NS8-TV00-ECV2 Omron Programmable Terminal NS Series
Omron

NS8-TV00-ECV2 Omron Programmable Terminal NS Series

SKU: NS8-TV00-ECV2
Categories : All Products
In Stock
  • Dimensions: 23.2 cm x 17.7 cm x 4.8 cm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Omron NS8-TV00-ECV2 serves as the primary NS8-TV00 Programmable Terminal utilized to execute dynamic system status visualization and operator command entry across SYSMAC PLC platforms.

Variant Decoder and Hardware Matrix

  • NS8: Identifies the 8.4 inch active matrix display chassis.
  • T: Designates Color TFT LCD screen architecture.
  • V: Specifies VGA display resolution (640 x 480 pixels).
  • 00: Denotes standard dual RS-232C serial communication interface mapping.
  • ECV2: Indicates conformal coating protection and Version 2 firmware enhancement revision.

Mechanical and Electrical Parameters

Parameter Specification
Model NS8-TV00-ECV2
Brand Omron
Origin Japan
Weight 3.0 kg
Shipping Dimensions 23.2 cm x 17.7 cm x 4.8 cm
Display Type Color TFT LCD
Screen Size 8.4 in
Resolution 640 x 480 dots
Number of Colors 256 colors
Power Consumption 25 W max at 24 VDC
Operating Temp 0 to 50 deg C

Network Determinism and Firmware Interface

The hardware features internal execution memory to preserve backplane bus communication velocity and ensure zero frame collision during cyclic polling. Full firmware flash compatibility prevents logic processing delays when handling high I/O density scaling or transmitting complex fault diagnostics over serial communication links.

Kit Components and Order Details

  • 1 x NS8-TV00-ECV2 Programmable Terminal Assembly
  • 6 x Flush-mount panel retaining clamps
  • 1 x Removable 24 VDC power terminal block
  • 1 x Pre-installed oil-resistant front sealing gasket

Cabinet Installation and Wiring Protocol

  • Cut the panel enclosure opening strictly to 221 mm width by 166 mm height.
  • Inspect the waterproof rubber gasket along the bezel frame to verify uniform seating before panel insertion.
  • Secure the panel brackets, torquing mounting screws evenly to 0.5 N m to ensure IP65 front face integrity.
  • Ground the FG terminal directly to a dedicated Class D earth ground (under 100 ohms) using AWG 14 conductor wire.
  • Maintain a minimum surrounding air gap clearance of 100 mm to facilitate unhindered natural convection cooling.

System Diagnostics FAQ

  • Q: How does conformal coating affect the hardware operational threshold?

    A: Conformal coating shields internal printed circuit boards from moisture and airborne contamination without altering electrical or thermal operating limits.

  • Q: What input power protection is integrated into the 24 VDC line?

    A: The internal power stage contains reverse polarity protection and a non-replaceable surge suppression fuse rated for short-circuit isolation.

  • Q: Can the backlight module be replaced in field applications?

    A: Backlight replacement requires disassembling the rear enclosure; service must be executed in an ESD-safe workspace following factory procedures.

  • Q: What cable specifications apply to long-distance serial links?

    A: Use double-shielded twisted-pair cable for RS-232C connections and enforce a strict maximum distance limit of 15 m to maintain signal integrity.

  • Q: How are alarm log records retained during power interruptions?

    A: Historical alarm logs and system event records are preserved in internal battery-backed SRAM for up to five years under ambient temperatures.

  • Q: Does the unit support project file loading via Memory Card?

    A: Project data can be updated directly using a compatible CompactFlash card inserted into the dedicated rear memory card socket.

  • Q: What configuration software is required for screen editing?

    A: Project screens and memory allocations are created and uploaded using Omron CX-Designer software environments.

  • Q: How is the touch screen calibrated if response drift occurs?

    A: Calibration mode is accessed via the system maintenance menu by holding two opposite display corners during initial unit initialization.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


PDF Datasheet Official Technical Specifications

NS8-TV00-ECV2 Omron Programmable Terminal NS Series

You may also like

From our blog

Latest News and Insights

Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Nov 19, 2026
Maxwell
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Schneider Electric has announced a strategic collaboration with NVIDIA and Hewlett Packard Enterprise to accelerate...
Read More
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
Nov 19, 2026
Maxwell
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
SpaceX has placed an order with German equipment manufacturer SINGULUS Technologies for a heterojunction (HJT)...
Read More
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Nov 19, 2026
Maxwell
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Rockwell Automation has unveiled PanelView Pro, a next-generation high-performance human-machine interface designed to meet the...
Read More
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
Nov 18, 2026
Maxwell
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
A milestone in the American energy transition is approaching, and it is happening in the...
Read More
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Nov 18, 2026
Maxwell
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Humanoid robots have crossed a threshold from laboratory curiosity to production floor reality in the...
Read More
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
Nov 18, 2026
Maxwell
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
The global industrial automation sector is witnessing a dramatic reshuffling of strategic alliances as SoftBank...
Read More
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
Nov 17, 2026
Maxwell
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
The global electric vehicle battery landscape has undergone a decisive shift. According to data released...
Read More
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Nov 17, 2026
Maxwell
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Honeywell has entered a new chapter. At the ninth China International Import Expo (CIIE), held...
Read More
Siemens Signs Strategic Partnership with Nanjing for Smart Manufacturing Under 15th Five-Year Plan
Nov 17, 2026
Maxwell
Siemens Signs Strategic Partnership with Nanjing for Smart Manufacturing Under 15th Five-Year Plan
Siemens is deepening its roots in one of China's most important manufacturing hubs. On November...
Read More
Apple Unveils HALO Humanoid Robot Autonomous Control System with 91% Task Success Rate
Nov 16, 2026
Maxwell
Apple Unveils HALO Humanoid Robot Autonomous Control System with 91% Task Success Rate
Apple has entered the humanoid robotics race, albeit in characteristically understated fashion. On November 4,...
Read More