Electric 140ARI03010 (140ARI03010 Analog Input Module) provides direct physical electrical execution for 8 differential temperature probe inputs.

Technical Model Matrix

The 140ARI03010 is an 8-channel analog input module designed for temperature sensing via RTD probes. It supports Pt100, Pt200, Pt500, Pt1000 and Ni100, Ni200, Ni500, Ni1000 sensors, utilizing 13-bit resolution to process thermal signals across multiple range settings.

Hardware Specifications

Parameter Specification
Model 140ARI03010
Brand Schneider Electric
Origin Refer to product labeling
Weight 0.3 kg
Shipping Dimensions 4.7 cm x 16.5 cm x 31.4 cm
Operating Temp 0 to 60 deg C
Power Consumption 200 mA (Bus current) / 1 W (Power dissipation)
Input Channels 8 (Differential)
Resolution 13 bits
Accuracy +/- 0.1 deg C absolute error

System Integration and Communication

The Quantum platform architecture relies on standardized backplane communication for module polling and data updates. The 140ARI03010 requires 9 input words for register mapping within the PLC memory. Bus communication velocity is consistent with the Quantum backplane timing, and firmware compatibility should be verified within the Unity Pro or EcoStruxure Control Expert environments to ensure correct hardware configuration of the thermal scanning cycle.

Ordering Info

  • 1 x 140ARI03010 Analog input module

  • 1 x Technical installation instruction

  • Note: Field terminal connectors are required for external wiring and are typically supplied with the associated mounting base.

Field Installation Guidelines

  • Mounting: Ensure the module is fully seated into the Quantum backplane rack. Secure the locking mechanism to maintain electrical contact and structural stability.

  • Shielding: Connect probe shields to the designated chassis ground terminal on the terminal block to prevent electromagnetic interference.

  • Wiring: Maintain consistent cable lengths between probe types; use 3-wire configurations for leads exceeding 5 m to compensate for line resistance variations.

  • Environment: Verify the local ambient temperature does not exceed 60 deg C and ensure the installation site is free from corrosive gasses or excessive dust accumulation.

Frequently Asked Questions

  • Q: Does this module support hot-swapping?

    A: No, the 140ARI03010 does not support hot-swapping. The rack power must be cycled off before extracting or inserting the module to prevent electrical damage to the backplane pins.

  • Q: How are broken wires detected?

    A: The module internal logic monitors the loop integrity. If an open circuit occurs, the channel status LED indicates a fault, and the diagnostic register is updated.

  • Q: Is the input isolated from the backplane?

    A: Yes, the module provides 1780 VAC isolation between the input channels and the internal bus.

  • Q: Can I mix Pt100 and Ni100 probes on the same module?

    A: Yes, channels are independently configurable for specific sensor types through the software configuration menu.

  • Q: What is the update time for 3-wire measurements?

    A: The module provides an update time of 1200 ms for 3-wire probe configurations.

  • Q: Is external power required for the probes?

    A: No, the module provides the necessary excitation current (0.5 mA or 2.5 mA) internally for the connected RTD sensors.

  • Q: How many words are consumed in the PLC memory?

    A: The module requires 9 input words for data and status reporting.

  • Q: What does the red fault LED indicate?

    A: A red fault LED signals either a broken wire (open circuit), an out-of-range signal, or a hardware failure detected by the internal self-diagnostic routines.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
Sep 01, 2026
MaxWell
OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
OMRON Robotics is showcasing its latest mobile industrial automation advancements at Automate 2026 in Chicago,...
Read More
Frontieras Taps Yokogawa for $850M West Virginia Processing Plant Automation
Sep 01, 2026
MaxWell
Frontieras Taps Yokogawa for $850M West Virginia Processing Plant Automation
Frontieras North America has selected Yokogawa Corporation of America as the Main Automation Contractor (MAC)...
Read More
Yokogawa Secures MAC Contract for $13B Commonwealth LNG Facility
Sep 01, 2026
MaxWell
Yokogawa Secures MAC Contract for $13B Commonwealth LNG Facility
Yokogawa Corporation of America has been selected as the Main Automation Contractor (MAC) for the...
Read More
Baker Hughes Secures $7.1 Billion Record Orders Driven by Industrial Power Demand
Aug 31, 2026
MaxWell
Baker Hughes Secures $7.1 Billion Record Orders Driven by Industrial Power Demand
Energy technology provider Baker Hughes posted second-quarter revenues of $6.74 billion, navigating strategic divestitures while...
Read More
Mitsubishi Electric Consolidates North American Operations Under US Division Strategic Restructure
Aug 31, 2026
MaxWell
Mitsubishi Electric Consolidates North American Operations Under US Division Strategic Restructure
Mitsubishi Electric US, Inc. (MEUS) has initiated a structural consolidation of its United States enterprise...
Read More
Finnvera Secures Up to $132M Export Credit Financing Support for Troilus Copper-Gold Mine Development
Aug 31, 2026
MaxWell
Finnvera Secures Up to $132M Export Credit Financing Support for Troilus Copper-Gold Mine Develop...
Troilus Mining has secured non-binding support for up to $132 million in export credit support from Finland's...
Read More
First Mining Reaches Development Deal With Ontario First Nations
Aug 30, 2026
MaxWell
First Mining Reaches Development Deal With Ontario First Nations
Cat Lake First Nation (CLFN), Lac Seul First Nation (LSFN) and First Mining Gold have...
Read More
Cabral Gold Uncovers High-Grade Extension at Cuiú Cuiú Ahead of September Initial Pour
Aug 30, 2026
MaxWell
Cabral Gold Uncovers High-Grade Extension at Cuiú Cuiú Ahead of September Initial Pour
Cabral Gold has identified a promising new mineralized strike at its Cuiú Cuiú project in northern Brazil, expanding...
Read More
Boliden Expands in Latin America With $1.3B Nexa Deal
Aug 30, 2026
MaxWell
Boliden Expands in Latin America With $1.3B Nexa Deal
Swedish mining group Boliden has agreed to acquire Votorantim’s 65% controlling stake in Nexa Resources...
Read More
Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
Aug 29, 2026
Maxwell PLC Ltd
Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
At the ACG Caving Conference 2026 in Ulaanbaatar, mining technology developer Sandvik formally introduced xCell...
Read More