1771-P7 Allen-Bradley PLC-5 Power Supply Module
1771-P7 Allen-Bradley PLC-5 Power Supply Module
1771-P7 Allen-Bradley PLC-5 Power Supply Module
1771-P7 Allen-Bradley PLC-5 Power Supply Module
Allen-Bradley

1771-P7 Allen-Bradley PLC-5 Power Supply Module

SKU: 1771-P7
Categories : All Products
In Stock
  • Dimensions: 11.5 x 17.5 x 31.5 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley 1771-P7, also cataloged as the 1771-P7 Power Supply Module, operates as a dedicated hardware component for converting AC line voltage into regulated 5 VDC power within Allen-Bradley PLC-5 1771 I/O chassis systems.

Hardware Revision Matrix & Part Number Variants

The Allen-Bradley 1771-P7 power supply assembly encompasses multiple factory revision designations, including hardware series 1771-P7/A, 1771-P7/B, 1771-P7/C, and 1771-P7/D. Each revision retains physical slot form-factor compatibility and electrical output ratings across the 1771 backplane architecture, ensuring standardized chassis mounting and replacement without panel modifications.

Technical & Operating Specifications

Parameter Specification
Model 1771-P7
Brand Allen-Bradley
Origin USA
Weight 1.6 kg
Shipping Dimensions 11.5 x 17.5 x 31.5 cm
Operating Temp 0 to 60 deg C
Power Consumption 120/220 VAC nominal input power
Input Voltage 120/220 VAC selectable (50/60 Hz)
Output Current 16 A at 5 VDC backplane output
Tariff Code 8537101190

System Integration & Deterministic Backplane Powering

The power supply unit delivers a regulated 16 A 5 VDC rail across the 1771 backplane bus, driving processor cards, communication adaptors, and high-density digital or analog I/O modules. Stable DC voltage distribution prevents bus communication jitter on Profinet / EtherNet/IP deterministic networks connected via upstream bridge cards, maintaining predictable scan execution and firmware flash compatibility across extended I/O density scaling configurations.

Package Component Checklist

  • 1 x Allen-Bradley 1771-P7 Power Supply Module
  • 1 x AC Input Terminal Block Cover Assembly
  • 1 x System Installation Instruction Sheet

Cabinet Mounting & Safety Wiring Sequence

  • Isolate all AC mains power feeders before accessing or wiring the power supply terminal connections.
  • Mount the module securely in the designated power supply slot of the 1771 chassis card cage.
  • Set the AC line selector switch to match the local utility supply (120 VAC or 220 VAC nominal).
  • Connect phase, neutral, and protective earth conductors to the screw terminal strip using insulated ring lugs.
  • Verify clean grounding to the central enclosure earth bar to suppress electrical noise and voltage spikes.

Engineering Technical FAQ

  • What primary DC output current does the 1771-P7 deliver to the backplane?

    The module supplies up to 16 A at 5 VDC directly to the 1771 chassis backplane power distribution rails.

  • What input line voltages are supported by the 1771-P7 power supply?

    It accepts selectable 120 VAC or 220 VAC single-phase AC input sources operating at 50/60 Hz line frequency.

  • Can the 1771-P7 module be installed or removed under live AC power?

    No, AC mains supply voltage must be disconnected prior to inserting, removing, or wiring the module assembly.

  • What hardware revisions are covered under the 1771-P7 product code?

    Valid factory hardware engineering revisions include models designated as 1771-P7/A, 1771-P7/B, 1771-P7/C, and 1771-P7/D.

  • How does the unit maintain power stability for deterministic backplane communication?

    It provides tight output voltage regulation, reducing noise on the 5 VDC rail that supports local communication cards.

  • How is the protective conductor grounded during cabinet mounting?

    The earth wire must connect from the terminal strip directly to the cabinet ground bus using low-impedance copper wire.

  • What ambient temperature range is allowable for continuous rack operation?

    The assembly operates reliably within an ambient cabinet temperature envelope ranging from 0 deg C to 60 deg C.

  • What is the purpose of the front terminal shield cover?

    The plastic shield covers high-voltage AC terminal connections to prevent accidental physical contact by maintenance crew.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More