SPW482-53 Yokogawa CENTUM VP Power Supply Module
SPW482-53 Yokogawa CENTUM VP Power Supply Module
SPW482-53 Yokogawa CENTUM VP Power Supply Module
SPW482-53 Yokogawa CENTUM VP Power Supply Module
SPW482-53 Yokogawa CENTUM VP Power Supply Module
Yokogawa

SPW482-53 Yokogawa CENTUM VP Power Supply Module

SKU: SPW482-53
Categories : All Products
In Stock
  • Dimensions: 45 mm x 130 mm x 128 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Yokogawa SPW482-53 functions as a high-reliability power conversion backbone for the CENTUM VP distributed control system (DCS). This module transforms standard 220-240V AC line voltage into stabilized DC rails, ensuring the continuous operation of field control stations and critical I/O nests. By providing a clean, dual-voltage output (5.1 VDC and 24 VDC), it protects sensitive electronic components from line noise and voltage fluctuations. In large-scale industrial plants—such as refineries and chemical processing facilities—the SPW482-53 maintains the system integrity required for mission-critical automation. Its rugged Japanese engineering guarantees stable power delivery even under high-load conditions, preventing unplanned downtime in complex process control loops.

Technical Configuration

The SPW482-53 follows a specific suffix logic designed for the CENTUM VP hardware environment, ensuring compatibility with particular rack types and regional power standards.

Model Suffix Analysis: SPW482-53

  • SPW482: This identifies the primary Power Supply Module series utilized in high-density FIO (Field Input/Output) nodes.

  • -5: Specifies the input power characteristics, designated here for high-voltage AC utility power (220 V to 240 V AC).

  • 3: Indicates the specific revision or internal component configuration tailored for modern CENTUM VP cabinets, often including updated protection circuitry for enhanced MTBF.

Technical Specifications

Feature Specification
Manufacturer Yokogawa
Model Number SPW482-53
Input Voltage 220 V to 240 V AC (±10%)
Frequency 50/60 Hz (±3 Hz)
Output 1 (Logic) 5.1 VDC @ 7.8 A
Output 2 (Field) 24 VDC @ 1.7 A
Max Power Consumption 230 VA
Operating Temperature -20°C to +70°C
Dimensions (W x H x D) 45 mm x 130 mm x 128 mm
Weight 1.0 kg

Engineering Advantages

The SPW482-53 excels in high-availability environments due to its superior thermal management and electrical isolation. Unlike standard industrial power units, this module features a highly filtered output stage that eliminates electromagnetic interference (EMI) which could otherwise compromise the accuracy of analog sensor signals.

Its architecture supports 1:1 redundancy configurations within the CENTUM VP rack. This design allows two modules to share the load, ensuring that if one unit fails, the other assumes the full power requirements of the node without interrupting the process. This "hot-standby" capability is essential for plants operating 24/7 in extreme environments where power stability is synonymous with safety.

Installation Guide

Proper integration of the SPW482-53 ensures the longevity of the entire DCS node.

Mounting and Cooling

Install the module vertically within the specified I/O nest to facilitate natural convection. Maintain at least 50mm of clearance around the rack's ventilation slots. Excessive heat buildup can reduce the lifespan of the electrolytic capacitors.

Input Wiring

Use dedicated circuit breakers for the AC input. Ensure that the ground terminal (L/G) connects to a high-quality functional earth system with a resistance of less than 100 ohms to prevent common-mode noise issues.

Redundancy Verification

When installing in a redundant pair, verify that both "Status" LEDs are green. Check the system alarms in the HIS (Human Interface Station) to ensure the secondary module is correctly recognized by the control logic.

Technical FAQs

Q1: Can the SPW482-53 be used with 110V AC input?

A1: No. The -5 suffix designates a 220-240V AC input. For 110V AC applications, the SPW481 series is required. Attempting to run this module on 110V may result in insufficient output or internal damage.

Q2: Does this module require external cooling fans?

A2: No. The SPW482-53 is designed for high-efficiency operation via natural convection within a standard Yokogawa cabinet, provided that ambient temperatures stay within the -20°C to 70°C range.

Q3: Is this module hot-swappable during plant operation?

A3: Yes, in a redundant configuration, you can replace a faulty SPW482-53 while the system is live. The remaining power module will carry the full load, preventing any disruption to the field control station.

Q4: How does the module indicate an internal fault?

A4: The front panel features a status LED. A green light indicates normal output, while an unlit or red indicator signals a voltage drop, internal fuse failure, or input power loss.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Oct 21, 2026
Maxwell
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Chengdu Economic and Technological Development Zone hosted a landmark conference on September 23, 2026, bringing...
Read More
OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Oct 19, 2026
Maxwell
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Water utilities around the world are discovering that the same programmable logic controllers that run...
Read More
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
Oct 19, 2026
Maxwell
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
A conveyor belt spanning a hundred kilometers does not fail politely. In iron-ore logistics, the...
Read More
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
Oct 18, 2026
Maxwell
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
On September 28, 2026, a robotics company in Yichang, Hubei Province unveiled what it claims...
Read More
Ondas Cyberhawk Secures Multi-Year Drone Inspection Contract with SSE plc
Oct 18, 2026
Maxwell
Ondas Cyberhawk Secures Multi-Year Drone Inspection Contract with SSE plc
drone-based infrastructure inspection has moved from experimental pilot projects to long-term service agreements, signaling a...
Read More
IFR World Robotics Report 2026 China Installs 354000 Industrial Robots
Oct 18, 2026
Maxwell
IFR World Robotics Report 2026 China Installs 354000 Industrial Robots
The International Federation of robotics released its 2026 World Robotics Report on September 24, and...
Read More