3HAC040655-002 ABB MU100 Series Motor Unit
ABB

3HAC040655-002 ABB MU100 Series Motor Unit

SKU: 3HAC040655-002
Categories : ABB
In Stock
  • Dimensions: 18.6 cm x 6.1 cm x 6 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB 3HAC040655-002, also cataloged as the MU100 Motor Unit, operates as a dedicated hardware component for precision motion actuation and rotational torque output within ABB IRC5 and OmniCore robotic drive platforms.

Variant Configuration & Catalog Cross-Reference

  • 3HAC040655-002: Specific assembly part number specifying the 1.4 Nm rated graphite white motor drive unit.
  • MU100: Base motor family identifier for compact auxiliary robot axis and positioner motion integration.

Physical & Operational Specifications

Parameter Specification
Model 3HAC040655-002
Brand ABB
Origin Sweden
Weight 1 kg
Shipping Dimensions 18.6 x 6.1 x 6.0 cm
Operating Temp 0 to 45 deg C
Power Consumption Continuous dynamic rating
Rated Torque 1.4 Nm
Enclosure Finish Graphite White
Motor Type Servo Motor Assembly

Motion Bus Integration & Deterministic Control

The motor assembly integrates directly with standard robot drive channels, utilizing dynamic loop feedback loops and optimized internal drive routines to achieve real-time synchronization. High signal velocity communication over internal fieldbus connections maintains absolute feedback loop synchronization with the central drive controller. The internal encoder unit ensures strict firmware flash compatibility across robot controller generations, maximizing overall I/O density scaling and multi-axis interpolation performance.

Package Component Checklist

  • 1 x ABB 3HAC040655-002 Motor Unit MU100 Assembly
  • 1 x Integrated Shaft Key and Connector Protective Cap Set

Mechanical Mounting & Electrical Installation

Mechanical Alignment and Fastening

  • Position the motor housing flush against the mounting flange, ensuring exact alignment of the drive shaft keyway.
  • Torque all flange retention bolts evenly in a cross pattern to prevent housing deformation or shaft misalignment.

Connector Interface and Shielding

  • Connect the power and feedback cables using the integrated heavy-duty quick-lock industrial connectors.
  • Ensure all cable shielding drain wires maintain 360-degree contact with the connector backshell frame ground to prevent signal noise interference.
  • Avoid routing motor feedback lines parallel to high-current AC supply conduits without a minimum 30 cm spatial separation.

Technical Operational FAQs

  • What is the nominal output torque rating of the 3HAC040655-002 motor unit?

    The motor unit delivers a continuous rated torque output of 1.4 Nm for auxiliary mechanical drive axes.

  • Which controller platforms support direct integration with the MU100 unit?

    The motor unit interfaces directly with ABB IRC5 and OmniCore drive system architectures supporting auxiliary motor axes.

  • Can this motor unit be hot-swapped while drive power is applied?

    No. Main system power and drive DC bus voltages must be completely isolated before disconnecting or connecting the unit.

  • How is the motor housing surface protected against environmental exposure?

    The external aluminum housing is coated with a durable industrial graphite white finish to resist oil and chemical exposure.

  • What feedback sensor type is integrated within the assembly?

    The unit incorporates a high-resolution serial feedback encoder to provide real-time absolute position tracking to the drive control unit.

  • What precautions must be taken regarding cable shielding during installation?

    Power and signal cables must use 360-degree braided shielding bonded to chassis ground at the connector shells to eliminate cross-talk.

  • What ambient temperature range is allowable for continuous motor operation?

    The assembly is specified for reliable continuous operation within ambient enclosure temperatures ranging from 0 to 45 deg C.

  • What is the physical shipping weight of the complete unit?

    The motor unit assembly has a net physical weight of 1 kg with standard factory packaging.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Guoxing Intelligent Unveils 11 Special-Purpose Robots for High-Risk Environments
Oct 09, 2026
Maxwell
Guoxing Intelligent Unveils 11 Special-Purpose Robots for High-Risk Environments
[omitted 11396 chars content; preview: China's special-purpose robotics sector received a significant boost on September...
Read More
2026 World Clean Energy Equipment Conference to Be
Oct 09, 2026
Maxwell
2026 World Clean Energy Equipment Conference to Be Held in Deyang Sichuan October 14-16
When the 2026 World Clean Energy Equipment Conference opens its doors in Deyang, Sichuan Province...
Read More
Wind Turbine Tower Safety Monitoring Standard Takes Effect
Oct 08, 2026
Maxwell
Wind Turbine Tower Safety Monitoring Standard Takes Effect
Wind Turbine Tower Safety Monitoring Standard Takes Effect A new national standard for wind turbine...
Read More
Domestic Wind Turbine Installation Robot Achieves Commercial Application
Oct 08, 2026
Maxwell
Domestic Wind Turbine Installation Robot Achieves Commercial Application
Domestic Wind Turbine Installation Robot Achieves Commercial Application A significant milestone in wind energy operations...
Read More
TotalEnergies Partners with Mistral on Oil and Gas AI
Oct 08, 2026
Maxwell
TotalEnergies Partners with Mistral on Oil and Gas AI
TotalEnergies Partners with Mistral on Oil and Gas AI TotalEnergies has announced a strategic three-year...
Read More
XJ Electric Offshore Wind HVDC Patent Granted
Oct 07, 2026
Maxwell
XJ Electric Offshore Wind HVDC Patent Granted
XJ Electric Offshore Wind HVDC Patent Granted XJ Electric Co., Ltd. and XJ Group have...
Read More
Grid-Forming Technology Scales from Demonstration to Commercial Deployment
Oct 07, 2026
Maxwell
Grid-Forming Technology Scales from Demonstration to Commercial Deployment
Grid-Forming Technology Scales from Demonstration to Commercial Deployment The 2026 Grid-Forming Technology and Equipment Innovation...
Read More
2026 World Manufacturing Conference Showcases Smart Manufacturing Achievements
Oct 07, 2026
Maxwell
2026 World Manufacturing Conference Showcases Smart Manufacturing Achievements
2026 World Manufacturing Conference Showcases Smart Manufacturing Achievements The 2026 World Manufacturing Conference concluded in...
Read More
Lingyang Industrial Large Model 3.5 Released with Three AI Agents
Oct 07, 2026
Maxwell
Lingyang Industrial Large Model 3.5 Released with Three AI Agents
Lingyang Industrial Large Model 3.5 Released with Three AI Agents At the 2026 World Manufacturing...
Read More
Gastops and Vestas Renew MetalSCAN Oil Debris Monitoring Agreement
Oct 06, 2026
Maxwell
Gastops and Vestas Renew MetalSCAN Oil Debris Monitoring Agreement
Gearbox failures on wind turbines announce themselves long before they happen — in the metal...
Read More