ABB 3BSE013281R1 TC514V2 REPEATER MODULE TWISTED PAIR/OPTICAL AF100 Advant Master
ABB 3BSE013281R1 TC514V2 REPEATER MODULE TWISTED PAIR/OPTICAL AF100 Advant Master
ABB 3BSE013281R1 TC514V2 REPEATER MODULE TWISTED PAIR/OPTICAL AF100 Advant Master
ABB

ABB 3BSE013281R1 TC514V2 REPEATER MODULE TWISTED PAIR/OPTICAL AF100 Advant Master

SKU: 3BSE013281R1
Categories : ABB
In Stock
  • Dimensions: 17 x 5.7 x 12 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for optical-to-electrical signal conversion in Advant Fieldbus 100 networks, the ABB 3BSE013281R1 (TC514V2 Repeater Module) provides direct physical/electrical execution. The module enables bi-directional signal transmission between physical twisted pair copper media and fiber optic cables without introducing protocol-level propagation overhead. It maintains complete physical layer transparency, extending the transmission distance and topology limits of standard industrial network segments while ensuring galvanic isolation between distinct network nodes.

Device Parameters and Specifications

Parameter Specification
Model TC514V2
Spare Model 3BSE013281R1
Brand ABB
Origin Sweden
Network Type Advant Fieldbus 100 (AF100)
Interface Type A Twisted Pair Copper
Interface Type B Optical / Fiber Optic
Weight 0.32 kg
Shipping Dimensions 17 x 5.7 x 12 cm
Operating Temp 0 to +55 deg C
Storage Temp -40 to +70 deg C
Power Consumption Max 200 mA at 24 VDC
Relative Humidity 5% to 95% non-condensing
Tariff Code 8517620050

Deterministic Network Backplane & Firmware Synchronization

As an integral component within the Advant Master DCS topology, the module interfaces with the underlying backplane bus communication velocity configurations. The hardware contains internal timing registers mapped to synchronize with the deterministic transmission cycles of the AF100 network. Field-level configuration parameters are held within fixed firmware flash blocks, ensuring that media conversion jitter does not disrupt the time-stamped communication packets required by Advant Controllers. This hardware-level execution suppresses propagation drift, rendering the module transparent to the master controller firmware.

Technical Queries & Diagnostics

Q: Does the module support hot-swap replacement while the AF100 bus is actively communicating?

A: No. Removing or inserting the module during active bus operations can disrupt line impedance characteristics on the twisted pair segment, causing cyclic redundancy check (CRC) errors or brief bus initialization cycles across the remaining nodes. Power down the segment node before replacement.

Q: How is media propagation delay handled when calculating total network cycle time?

A: The physical transceiver circuits introduce a fixed propagation delay that must be accounted for in the AF100 bus configuration utility. When cascading multiple units, the cumulative hardware latency must be factored into the overall station-to-station response times to prevent token-rotation timeouts.

Q: What is the behavior of the optical port if the twisted pair cable loses continuity?

A: The module operates at the physical layer. If a signal loss or line fault is detected on the twisted pair side, the internal transceiver ceases transmission on the optical link, ensuring that downstream repeaters do not process or amplify standard line noise as valid data frames.

On-Site Deployment Requirements

  • Shielding and Grounding: The twisted pair cable shield must be terminated directly to the industrial PE chassis rail via a low-impedance grounding clamp at the entry point of the enclosure. Do not daisy-chain the shield through signal ground pins.

  • Optical Fiber Handling: Ensure that the fiber optic cables do not exceed the minimum bend radius specified by the manufacturer (typically 30 mm for static installation). Clean all optical interfaces with lint-free wipes and pure isopropyl alcohol prior to insertion.

  • Power Distribution: Power supply wiring must be routed separate from high-voltage AC motor leads or switching inductive loads to minimize electromagnetic interference across the internal power filtering stages.

  • Mounting Orientation: Mount the hardware vertically onto standard DIN rails to maximize natural convection cooling across the internal enclosure surface.

Purchasing Specification

  • 1 x ABB TC514V2 3BSE013281R1 Repeater Module

  • Factory Test Certificate and Declaration of Conformity

  • Note: External fiber optic connectors and twisted pair termination blocks must be ordered separately as individual line items.

Logistics & Shipping Profiles

Delivery window spans 2-7 days upon successful completion of the payment verification process. All shipments route via international carriers including DHL, FEDEX, or UPS. Instruments are packaged exclusively inside anti-static industrial packaging enclosures accompanied by high-density polyethylene foam inserts to neutralize static discharge and mechanical shock hazards during transit.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More