Pepperl+Fuchs Z728 Z-System Zener Barrier 2-Channel 28V 300 Ohm
Pepperl+Fuchs Z728 Z-System Zener Barrier 2-Channel 28V 300 Ohm
Pepperl+Fuchs Z728 Z-System Zener Barrier 2-Channel 28V 300 Ohm
Pepperl+Fuchs Z728 Z-System Zener Barrier 2-Channel 28V 300 Ohm
Pepperl + Fuchs

Pepperl+Fuchs Z728 Z-System Zener Barrier 2-Channel 28V 300 Ohm

SKU: Z728
Categories : All Products
In Stock
  • Dimensions: 1.25 cm x 11.5 cm x 11.0 cm
  • Country of origin: Germany
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Pepperl+Fuchs Z728 serves as a fundamental protective component within the Z-System, providing cost-effective intrinsic safety for electrical circuits in hazardous areas. This dual-channel Zener barrier limits the energy transferred from the safe area to the explosive atmosphere, preventing sparks or thermal effects from causing ignition. By utilizing high-quality shunt zeners, resistors, and fuses, the Z728 safeguards instrumentation loops such as solenoid valves, transmitters, and proximity sensors. This module proves indispensable in oil refineries, gas processing plants, and chemical storage facilities where preventing electrical faults from entering Zone 0 or Zone 1 is a critical safety mandate. Its compact, DIN-rail mountable design allows for high-density installation within control cabinets while maintaining the rigid safety integrity required for hazardous operations.

Core Technical Advantages

This Zener barrier utilizes a DC-version hardware architecture, specifically designed for positive polarity loops where the safe-area voltage remains referenced to ground. The Z728 incorporates a 28V working voltage limit and a 300 Ohm internal resistor to precisely control current flow into the hazardous zone. The dual-channel configuration enables the protection of two independent signal lines or a single balanced loop within one 12.5mm housing, maximizing cabinet space efficiency. Unlike isolated barriers, the Z728 relies on a high-integrity ground connection to shunt excess energy safely, ensuring that any fault voltage remains clamped below the ignition threshold of volatile gases. The robust internal fuse protects the zener diodes from prolonged overvoltage conditions, ensuring the device remains a reliable "last line of defense" in your safety architecture.

Technical Specifications

Feature Specifications
Number of Channels 2-Channel
Working Voltage (Uw) Max. 26.9 V
Zener Voltage (Uz) 28 V
Series Resistance Min. 301 Ohm / Max. 327 Ohm
Fuse Rating 50 mA
Polarity Positive (DC version)
Connection Type Screw Terminals
Mounting 35mm DIN Rail
Operating Temperature -20 °C to 60 °C (-4 °F to 140 °F)
Dimensions 12.5mm (W) x 115mm (H) x 110mm (D)
Approximate Weight 150 g

Installation Guide

Engineers must mount the Z728 on a standard 35mm DIN rail that is directly bonded to a high-integrity Intrinsic Safety (IS) Earth ground. The resistance between the barrier's ground terminal and the main plant earth must remain below 1 Ohm to guarantee effective energy shunting during a fault. When wiring, ensure that hazardous area cables remain physically separated from safe-area cables by at least 50mm to prevent inductive or capacitive coupling. Technical staff should verify that the supply voltage does not exceed the 26.9V working voltage (Uw) during normal operation, as exceeding this limit will cause leakage current through the zeners and may eventually blow the internal fuse. For maintenance, always test the continuity of the fuse via the designated terminals if the loop signal is lost.

Engineering Advantages

The Z728 offers a streamlined engineering advantage for projects where budget-conscious safety is a priority without sacrificing Pepperl+Fuchs reliability. Its passive design requires no external power supply, simplifying the electrical distribution within the cabinet and reducing heat generation. The Z728 integrates seamlessly with a wide range of DC-powered field devices, offering universal compatibility for digital or analog loops that share a common ground. This reliability in extreme environments ensures that your safety loops remain active for decades, providing a durable barrier against transients and catastrophic electrical failures in high-risk processing zones.

Delivery & Logistics

Delivery Time: 3-5 days once payment is finalized.

Shipping Carriers: Shipped globally via DHL, FEDEX, or UPS. Every unit is dispatched in anti-static packaging within its original factory-sealed box to guarantee performance upon arrival.

Technical FAQs

Q1: What is the difference between the Z728 and an isolated barrier like the KFD2-STC5-1?

A1: The Z728 is a passive Zener barrier that requires a high-quality ground (IS Earth) to function. An isolated barrier uses galvanic isolation and does not require an IS Earth ground, making it more suitable for systems with ground loop interference.

Q2: Can I use the Z728 for AC signals?

A2: No. The Z728 is a DC-version barrier with positive polarity. For AC signals or bipolar signals, you must select an AC-version barrier (usually designated with "AC" or a different model series) that can handle voltage swings above and below ground.

Q3: What happens if the internal fuse blows?

A3: If the internal fuse blows due to a surge or overvoltage, the barrier must be replaced. The fuse is encapsulated within the unit to prevent tampering and ensure that the safety parameters of the barrier are never compromised.

Q4: Why is the grounding so critical for the Z728?

A4: Because the Z728 "shunts" excess energy to ground during a fault, the ground path is the only thing preventing that energy from reaching the hazardous area. A poor ground connection would allow the voltage in the hazardous area to rise to dangerous, ignitable levels.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Schneider Expands U.S. Manufacturing Infrastructure as ForwardX and Lynx Drive European AMR Growth
Jul 20, 2026
MaxWell
Schneider Expands U.S. Manufacturing Infrastructure as ForwardX and Lynx Drive European AMR Growth
The industrial automation and power distribution sectors are undergoing rapid transformations driven by the exponential...
Read More
Weintek Redefines Floor Mobility with New cMT3106XM Handheld HMI
Jul 20, 2026
MaxWell
Weintek Redefines Floor Mobility with New cMT3106XM Handheld HMI
As manufacturing facilities grow in size and operational complexity, fixed control panel layouts can introduce...
Read More
Wenglor Launches AI Lab to Streamline Industrial Image Processing Workflows
Jul 19, 2026
MaxWell
Wenglor Launches AI Lab to Streamline Industrial Image Processing Workflows
Wenglor Sensoric Group has unveiled its new AI Lab, a cloud-based platform engineered to accelerate the...
Read More
AutoStore Unveils Fall 2025 Portfolio to Enhance Warehouse Throughput and Operational Efficiency
Jul 19, 2026
MaxWell
AutoStore Unveils Fall 2025 Portfolio to Enhance Warehouse Throughput and Operational Efficiency
AutoStore has officially launched its Fall 2025 product portfolio, introducing a suite of seven modular...
Read More
Ati Motors Introduces Sherpa Mecha for Adaptive Industrial Automation
Jul 19, 2026
MaxWell
Ati Motors Introduces Sherpa Mecha for Adaptive Industrial Automation
Ati Motors has expanded the boundaries of robotic material handling with the launch of Sherpa...
Read More
Cincoze Expands Industrial Edge Capabilities with MD-3000 DIN-Rail Computer Series
Jul 18, 2026
MaxWell
Cincoze Expands Industrial Edge Capabilities with MD-3000 DIN-Rail Computer Series
Cincoze has bolstered its MAGNET industrial computing portfolio with the launch of the MD-3000 series,...
Read More
Banner Engineering Enhances Predictive Maintenance with IO-Link Enabled QM30VT3 Sensors
Jul 18, 2026
MaxWell
Banner Engineering Enhances Predictive Maintenance with IO-Link Enabled QM30VT3 Sensors
Banner Engineering has updated its QM30VT3 three-axis vibration and temperature sensor, integrating IO-Link connectivity to bridge the...
Read More
Yokogawa Launches OpreX A8 Edge Controller to Streamline Data-Centric Automation
Jul 18, 2026
MaxWell
Yokogawa Launches OpreX A8 Edge Controller to Streamline Data-Centric Automation
Yokogawa has officially unveiled its new OpreX Intelligent Edge Controller A8, a Linux-based platform engineered to...
Read More
ABB Launches Baldor-Reliance SP4 Shaft-Ground Motors for Longer VSD Service Life
Jul 17, 2026
MaxWell
ABB Launches Baldor-Reliance SP4 Shaft-Ground Motors for Longer VSD Service Life
ABB has introduced a new addition to its Baldor-Reliance SP4 motor portfolio, bringing integrated shaft-grounding...
Read More
Rockwell Automation Expands Global R&D Footprint with New Prague Advanced Technology Lab
Jul 17, 2026
MaxWell
Rockwell Automation Expands Global R&D Footprint with New Prague Advanced Technology Lab
Rockwell Automation has officially inaugurated a dedicated advanced technology research lab in Prague, Czech Republic, signaling...
Read More