S8JX-G10024CD Omron Switch Mode Power Supply S8JX Series
S8JX-G10024CD Omron Switch Mode Power Supply S8JX Series
Omron

S8JX-G10024CD Omron Switch Mode Power Supply S8JX Series

SKU: S8JX-G10024CD
Categories : All Products
In Stock
  • Dimensions: 30 x 15 x 10 cm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Omron S8JX-G10024CD, also cataloged as the S8JX-G10024C Switch Mode Power Supply, operates as a dedicated hardware component for AC-to-DC power conversion and regulated 24 VDC voltage distribution within control cabinet backplanes.

Model Suffix Structure & Nomenclature

  • S8JX-G: Standard switch mode power supply unit platform
  • 100: 100 W rated power output capacity
  • 24: 24 VDC regulated output voltage rating
  • C: Covered frame physical construction with protective metallic outer shell
  • D: Integrated DIN-rail mounting bracket configuration

Technical Hardware Specifications

Parameter Specification
Model S8JX-G10024CD
Brand Omron
Origin Japan
Weight 0.25 kg
Shipping Dimensions 30 x 15 x 10 cm
Operating Temp -10 deg C to 60 deg C
Power Consumption 100 W output capacity
Input Voltage 100 to 240 VAC (50/60 Hz) / 80 to 370 VDC
Output Voltage 24 VDC
Output Current 4.5 A
Construction Covered structure
Mounting Type DIN-rail mounting

Controller Interfacing & System Performance

The power supply unit delivers noise-filtered DC power across local rack assemblies and connected I/O density scaling racks. Stable output regulation prevents execution dropouts during transient loading on PLC backplanes. High firmware flash compatibility across downstream system nodes ensures uninterrupted EtherCAT and EtherNet/IP communication loops while preserving backplane bus communication velocity Licences.

Package Component List

  • 1 x S8JX-G10024CD Switch Mode Power Supply Assembly
  • 1 x Terminal Cover Plate
  • 1 x Safety Precaution & Installation Leaflet

Wiring Directives & Physical Mounting

Panel Attachment Protocol

  • Snap the integral rear bracket onto a standard 35 mm DIN rail until the locking spring clip engages securely.
  • Provide a minimum of 20 mm clearance above and below the metal housing to permit natural convective airflow.

Electrical Wiring Rules

  • Wire the AC supply lines to the labeled L and N screw terminals using crimped spade or ring terminals.
  • Connect the FG (Frame Ground) terminal directly to the central panel earth ground bar using a heavy gauge conductor.

Frequently Asked Questions

  • What is the nominal output voltage and current rating?

    The unit provides a regulated 24 VDC output at a maximum continuous load current of 4.5 A (100 W capacity).

  • What input voltage ranges are supported by the power supply?

    It accepts AC input voltages from 100 to 240 VAC (50/60 Hz) or DC input voltages from 80 to 370 VDC.

  • Does the unit include built-in mounting hardware for standard rails?

    Yes, the suffix D designation indicates an integrated DIN-rail mounting bracket factory installed on the rear.

  • How is the physical housing constructed on this specific model?

    The suffix C designation denotes a covered structure with a protective perforated metal outer enclosure.

  • What terminal type is used for field power connections?

    External wiring connects directly to front-accessible barrier screw terminals rated for panel wiring.

  • Is parallel operation supported to increase output current capability?

    Standard S8JX power supply units do not support direct parallel operation for current sharing applications.

  • What thermal clearance is required during cabinet installation?

    Maintain at least 20 mm top and bottom air gaps to prevent internal thermal buildup during high-load operations.

  • Must power be removed before servicing terminal connections?

    All AC main inputs and DC outputs must be completely de-energized before touching terminal block screws.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More