XZ C827 A102 3BHE038368R0102 ABB AC 800PEC Control Board
XZ C827 A102 3BHE038368R0102 ABB AC 800PEC Control Board
ABB

XZ C827 A102 3BHE038368R0102 ABB AC 800PEC Control Board

SKU: XZ C827 A102 3BHE038368R0102
Categories : ABB
In Stock
  • Dimensions: 44.8 x 17.3 x 4.2 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for high-speed algorithm execution and system task processing in AC 800PEC platforms, the ABB XZ C827 A102 3BHE038368R0102 (XZ C827 A102 Control Board) provides direct physical/electrical execution.

Component Designations & System Architecture

The ABB XZ C827 A102 3BHE038368R0102 integrates processing hardware designed for high-performance closed-loop regulation:

  • XZ C827 A102: Base hardware identification for the main processing control board assembly.
  • 3BHE038368R0102: Specific factory order number for the populated PCB unit.
  • High-Speed Onboard Memory: Integrated 512 MB to 1 GB RAM for dynamic variable processing and 2 to 4 GB non-volatile flash memory for OS/application storage.
  • AC 800PEC Integration: Form-factor compatibility engineered for direct installation into AC 800PEC processing racks.

Physical and Electrical Specifications

Parameter Specification
Model XZ C827 A102 (3BHE038368R0102)
Brand ABB
Origin SWEDEN
Product Type Control Board
Supply Voltage 24 VDC (+/-10%)
Power Consumption 5 W to 10 W
RAM Capacity 512 MB to 1 GB
Flash Memory 2 GB to 4 GB
Unit Weight 2.82 kg
Shipping Dimensions 44.8 cm x 17.3 cm x 4.2 cm
Operating Temp -20 to +70 deg C
Storage Temp -40 to +85 deg C
Relative Humidity 5% to 95% non-condensing

Bus Communication Speed & System Synchronicity

The control board communicates over internal bus channels maintaining rapid backplane bus communication velocity across system modules. Compatible with Profinet / EtherNet/IP deterministic networks, the hardware facilitates synchronized deterministic control cycles. High I/O density scaling and direct firmware flash compatibility ensure uninterrupted program execution, low latency signal processing, and continuous diagnostic monitoring across field units.

Package Delivery Contents

  • 1 x ABB XZ C827 A102 3BHE038368R0102 Control Board
  • 1 x Anti-static ESD protection shield
  • 1 x Factory hardware installation guide

Chassis Mounting & Field Wiring Directives

  • Electrostatic Precaution: Wear a grounded ESD wrist strap before handling or inserting the control board assembly.
  • Rack Mounting: Slide the PCB module evenly along the subrack card guides and seat backplane pins without applying lateral force.
  • Power Supply Integrity: Ensure the 24 VDC main power supply remains within the nominal +/-10% operating tolerance.
  • Shield Grounding: Ground all shielded communication cables directly at the cabinet grounding bar to mitigate electromagnetic interference.

Frequently Asked Questions

  • What supply voltage range does the XZ C827 A102 control board require?

    The board operates on a 24 VDC nominal supply voltage with an allowable operational tolerance of +/-10%.

  • What is the typical power dissipation of the 3BHE038368R0102 board?

    Under normal operational conditions, the board draws a typical power consumption of 5 W to 10 W.

  • What memory capacities are built into the XZ C827 A102 control board?

    The unit incorporates 512 MB to 1 GB of system RAM alongside 2 GB to 4 GB of non-volatile flash storage.

  • What operating temperature range is supported by the hardware?

    The control board is rated for continuous operation in ambient temperatures ranging from -20 to +70 deg C.

  • Can the control board be inserted while the rack power is active?

    No. Subrack 24 VDC power must be disconnected before installing or removing the board to prevent backplane damage.

  • What is the net weight of the XZ C827 A102 module?

    The standalone control board unit has a physical weight of 2.82 kg.

  • How is electrical noise suppressed on communication lines connected to the board?

    Noise suppression is managed via internal ground planes and external shielded cable bonding directly to cabinet busbars.

  • Which system series uses the XZ C827 A102 3BHE038368R0102 board?

    This control board is specifically engineered for integration into the ABB AC 800PEC controller architecture.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Oct 21, 2026
Maxwell
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Chengdu Economic and Technological Development Zone hosted a landmark conference on September 23, 2026, bringing...
Read More
OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Oct 19, 2026
Maxwell
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Water utilities around the world are discovering that the same programmable logic controllers that run...
Read More
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
Oct 19, 2026
Maxwell
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
A conveyor belt spanning a hundred kilometers does not fail politely. In iron-ore logistics, the...
Read More
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
Oct 18, 2026
Maxwell
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
On September 28, 2026, a robotics company in Yichang, Hubei Province unveiled what it claims...
Read More
Ondas Cyberhawk Secures Multi-Year Drone Inspection Contract with SSE plc
Oct 18, 2026
Maxwell
Ondas Cyberhawk Secures Multi-Year Drone Inspection Contract with SSE plc
drone-based infrastructure inspection has moved from experimental pilot projects to long-term service agreements, signaling a...
Read More
IFR World Robotics Report 2026 China Installs 354000 Industrial Robots
Oct 18, 2026
Maxwell
IFR World Robotics Report 2026 China Installs 354000 Industrial Robots
The International Federation of robotics released its 2026 World Robotics Report on September 24, and...
Read More