3500/05-01-01-01-00-01 Bently Nevada RACK Chassis 3500 Series 19 Inch
3500/05-01-01-01-00-01 Bently Nevada RACK Chassis 3500 Series 19 Inch
3500/05-01-01-01-00-01 Bently Nevada RACK Chassis 3500 Series 19 Inch
Bently Nevada

3500/05-01-01-01-00-01 Bently Nevada RACK Chassis 3500 Series 19 Inch

SKU: 3500/05-01-01-01-00-01
Categories : All Products
In Stock
  • Dimensions: 48.1 x 27.3 x 26.5 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Bently Nevada 3500/05-01-01-01-00-01, also cataloged as the 3500/05 RACK Chassis, operates as a dedicated hardware component for housing and interconnecting machinery protection modules within Turbine Supervisory Instrumentation (TSI) networks. The chassis provides the physical structure, backplane data communication pathways, and power distribution buses necessary to execute continuous monitoring loops.

Suffix Code Identification

  • Rack Size Option (01): 19-inch Rack accommodating 14 instrumentation module slots plus power supplies.

  • Mounting Options (01): Panel Mount Option, Full-Size Rack configuration.

  • Agency Approval Option (01): CSA/NRTL/C certification for Class 1, Division 2 hazardous environments.

  • Reserved Option (00): None.

  • European Compliance Option (01): CE certified construction.

Physical and Electrical Specifications

Parameter Specification
Model 3500/05-01-01-01-00-01
Spare Model 3500/05
Brand Bently Nevada
Origin USA
Weight 6.52 kg
Shipping Dimensions 48.1 x 27.3 x 26.5 cm
Operating Temp -20 to +65 deg C
Power Consumption Passive backplane; distribution layout supports dual redundant power modules
Module Capacity 14 available instrumentation slots, 2 power supply slots, 1 RIM slot
Physical Form Factor 19-inch standard rackwidth housing
Mounting Type Front-panel cutout integration

Backplane Signal Path and Rotor Dynamics

The passive multi-layer backplane of the 3500/05 chassis routes high-frequency raw transducer inputs and filtered analog metrics between the rear I/O sections and front-facing processing cards. This architecture ensures unified eddy-current probe scaling variables are maintained without trace attenuation across the chassis length. The integrated bus traces are engineered with high cross-talk suppression to isolate transient pulse edges from sensitive proximity sensor signals, preserving accurate gap voltage validation (-10 VDC targets) and phase trigger tracking critical for rotor dynamics analysis.

Hardware Infrastructure FAQ

Q: Does the 3500/05 backplane layout permit hot-swap insertion of individual monitor cards?

A: Yes. The structural design of the backplane incorporates sequenced pin lengths that manage power distribution grounding before signal pathways connect. This enables live hot-swap replacement of instrumentation modules without disrupting adjacent operational monitoring loops inside the chassis.

Q: How is backplane power split when dual redundant power supplies are installed?

A: The chassis backplane contains independent diode-isolated power traces connected to both power supply slots. Power consumption loads are shared dynamically; if one supply suffers an electrical fault, the redundant rail immediately supports the full chassis load with zero switching delay.

Q: What is the mechanical limitation regarding slot assignments for key components like the Rack Interface Module (RIM)?

A: The chassis designates specific hardwired slots for systemic infrastructure. The Rack Interface Module (RIM) must occupy the slot immediately adjacent to the power supplies on the far left, while the remaining 14 slots are universally unassigned for individual monitor configurations.

Field Mounting and Grounding Directives

  • Panel Cutout Alignment: Slide the 19-inch chassis into the prepared panel cutout, ensuring the integrated front flange fits squarely against the external surface. Fasten the perimeter mounting bolts securely to prevent physical harmonic resonance.

  • Chassis Grounding: Connect a low-impedance copper grounding strap from the dedicated brass earth stud on the rear of the chassis directly to the main plant instrument ground bus.

  • Field Shield Separation: Terminate external cable shields at the specific terminals located on each separate rear I/O module. Keep signal shields electrically isolated from the chassis metal frame to eliminate parasitic ground loop currents.

  • Conduit Clearance: Position external field wiring conduits with sufficient clearance below the rear I/O termination space to avoid straining the terminal block connections or restricting convective airflow.

Structural Bill of Materials

  • Included Hardware: One 19-inch 3500/05 panel-mount chassis with factory-installed backplane assembly, side brackets, and front panel bezel elements.

  • Excluded Peripherals: Power supply modules, internal safety barriers, blank slot panels, and instrumentation cards are not part of this base chassis assembly.

Logistics Handling Data

  • Fulfillment Lead Time: Delivery time: 2-7 days when payment finish, routed via high-priority air logistics through DHL, FEDEX, or UPS.

  • Industrial Boxing: Dispatched within heavy-duty, multi-layered anti-static industrial packaging using custom die-cut foam inserts to protect the backplane pins and aluminum structural framework from mechanical impact during transport.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Comau and Invent Highlight Smart Automation for Future Industrial Operations
Aug 13, 2026
MaxWell
Comau and Invent Highlight Smart Automation for Future Industrial Operations
Comau and Invent have presented their latest automation and intralogistics technologies at Brasil em Código...
Read More
More Than 4,400 Rockwell PLCs Found Exposed Online Amid Water Sector Cyber Risks
Aug 13, 2026
MaxWell
More Than 4,400 Rockwell PLCs Found Exposed Online Amid Water Sector Cyber Risks
A global scan conducted by cybersecurity researchers has identified thousands of internet-facing Rockwell Automation programmable...
Read More
HII Partners with Robotics Firms to Accelerate AI-Powered Shipbuilding
Aug 13, 2026
MaxWell
HII Partners with Robotics Firms to Accelerate AI-Powered Shipbuilding
Huntington Ingalls Industries (HII) has announced long-term performance-based production agreements with Path Robotics and GrayMatter...
Read More
ABB Powers Allseas’ Next-Generation Offshore Converter Transport Vessel
Aug 12, 2026
MaxWell
ABB Powers Allseas’ Next-Generation Offshore Converter Transport Vessel
ABB has signed a new agreement with Guangzhou Shipyard International (GSI) to provide the complete power...
Read More
Schneider Electric Unveils Digital Mining Technologies for Electra Mining Africa 2026
Aug 12, 2026
MaxWell
Schneider Electric Unveils Digital Mining Technologies for Electra Mining Africa 2026
Schneider Electric will showcase the future of intelligent mining at Electra Mining Africa 2026, presenting...
Read More
Vale and ABB Launch AI Automation Program to Transform Iron Ore Processing
Aug 12, 2026
MaxWell
Vale and ABB Launch AI Automation Program to Transform Iron Ore Processing
Vale S.A. and ABB have entered into a strategic agreement to expand the use of artificial...
Read More
Siemens Redefines Software-Defined Automation via Simatic AX Extensions
Aug 11, 2026
MaxWell
Siemens Redefines Software-Defined Automation via Simatic AX Extensions
In an ongoing effort to democratize software-defined automation, Siemens has rolled out critical updates to its Simatic...
Read More
Rockwell Automation and CAR Outline Smart Manufacturing Shift in Automotive
Aug 11, 2026
MaxWell
Rockwell Automation and CAR Outline Smart Manufacturing Shift in Automotive
Rockwell Automation and the Center for Automotive Research have published findings detailing how data architectures and...
Read More
Rockwell Automation Highlights Virtualized Food Production at Interpack 2026
Aug 11, 2026
MaxWell
Rockwell Automation Highlights Virtualized Food Production at Interpack 2026
Demonstrating the power of connected enterprise tools, Rockwell Automation unveiled a completely virtualized, end-to-end cookie production and...
Read More
3 Industrial Automation Applications Transforming Modern Manufacturing
Aug 10, 2026
MaxWell
3 Industrial Automation Applications Transforming Modern Manufacturing
Industrial automation applications are helping manufacturers improve production accuracy, operational efficiency, and product consistency. From machine vision...
Read More