DS200TCPSG1A GE DS200TCPSG1AME DC Input Power Supply Circuit Board
DS200TCPSG1A GE DS200TCPSG1AME DC Input Power Supply Circuit Board
DS200TCPSG1A GE DS200TCPSG1AME DC Input Power Supply Circuit Board
General Electric

DS200TCPSG1A GE DS200TCPSG1AME DC Input Power Supply Circuit Board

SKU: DS200TCPSG1AME
Categories : All Products
In Stock
  • Dimensions: 28 × 21.3 × 6.8 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The GE DS200TCPSG1AME is a DC input power supply circuit board used in Mark V turbine control panels to convert incoming station DC into regulated voltages required by multiple control and I/O functions. It is commonly supplied from a 125 VDC source and distributes conditioned power to connected control cards and field-support circuits. Typical loads supported by the power distribution architecture include sensor excitation and signal conditioning circuits, servo/actuator drive interfaces, and processor-related supply rails used by the Mark V control core.

This board is installed as part of the cabinet power subsystem and is intended as a direct replacement item where maintaining original Mark V power topology and connector interfaces is necessary.

Electrical and Hardware Characteristics

Item Specification
Model / Part number DS200TCPSG1AME
Module category DC Input Power Supply Circuit Board
Control platform association Mark V (Speedtronic legacy)
Input supply (common) 125 VDC via power input connector (system dependent)
Power distribution Multiple output feeds to associated Mark V boards via harness/plug connectors
On-board protection Fuses and surge suppression components (MOVs)
Power conversion elements Transformers, inductors, heat sinks, resistor networks (design dependent)
Diagnostics Dedicated test points for voltage verification and troubleshooting
Configuration No user setup typically required; replacement is revision/part-number dependent
Condition Brand New
Lead time In Stock
Weight 1.2 kg
Dimensions (listing) 28 × 21.3 × 6.8 cm
Country of origin (listing) USA
HS code (listing) 8537101190
System category DCS / turbine control
  • Maintenance considerations

    • Verify cabinet input DC and output distribution harnessing before energizing

    • Confirm fuse ratings and connector seating as part of commissioning checks

    • Match the full part number and revision level to avoid compatibility issues with the Mark V rack wiring

Industrial Applications

  • Mark V turbine control cabinets requiring conversion of 125 VDC station power to internal regulated rails

  • Replacement of aging power supply PCBs to restore stable controller and I/O operation

  • Support of servo/actuator interface power and sensor-related excitation circuits in turbine control systems

  • Life-extension programs for installed-base Speedtronic Mark V control infrastructure

 

 

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Industrial AI Scaling Depends on OT Data Readiness
Sep 03, 2026
MaxWell
Industrial AI Scaling Depends on OT Data Readiness
Industrial companies have invested heavily in automation, control systems, historians, manufacturing software and enterprise platforms...
Read More
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Sep 03, 2026
Shopify API
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Few engineering achievements capture the imagination quite like Shell Prelude. Moored approximately 475 kilometers off...
Read More
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
Sep 03, 2026
Shopify API
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
In the high-stakes world of offshore and onshore gas production, few projects carry the geopolitical...
Read More
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
Sep 03, 2026
Shopify API
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
The industrial automation landscape is shifting rapidly as manufacturers demand greater flexibility from their control...
Read More
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Sep 03, 2026
MaxWell
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Critical Manufacturing is preparing to demonstrate how manufacturers can use MES, industrial connectivity, manufacturing analytics and...
Read More
Automation Can Create a Hidden Single-Point-of-Failure Risk
Sep 03, 2026
MaxWell
Automation Can Create a Hidden Single-Point-of-Failure Risk
As factories become more automated, the biggest operational risk may not always be a failed...
Read More
Water Utilities Face Growing Cybersecurity Pressure as OT Risks Rise
Sep 02, 2026
MaxWell
Water Utilities Face Growing Cybersecurity Pressure as OT Risks Rise
The cybersecurity of water and wastewater infrastructure is drawing renewed attention across the industrial automation...
Read More
Manufacturers Reconsider Automation as the Focus Shifts From More Technology to Better Technology
Sep 02, 2026
MaxWell
Manufacturers Reconsider Automation as the Focus Shifts From More Technology to Better Technology
Manufacturers have spent years treating automation as a straightforward answer to labor shortages, rising costs...
Read More
Renesas Opens Beijing Lab to Drive Physical AI and Robotics Innovation
Sep 02, 2026
MaxWell
Renesas Opens Beijing Lab to Drive Physical AI and Robotics Innovation
Renesas Electronics has officially opened its Physical AI & Robotics Lab in Beijing, marking another significant...
Read More
OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
Sep 01, 2026
MaxWell
OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
OMRON Robotics is showcasing its latest mobile industrial automation advancements at Automate 2026 in Chicago,...
Read More