Allen-Bradley PowerFlex 20F11FC104JA0NNNNN AC frequency converter
Allen-Bradley PowerFlex 20F11FC104JA0NNNNN AC frequency converter
Allen-Bradley PowerFlex 20F11FC104JA0NNNNN AC frequency converter
Allen-Bradley

Allen-Bradley PowerFlex 20F11FC104JA0NNNNN AC frequency converter

SKU: 20F11FC104JA0NNNNN
Categories : All Products
In Stock
  • Dimensions: 21 x 59.5 x 17 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley 20F11FC104JA0NNNNN, also cataloged as the PowerFlex 753 AC frequency converter, operates as a dedicated hardware component for variable frequency motor speed and torque control within EtherNet/IP deterministic networks.

Built-in Hardware Matrix Statement

This asset constitutes a single integrated power conversion module specified under catalog identifier 20F11FC104JA0NNNNN. Based on engineering directives for this hardware category, the full alphanumeric model string represents a fixed factory assembly configuration containing definite parameters for filtration, mechanical cooling layout, frame dimensions, and internal braking electronics that must be operated as a non-divisible technical unit.

Hardware Parameter Table

Parameter Specification
Model 20F11FC104JA0NNNNN
Brand Allen-Bradley
Origin USA
Weight 8 kg
Shipping Dimensions 21 x 59.5 x 17 cm
Operating Temp 0 to 50 deg C
Power Consumption 55 kW ND / 45 kW HD
Voltage Class 400 V AC, 3 Phase / 540 V DC
Output Current 104 Amps
Enclosure Type Flange (NEMA/UL Type 4X/12 Back), Front Open
Frame Size Frame 5
Jumper Connection Default CM Jumper Installed
Cooling Layout Forced Air

Deterministic Network Integration

The internal processing architecture is designed to sustain continuous communication synchronization over EtherNet/IP deterministic networks. The drive firmware supports active parameter mapping to control registers without degrading backplane bus communication velocity licenses. This ensures high-speed I/O density scaling when exchanging torque, velocity, and diagnostic words with Logix-based automation controllers while adhering to established firmware flash compatibility matrices.

Delivery Components

  • 1 Allen-Bradley 20F11FC104JA0NNNNN AC Drive

  • 1 Flange Mounting Gasket Kit

  • 1 Factory Installed CM Jumper Reference Sheet

Mechanical Mounting and Wiring Guidelines

Flange Installation

  • Secure the Frame 5 chassis into the enclosure cutout, ensuring the NEMA/UL Type 4X/12 rear heatsink extends outside the cabinet.

  • Tighten all flange mounting bolts evenly to compress the rear seal gasket and prevent ambient ingress.

Power Termination

  • Connect incoming 400 V AC lines or matching 540 V DC bus terminals using distinct routed paths separated from low-voltage I/O lines.

  • Ground the device directly from the internal protective ground lug to the enclosure common ground plane using low-impedance conductors.

Technical Engineering FAQ

  • What is the safe temperature threshold for standard operation?

    The drive functions within nominal parameters across an environmental ambient range of 0 to 50 deg C.

  • Is hot-swapping option cards permitted while the system is powered?

    No, hot-swap operations are fully unsupported; all main input voltages and auxiliary control power must be isolated first.

  • What are the specific power capacities under different load conditions?

    The unit outputs 104 Amps, corresponding to 55 kW Normal Duty or 45 kW HD operation.

  • What integrated braking components are built into this module?

    An internal dynamic braking (DB) transistor is factory-installed, but external dynamic resistors must be added separately.

  • What type of human interface option is integrated into the front chassis?

    This configuration features a HIM Blank cover plate, meaning no integrated Human Interface Module is present.

  • What physical constraints apply to installation spaces and freight calculation?

    The drive weighs 8 kg and requires a physical outline volume of 21 x 59.5 x 17 cm.

  • What input circuit design is utilized for the primary power stage?

    The power circuitry features an AC & DC input line structure complete with precharge components and DC terminals.

  • What is the default condition of the internal common mode capacitor configuration?

    The drive is delivered with the internal CM jumper fully installed, matching grounded power system layouts.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Saudi Arabia NEOM 2.2GW Green Hydrogen Project Enters Commissioning Phase Ahead of 2027 Launch
Oct 28, 2026
Maxwell
Saudi Arabia NEOM 2.2GW Green Hydrogen Project Enters Commissioning Phase Ahead of 2027 Launch
Saudi Arabia's landmark NEOM green hydrogen project has entered the commissioning phase following completion of...
Read More
ASML Raises Spare Part Prices 10 Percent for Samsung and SK Hynix in Unprecedented Move
Oct 28, 2026
Maxwell
ASML Raises Spare Part Prices 10 Percent for Samsung and SK Hynix in Unprecedented Move
ASML Holding, the Dutch semiconductor equipment manufacturer that holds a near-monopoly on extreme ultraviolet lithography...
Read More
European Offshore Wind Supply Chain Squeeze as Monopile Factories Run at 19 Percent Capacity
Oct 28, 2026
Maxwell
European Offshore Wind Supply Chain Squeeze as Monopile Factories Run at 19 Percent Capacity
Europe's offshore wind industry faces a growing supply chain crisis as monopile manufacturing facilities across...
Read More
SpaceX Wins FCC Approval for 15000 Additional Starlink Satellites with Direct-to-Phone Capability
Oct 27, 2026
Maxwell
SpaceX Wins FCC Approval for 15000 Additional Starlink Satellites with Direct-to-Phone Capability
SpaceX has secured Federal Communications Commission approval to operate 15,000 additional Starlink satellites, dramatically expanding...
Read More
Ballard Power Secures 4.8MW Fuel Cell Order from Siemens Mobility for Romanian Hydrogen Trains
Oct 27, 2026
Maxwell
Ballard Power Secures 4.8MW Fuel Cell Order from Siemens Mobility for Romanian Hydrogen Trains
Ballard Power Systems has secured a landmark 4.8 megawatt order from Siemens Mobility to supply...
Read More
Siemens Consolidates All Automation Divisions into Single Business Unit Effective October 2026
Oct 27, 2026
Maxwell
Siemens Consolidates All Automation Divisions into Single Business Unit Effective October 2026
Siemens has executed one of the most significant organizational transformations in its industrial automation history,...
Read More
Rockwell Automation Expands SecureOT Managed Services to Support Fortinet Firewalls
Oct 26, 2026
Maxwell
Rockwell Automation Expands SecureOT Managed Services to Support Fortinet Firewalls
Rockwell Automation has significantly expanded its managed security services portfolio with the introduction of SecureOT...
Read More
Blue Origin to Build Satellite Manufacturing Campus in Texas with 1.3 Million Square Feet
Oct 26, 2026
Maxwell
Blue Origin to Build Satellite Manufacturing Campus in Texas with 1.3 Million Square Feet
Blue Origin has announced plans to construct a major satellite manufacturing campus in Hart, Texas,...
Read More
CALB Xinyang 9.63 Billion Yuan Battery Base Starts Production with 51GWh Capacity
Oct 26, 2026
Maxwell
CALB Xinyang 9.63 Billion Yuan Battery Base Starts Production with 51GWh Capacity
CALB (China Aviation Lithium Battery) has commenced production at its major power and energy storage...
Read More
Expand Energy Selects Thoughtworks to Scale AI Across Oil and Gas Operations
Oct 26, 2026
Maxwell
Expand Energy Selects Thoughtworks to Scale AI Across Oil and Gas Operations
Expand Energy, the largest independent natural gas producer in the United States, has selected global...
Read More