51202330-200 RAM Battery Charge Cable Honeywell Series 8 DCS
51202330-200 RAM Battery Charge Cable Honeywell Series 8 DCS
51202330-200 RAM Battery Charge Cable Honeywell Series 8 DCS
Honeywell

51202330-200 RAM Battery Charge Cable Honeywell Series 8 DCS

SKU: 51202330-200
Categories : All Products
In Stock
  • Dimensions: 26cm x 7cm x 2cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen

Request a quote

1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Honeywell 51202330-200 is a specialized RAM battery charging cable designed for the Series 8 Distributed Control System (DCS) hardware family. This critical interconnect serves a vital role in system reliability by ensuring that the volatile memory (RAM) of the controller retains its configuration and application logic during power interruptions. By facilitating a stable charge path for the backup battery system, the 51202330-200 prevents data loss and ensures that the Series 8 controller can perform a warm start without needing a full program reload from the server. Its precision-molded connectors and high-grade conductive materials are specifically optimized for the low-current, high-stability requirements of industrial processor memory modules.

Hardware Specifications and Functional Parameters

  • Component Designation Battery RAM Charge Interconnect

  • Model Identifier 51202330-200

  • System Compatibility Honeywell Series 8 DCS / C300 Environments

  • Functionality Memory backup power maintenance and charging

  • Connector Integrity Gold-plated or high-conductivity contact surfaces

  • Insulation Class Industrial-grade thermal and chemical resistance

  • Installation Type Internal controller-to-battery assembly link

  • Net Weight 0.06kg

  • Physical Proportions 26cm x 7cm x 2cm

  • Manufacturing Origin USA

  • Tariff Code (HS) 8537101190

Industrial Deployment and Site Applications

The 51202330-200 is a standard requirement for mission-critical automation infrastructures in the petrochemical, power generation, and pharmaceutical sectors. In these environments, unplanned downtime due to memory corruption is a significant risk; this 0.06kg cable ensures that the Series 8 hardware maintains its "last known good" state even during cabinet-level power cycling or maintenance. Its slim profile and 26cm length are perfectly sized for the tight internal routing found in modern Series 8 I/O and controller cabinets. Maintenance engineers specify the 51202330-200 during periodic battery replacement cycles to ensure the physical link between the charger and the RAM module remains robust, as aging cables can develop high resistance that prevents proper backup charging. By following Honeywell's precision engineering standards, this cable minimizes the risk of cold-boot failures and ensures continuous operational longevity for the entire control network.

FAQ

Q: What is the primary purpose of the 51202330-200 cable?

A: It provides the electrical path required to charge the RAM backup battery and maintain memory power when the main system voltage is lost, preventing the controller from losing its programming.

Q: Is this cable compatible with legacy Series A or Series C hardware?

A: The 51202330-200 is specifically keyed and designed for the Series 8 hardware family. You should verify the part number against your legacy hardware documentation as connector types vary between Honeywell system generations.

Q: How do I know if the battery charge cable needs replacement?

A: If your DCS reports "Battery Low" or "RAM Backup Fault" despite a new battery being installed, it may indicate that the 51202330-200 has developed a fault or oxidized contacts that are preventing a full charge from reaching the module.

Q: Does the 0.06kg mass include the battery itself?

A: No, the 0.06kg weight applies only to the specialized cable assembly. The backup battery is a separate component that connects to this cable within the Series 8 controller assembly.

Q: Can this cable be used for standard Ethernet or data communication?

A: No, this is a dedicated power and charging link for internal memory support. It is not designed for data transmission or network communication protocols.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB and Mettler Toledo Partner to Drive Robotic Automation in Laboratory Environments
Jun 05, 2026
MaxWell
ABB and Mettler Toledo Partner to Drive Robotic Automation in Laboratory Environments
Industrial technology leaderABBRobotics has signed a memorandum of understanding with Mettler Toledo to bridge collaborative...
Read More
Emerson Launches PACSystems IPC 2010 to Bridge Shop Floor Data with Cloud Networks
Jun 05, 2026
MaxWell
Emerson Launches PACSystems IPC 2010 to Bridge Shop Floor Data with Cloud Networks
Global engineering technology leaderEmersonhas introduced its PACSystems IPC 2010, a compact and rugged industrial computer...
Read More
KUKA Partners with Micropsi to Integrate MIRAI AI Vision Systems into Industrial Robotics
Jun 05, 2026
MaxWell
KUKA Partners with Micropsi to Integrate MIRAI AI Vision Systems into Industrial Robotics
Industrial robotics manufacturer KUKA has formed a strategic partnership with Micropsi Industries to offer the...
Read More
Banner Engineering Launches DXM1200 Industrial Wireless Gateways for Severe Environments
Jun 05, 2026
MaxWell
Banner Engineering Launches DXM1200 Industrial Wireless Gateways for Severe Environments
Industrial automation instrumentation manufacturer Banner Engineering has released its DXM1200-B2 and DXM1200-X2 wireless controller series,...
Read More
Idec Launches FT2J Series Combined 7-Inch HMI and Programmable Controller
Jun 05, 2026
MaxWell
Idec Launches FT2J Series Combined 7-Inch HMI and Programmable Controller
Global automation components manufacturer Idec has expanded its SmartAXIS Touch hardware family with the introduction...
Read More
Rockwell Automation Introduces Rugged ASEM 6300 Industrial PCs for FactoryTalk Optix Ecosystem
Jun 05, 2026
MaxWell
Rockwell Automation Introduces Rugged ASEM 6300 Industrial PCs for FactoryTalk Optix Ecosystem
Industrial automation leaderRockwell Automationhas expanded its visualization hardware portfolio with the launch of the ASEM...
Read More
Fanuc Invests $110M in Massive Michigan West Campus to Boost Robotics Logistics
Jun 04, 2026
MaxWell
Fanuc Invests $110M in Massive Michigan West Campus to Boost Robotics Logistics
Industrial automation giantFanuchas officially opened a new 650,000-square-foot West Campus facility in Auburn Hills, Michigan,...
Read More
Rockwell Automation Expands Armor Lineup to Accelerate On-Machine System Design
Jun 04, 2026
MaxWell
Rockwell Automation Expands Armor Lineup to Accelerate On-Machine System Design
To minimize panel footprints and accelerate deployment timelines for machine builders,Rockwell Automationhas expanded its ruggedized...
Read More
Schneider Electric Unveils Next-Gen IT/OT Integration Portfolio at SPS
Jun 04, 2026
MaxWell
Schneider Electric Unveils Next-Gen IT/OT Integration Portfolio at SPS
Global energy management and automation specialistSchneider Electrichas unveiled an expansive suite of industrial technology designed...
Read More
Schneider Electric Unveils Unified Ecosystem Strategy for Seamless Industrial IT-OT Convergence
Jun 04, 2026
MaxWell
Schneider Electric Unveils Unified Ecosystem Strategy for Seamless Industrial IT-OT Convergence
Schneider Electric presented a comprehensive showcase of its next-generation smart manufacturing portfolio, demonstrating how a...
Read More