6180-FLIFHLHTJEZ Allen-Bradley Industrial Computer VersaView
6180-FLIFHLHTJEZ Allen-Bradley Industrial Computer VersaView
6180-FLIFHLHTJEZ Allen-Bradley Industrial Computer VersaView
Allen-Bradley

6180-FLIFHLHTJEZ Allen-Bradley Industrial Computer VersaView

SKU: 6180-FLIFHLHTJEZ SER B
Categories : All Products
In Stock
  • Dimensions: 35 x 29 x 6 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for high-speed data processing in industrial automation systems, the Allen-Bradley 6180-FLIFHLHTJEZ SER B (6180-FLIFHLHTJEZ Industrial Computer) provides direct physical execution of control logic and human-machine interface applications.

Hardware Identification

The 6180-FLIFHLHTJEZ SER B is a member of the Allen-Bradley VersaView industrial computer series. It is designed to function as a dedicated compute node for control network platforms, offering high resistance to environmental ingress as specified by NEMA type 1, 12, 13, and 4X standards.

Hardware Specifications

Parameter Specification
Model 6180-FLIFHLHTJEZ SER B
Brand Allen-Bradley
Origin USA
Weight 2.64 kg
Shipping Dimensions 35 x 29 x 6 cm
Operating Temp -20 deg C to +55 deg C
Power Consumption 12 A (Max load)
Input Voltage 18 - 32 VDC
NEMA Rating 1, 12, 13, 4X

Control Systems and Deterministic Networking

The unit is engineered to support seamless integration with Prototypical EtherNet/IP deterministic networks, maintaining data synchronization across distributed control systems. Firmware flash compatibility ensures that the operating system and drivers can be updated to accommodate evolving network protocol standards. The architecture supports efficient I/O density scaling, allowing for centralized management of disparate field controllers without degradation of the primary control bus communication velocity.

Ordering Information

  • One (1) 6180-FLIFHLHTJEZ Industrial Computer unit.

  • Mounting hardware and gaskets for NEMA sealing.

  • Digital documentation and standard recovery media.

Installation Guidelines

  • Enclosure Mounting: Ensure the enclosure panel is flat and rigid to maintain the NEMA 4X ingress seal integrity during mounting.

  • Power Wiring: Utilize appropriately gauged cabling for 18-32 VDC input. Ensure common-mode noise suppression by using a dedicated isolated DC power supply.

  • Grounding: Secure the computer chassis to a common machine ground using a low-impedance braided strap to mitigate high-frequency ground loops.

  • Ventilation: Maintain a 5 cm air clearance around all sides of the unit to ensure passive thermal dissipation does not exceed component ratings.

  • Port Protection: Use NEMA-rated covers for any unused communication ports to maintain IP/NEMA ingress protection ratings.

Frequently Asked Questions

  • Is the 6180-FLIFHLHTJEZ capable of hot-swapping?

    No. Disconnect all power and communication cabling before performing hardware maintenance or module replacement.

  • How is the NEMA 4X seal verified?

    The seal is verified by ensuring the provided gasket is correctly seated and the mounting fasteners are torqued evenly across the perimeter.

  • What is the input current requirement during peak operation?

    The unit is rated for 12 A at peak load; ensure the upstream circuit breaker is sized to handle this demand without nuisance tripping.

  • Does the unit support redundant power inputs?

    Consult the specific terminal wiring diagram provided with the unit, as power input capability is model-revision dependent.

  • Can I upgrade the internal system RAM or storage?

    Hardware upgrades must be performed using authorized components to ensure the system maintains its thermal and mechanical specifications.

  • How is the system restored in the event of software failure?

    Use the factory-provided recovery media to re-image the drive; ensure all critical configuration files are backed up externally prior to any re-imaging task.

  • Why is an isolated DC power supply required?

    Isolated power prevents circulating ground currents between the computer and other industrial modules, which can cause erratic data behavior.

  • What happens if the input voltage exceeds 32 VDC?

    Exceeding the 32 VDC limit will trigger the internal over-voltage protection and may result in permanent hardware damage.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More