S8JX-G10024CD Omron Switch Mode Power Supply S8JX Series
S8JX-G10024CD Omron Switch Mode Power Supply S8JX Series
Omron

S8JX-G10024CD Omron Switch Mode Power Supply S8JX Series

SKU: S8JX-G10024CD
Categories : All Products
In Stock
  • Dimensions: 30 x 15 x 10 cm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Omron S8JX-G10024CD, also cataloged as the S8JX-G10024C Switch Mode Power Supply, operates as a dedicated hardware component for AC-to-DC power conversion and regulated 24 VDC voltage distribution within control cabinet backplanes.

Model Suffix Structure & Nomenclature

  • S8JX-G: Standard switch mode power supply unit platform
  • 100: 100 W rated power output capacity
  • 24: 24 VDC regulated output voltage rating
  • C: Covered frame physical construction with protective metallic outer shell
  • D: Integrated DIN-rail mounting bracket configuration

Technical Hardware Specifications

Parameter Specification
Model S8JX-G10024CD
Brand Omron
Origin Japan
Weight 0.25 kg
Shipping Dimensions 30 x 15 x 10 cm
Operating Temp -10 deg C to 60 deg C
Power Consumption 100 W output capacity
Input Voltage 100 to 240 VAC (50/60 Hz) / 80 to 370 VDC
Output Voltage 24 VDC
Output Current 4.5 A
Construction Covered structure
Mounting Type DIN-rail mounting

Controller Interfacing & System Performance

The power supply unit delivers noise-filtered DC power across local rack assemblies and connected I/O density scaling racks. Stable output regulation prevents execution dropouts during transient loading on PLC backplanes. High firmware flash compatibility across downstream system nodes ensures uninterrupted EtherCAT and EtherNet/IP communication loops while preserving backplane bus communication velocity Licences.

Package Component List

  • 1 x S8JX-G10024CD Switch Mode Power Supply Assembly
  • 1 x Terminal Cover Plate
  • 1 x Safety Precaution & Installation Leaflet

Wiring Directives & Physical Mounting

Panel Attachment Protocol

  • Snap the integral rear bracket onto a standard 35 mm DIN rail until the locking spring clip engages securely.
  • Provide a minimum of 20 mm clearance above and below the metal housing to permit natural convective airflow.

Electrical Wiring Rules

  • Wire the AC supply lines to the labeled L and N screw terminals using crimped spade or ring terminals.
  • Connect the FG (Frame Ground) terminal directly to the central panel earth ground bar using a heavy gauge conductor.

Frequently Asked Questions

  • What is the nominal output voltage and current rating?

    The unit provides a regulated 24 VDC output at a maximum continuous load current of 4.5 A (100 W capacity).

  • What input voltage ranges are supported by the power supply?

    It accepts AC input voltages from 100 to 240 VAC (50/60 Hz) or DC input voltages from 80 to 370 VDC.

  • Does the unit include built-in mounting hardware for standard rails?

    Yes, the suffix D designation indicates an integrated DIN-rail mounting bracket factory installed on the rear.

  • How is the physical housing constructed on this specific model?

    The suffix C designation denotes a covered structure with a protective perforated metal outer enclosure.

  • What terminal type is used for field power connections?

    External wiring connects directly to front-accessible barrier screw terminals rated for panel wiring.

  • Is parallel operation supported to increase output current capability?

    Standard S8JX power supply units do not support direct parallel operation for current sharing applications.

  • What thermal clearance is required during cabinet installation?

    Maintain at least 20 mm top and bottom air gaps to prevent internal thermal buildup during high-load operations.

  • Must power be removed before servicing terminal connections?

    All AC main inputs and DC outputs must be completely de-energized before touching terminal block screws.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Logistics and Automation Madrid 2026 Opens with 420 Exhibitors and 12,200 Visitors
Nov 21, 2026
Maxwell
Logistics and Automation Madrid 2026 Opens with 420 Exhibitors and 12,200 Visitors
The Logistics & Automation Madrid 2026 exhibition opened on November 11 at IFEMA Madrid, bringing...
Read More
SpaceX Starship Booster 22 Moved to Launch Pad for 15th Test Flight with Full Rocket Recovery Attempt
Nov 21, 2026
Maxwell
SpaceX Starship Booster 22 Moved to Launch Pad for 15th Test Flight with Full Rocket Recovery Att...
SpaceX has moved Super Heavy Booster 22 to the launch pad at Starbase, Texas, in...
Read More
North American Robot Orders Surge 24.8 Percent in Q3 2026 Led by Automotive and Semiconductor
Nov 20, 2026
Maxwell
North American Robot Orders Surge 24.8 Percent in Q3 2026 Led by Automotive and Semiconductor
North American robot orders increased 24.8 percent in the third quarter of 2026 compared to...
Read More
Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Nov 20, 2026
Maxwell
Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Hyundai Motor Group and Air Liquide have signed a memorandum of understanding to collaborate on...
Read More
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Nov 20, 2026
Maxwell
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Torus Energy Storage has been named Battery Manufacturer of the Year at the 2026 Battery...
Read More
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Nov 19, 2026
Maxwell
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Schneider Electric has announced a strategic collaboration with NVIDIA and Hewlett Packard Enterprise to accelerate...
Read More
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
Nov 19, 2026
Maxwell
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
SpaceX has placed an order with German equipment manufacturer SINGULUS Technologies for a heterojunction (HJT)...
Read More
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Nov 19, 2026
Maxwell
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Rockwell Automation has unveiled PanelView Pro, a next-generation high-performance human-machine interface designed to meet the...
Read More
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
Nov 18, 2026
Maxwell
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
A milestone in the American energy transition is approaching, and it is happening in the...
Read More
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Nov 18, 2026
Maxwell
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Humanoid robots have crossed a threshold from laboratory curiosity to production floor reality in the...
Read More