NS5-MQ10B-V2 Omron Programmable Terminal NS Series
Omron

NS5-MQ10B-V2 Omron Programmable Terminal NS Series

SKU: NS5-MQ10B-V2
Categories : All Products
In Stock
  • Dimensions: 195 mm x 142 mm x 54 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for monochrome process visualization and direct memory-mapped register monitoring in serial controller networks, the Omron NS5-MQ10B-V2 (NS5-MQ10 Programmable Terminal) provides direct physical/electrical execution.

Model Designation Scheme

  • NS5: Indicates 5.7-inch display chassis class within the human-machine interface platform.
  • MQ: Specifies STN monochrome LCD display panel architecture.
  • 10: Designates 320 x 240 dot resolution matrix (QVGA specification).
  • B: Denotes black outer bezel housing color.
  • V2: Identifies System Version 2 hardware revision with expanded memory allocation.

Physical and Performance Specifications

Parameter Specification
Model NS5-MQ10B-V2
Brand Omron
Origin Japan
Weight 1.0 kg
Shipping Dimensions 195 mm x 142 mm x 54 mm
Operating Temp 0 to 50 deg C
Display Technology 5.7-inch STN Monochrome LCD
Resolution 320 x 240 dots
Case Color Black
Ethernet Interface Not supported
Power Consumption 15 W max.
Compliance Standards UC1, CE, N, L, UL Type 4

PLC Interface and System Firmware Integrity

Communications over serial controller links maintain deterministic register mapping to manage high I/O density scaling across host memory banks. Firmware flash compatibility prevents OS boot sector corruption during sudden plant power loss. Backplane communication drivers process coordinate inputs and screen updates without introducing cycle latency to connected PLC loops.

Package Component List

  • 1 x Omron NS5-MQ10B-V2 Programmable Terminal
  • 1 x Removable Power Terminal Connector
  • 4 x Panel Mounting Brackets with Screws
  • 1 x Rear Water-Resistant Sealing Gasket

Field Mounting and Grounding Standards

Panel Cutout Preparation

Cut a precise rectangular opening in the control cabinet door per dimensional specifications. Leave a minimum 100 mm clear perimeter around rear cooling vents to enable natural air convection.

Mechanical Securing Procedure

Verify the perimeter rubber gasket is aligned in the front bezel channel. Insert the terminal into the panel cutout and tighten all four clamps diagonally to ensure UL Type 4 front ingress sealing.

DC Wiring and Noise Suppression

Route a regulated 24 VDC power feed using 16 AWG copper wire. Connect the Functional Ground (FG) terminal directly to the enclosure earth bar with a short, low-impedance conductor to mitigate noise.

Technical FAQ

  • Can the main 24 VDC terminal connector be removed while the system is powered?

    Removing the power connector while active stops operation immediately and risks corrupting unwritten SRAM memory registers and internal event logs.

  • What causes touch grid misalignment or unregistered screen inputs?

    Induced electrical noise on the DC power lines or an floating FG connection affects capacitive touch sense circuits. Verify clean power and solid grounding.

  • How does lack of onboard Ethernet impact network integration options?

    Without Ethernet, communications rely on RS-232C or RS-422A/485 serial ports using host link or 1:N NT Link protocols to connect to controller nodes.

  • What mounting orientation is required to ensure adequate thermal management?

    Mount the unit vertically within 30 deg of perpendicular to permit proper upward convection airflow through top and bottom rear casing slots.

  • What precautions must be taken during system firmware transfers?

    Provide stable, continuous 24 VDC power throughout firmware transmission. Power loss while flashing overwrites boot sectors and disables system startup.

  • How are serial communication timeouts indicated during network traffic spikes?

    Timeouts trigger visual status flags on screen. Retry attempt limits and response wait times are configurable via the system setup interface.

  • What type of line protection is recommended for the main power input?

    Install a fast-acting 2 A inline fuse on the positive +24 VDC line to protect internal power transformation components against overcurrent surges.

  • How does the internal lithium battery protect runtime logs during power loss?

    The internal 5-year lithium battery preserves real-time clock timing and non-volatile SRAM alarm data when external DC input power is removed.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


PDF Datasheet Official Technical Specifications

NS5-MQ10B-V2 Omron Programmable Terminal NS Series

You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More