3500/20-01-00 Bently Nevada Rack Interface Module 3500 System
3500/20-01-00 Bently Nevada Rack Interface Module 3500 System
3500/20-01-00 Bently Nevada Rack Interface Module 3500 System
Bently Nevada

3500/20-01-00 Bently Nevada Rack Interface Module 3500 System

SKU: 3500/20-01-00
Categories : All Products
In Stock
  • Dimensions: 5.1 x 25.3 x 12 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for rack communication management in industrial machinery protection networks, the Bently Nevada 3500/20-01-00 (3500/20-01-00 Rack Interface Module) provides direct physical execution of backplane data routing and serial communication protocols.

Model Suffix Matrix

  • 3500/20: Base model designation for the Rack Interface Module.
  • 01: Standard RIM hardware option configuration.
  • 00: Indicates no built-in modem is installed on the I/O module.

Hardware Specifications

Parameter Specification
Model 3500/20-01-00
Brand Bently Nevada
Origin USA
Weight 0.68 kg
Shipping Dimensions 5.1 x 25.3 x 12 cm
Operating Temp -30 deg C to +65 deg C
Power Consumption 4.75 watts typical

Rotor Dynamics And Diagnostic Processing

  • Data Transmission: Manages serial communications via standard RS232 links operating up to a maximum baud rate of 38.4 k.
  • Status Indicators: Utilizes onboard OK and TX/RX LEDs to provide real-time validation of module health and rack bus communication activity.
  • Backplane Interfacing: Coordinates data exchange between individual monitor modules and external configuration software across the 3500 rack backplane.
  • Signal Validation: Ensures robust data integrity for machinery monitoring systems tracking rotor dynamics and vibration parameters.

Bill Of Delivery

  • 1 x 3500/20-01-00 Rack Interface Module
  • 1 x Associated I/O module without modem

Mechanical Mounting And Cabling Guidelines

  • Rack Slot Placement: Insert the module strictly into the designated primary slot reserved for the Rack Interface Module on the left side of the 3500 rack.
  • Backplane Engagement: Align the module cards carefully with the internal connectors before applying firm, even pressure to secure the unit.
  • Serial Cable Routing: Keep RS232 communication cables segregated from high-voltage power lines to prevent induced electrical noise on the data link.
  • Grounding Compliance: Ensure the rack chassis is securely connected to the facility earth ground to maintain system electrical stability.

Frequently Asked Questions

  • Question: What is the primary operational purpose of the 3500/20-01-00 module?

    Answer: It acts as the central interface for managing rack communications and backplane data routing in the 3500 monitoring system.

  • Question: What type of serial communication does the standard RIM support?

    Answer: It supports standard RS232 serial communications with a maximum data rate of 38.4 k baud.

  • Question: How is operational health indicated on the front panel?

    Answer: The module features dedicated OK LEDs and TX/RX LEDs to display hardware status and communication traffic.

  • Question: Does this specific configuration include an integrated modem?

    Answer: No, the 00 suffix indicates that no built-in modem is present on the associated I/O module.

  • Question: What is the typical power consumption of this rack interface unit?

    Answer: The module consumes approximately 4.75 watts during normal operation.

  • Question: What is the recorded weight of the hardware unit?

    Answer: The physical weight of the module is 0.68 kg.

  • Question: Can this module be hot-swapped within an active rack?

    Answer: Installation and removal procedures must follow standard safety guidelines for industrial rack-mounted electronic equipment.

  • Question: What slot position does the RIM occupy in the rack?

    Answer: It is installed in the specialized primary interface slot designated on the left-hand side of the 3500 rack chassis.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More