IEPDP01 ABB Power Distribution Panel Infi 90 System
IEPDP01 ABB Power Distribution Panel Infi 90 System
IEPDP01 ABB Power Distribution Panel Infi 90 System
ABB

IEPDP01 ABB Power Distribution Panel Infi 90 System

SKU: IEPDP01
Categories : ABB
In Stock
  • Dimensions: 48.3 x 10.2 x 7.6 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB IEPDP01, also cataloged as the IEPDP01 Power Distribution Panel, operates as a dedicated hardware component for centralized electrical branch routing within Infi 90 platforms. The unit acts as a physical termination layer that segments primary supply feeds into six independent outputs, managing load distribution while providing circuit protection for downstream rack components.

Electrical and Physical Parameters

Parameter Specification
Model IEPDP01
Brand ABB
Origin Sweden
Weight 1.8 kg
Shipping Dimensions 48.3 x 10.2 x 7.6 cm
Operating Temp -20 to +60 deg C
Power Consumption Passive distribution panel (internal loss determined by circuit load)
Voltage Range 0 - 300 Vac
Current Rating 20 Amps max per terminal block position
Output Quantity 6 outputs
Protection Fusing 5 x 20 mm glass cartridge fuses per branch circuit
Galvanic Isolation 2 kV terminal-to-panel physical insulation rating
Mounting Form Standard 19-inch rack enclosure layout
Relative Humidity 10% to 95% RH, non-condensing envelope
Storage Temperature -40 to +85 deg C

Backplane Bus Communication Velocity and Deterministic Networks

In an integrated DCS layout, the IEPDP01 powers high-density processors and communication modems that rely on steady backplane bus communication velocity configurations. Maintaining continuous voltage paths directly limits thermal instability inside the rack enclosure, which preserves the timing windows needed for deterministic execution across internal lines. Clean load tracking prevents voltage sags that could cause synchronization timeouts or corrupt firmware flash compatibility sequences during automated system updates.

Hardware Interface FAQ

Q: Does the IEPDP01 panel support hot-swap replacement of fuses while the branch circuit is live?

A: Fuse extraction is physically possible using insulated fuse pullers, but removing a cartridge under active load will interrupt current to that specific branch. This action instantly drops power to all devices tied to that output line, which can disrupt real-time control communications.

Q: What are the consequences of exceeding the 20 Amps maximum limit on an individual output terminal?

A: Exceeding 20 Amps on a single terminal path causes excessive thermal stress on the internal busbars and terminal screws. This overload risks degrading the 2 kV terminal-to-panel isolation profile and can lead to premature structural failures or internal short circuits.

Q: How does the 2 kV isolation rating affect standard system grounding layouts?

A: The 2 kV terminal-to-panel isolation provides a high dielectric barrier between the electrical distribution circuits and the structural 19-inch mounting frame. This configuration prevents high-voltage field transients from grounding through the chassis, helping to protect sensitive signal logic layers in the system.

Field Layout and Termination Directives

  • Rack Mounting Stability: Secure the chassis into standard 19-inch rack frames using four matching panel screws, verifying that the metal-to-metal interface provides a low-impedance connection to the enclosure earth grid.

  • Terminal Block Wiring Limits: Strip branch wires according to standard specifications and insert them fully into the terminal plates, tightening the terminal screws to standard industrial torque parameters to prevent loose connections.

  • Fuse Capacity Alignment: Verify that the installed 5 x 20 mm glass cartridge fuses match the explicit overcurrent limits of the downstream load devices. Never bypass or jump a fuse terminal position.

  • Cable Routing Segregation: Route high-voltage AC distribution wires away from low-voltage I/O and communication cables inside the cabinet to prevent capacitive noise coupling and maintain overall signal integrity.

Shipment Packing Parameters

  • Standard Contained Hardware: One ABB IEPDP01 19-inch rack-mount Power Distribution Panel assembly fitted with six active terminal positions.

  • Separated Accessory Requirements: Industrial branch fuses, external supply wiring, terminal boot insulators, and enclosure mounting screws must be ordered as separate lines.

Logistics Profile and Handling Data

  • Consignment Processing Time: Delivery time: 2-7 days when payment finish, routed via prioritized international express courier networks using DHL, FEDEX, or UPS.

  • Anti-Static Industrial Packaging: Dispatched within heavy-duty anti-static industrial packaging and protected by internal foam end-caps to prevent chassis deformation or damage to terminal ceramic components during global transit.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Nov 20, 2026
Maxwell
Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Hyundai Motor Group and Air Liquide have signed a memorandum of understanding to collaborate on...
Read More
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Nov 20, 2026
Maxwell
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Torus Energy Storage has been named Battery Manufacturer of the Year at the 2026 Battery...
Read More
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Nov 19, 2026
Maxwell
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Schneider Electric has announced a strategic collaboration with NVIDIA and Hewlett Packard Enterprise to accelerate...
Read More
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
Nov 19, 2026
Maxwell
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
SpaceX has placed an order with German equipment manufacturer SINGULUS Technologies for a heterojunction (HJT)...
Read More
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Nov 19, 2026
Maxwell
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Rockwell Automation has unveiled PanelView Pro, a next-generation high-performance human-machine interface designed to meet the...
Read More
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
Nov 18, 2026
Maxwell
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
A milestone in the American energy transition is approaching, and it is happening in the...
Read More
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Nov 18, 2026
Maxwell
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Humanoid robots have crossed a threshold from laboratory curiosity to production floor reality in the...
Read More
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
Nov 18, 2026
Maxwell
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
The global industrial automation sector is witnessing a dramatic reshuffling of strategic alliances as SoftBank...
Read More
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
Nov 17, 2026
Maxwell
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
The global electric vehicle battery landscape has undergone a decisive shift. According to data released...
Read More
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Nov 17, 2026
Maxwell
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Honeywell has entered a new chapter. At the ninth China International Import Expo (CIIE), held...
Read More