PW301 S4 Yokogawa Centum System 5.1V DC Power Supply Module
PW301 S4 Yokogawa Centum System 5.1V DC Power Supply Module
PW301 S4 Yokogawa Centum System 5.1V DC Power Supply Module
Yokogawa

PW301 S4 Yokogawa Centum System 5.1V DC Power Supply Module

SKU: PW307
Categories : All Products
In Stock
  • Dimensions: 27.9 cm x 10.2 cm x 27.9 cm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen

Request a quote

1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Yokogawa PW301 is a high-performance, modular power supply unit engineered to serve as the primary energy source for the Centum VP distributed control system (DCS) and associated high-precision process analyzers. This module is designed to convert standard AC line voltage into a stabilized, low-ripple DC output necessary for the sensitive logic circuits of field control units and I/O nests. Built with industrial-grade components, the PW301 emphasizes continuous uptime and thermal efficiency, ensuring that critical control infrastructure remains operational even under fluctuating supply conditions.

Vital Hardware Parameters and Ratings

  • Input Voltage Range: 100 to 120 V AC (Standard range for high-reliability AC feeds)

  • Maximum Input Current: 6.0 A

  • Nominal Output Voltage: 5.1 V DC (Optimized for internal system logic levels)

  • Continuous Output Current: 15.0 A

  • Operational Design: Modular plug-in architecture for rapid hot-swap replacement

  • Energy Efficiency: Advanced switching technology to minimize cabinet heat buildup

  • Physical Weight: 3.3 kg (Approximately 7 lbs 3 oz)

  • Dimensions: 27.9 cm x 10.2 cm x 27.9 cm (11.0" x 4.0" x 11.0")

  • Manufacturing Origin: Japan

Practical Industrial Deployments

The PW301 is a specialized component typically integrated into mission-critical automation environments including:

  • Centralized Control Rooms: Providing steady power to the rack-mounted processors and communication modules of a Centum VP system.

  • Analytical Instrument Shelters: Powering complex gas chromatographs and liquid analyzers where voltage stability is required for measurement accuracy.

  • Redundant Power Configurations: Implementing dual-module setups to provide fault-tolerant power delivery in continuous process industries like petrochemical refining.

  • Field Control Stations: Supplying the necessary current for high-density I/O configurations across various industrial manufacturing plants.

FAQ

Q: Can the PW301 be installed while the system is live?

A: Yes, the modular design is specifically engineered for easy integration and maintenance, supporting the high-availability requirements of industrial DCS environments where downtime must be avoided.

Q: What is the significance of the 5.1V DC output versus a standard 5V supply?

A: The 5.1V DC rating is specifically calibrated to account for minor voltage drops across the backplane and connectors, ensuring that the logic cards receive exactly the 5V required at the point of use.

Q: Is this power supply compatible with 220V AC electrical systems?

A: No, this specific model is rated for 100-120V AC input. For 220V applications, a different variant of the Yokogawa power supply series should be utilized to prevent hardware damage.

Q: How does the module indicate its current status to operators?

A: The unit typically features front-panel LED indicators that provide real-time status of the input power presence and the health of the DC output, facilitating quick visual inspections.

Q: What measures are taken to prevent the module from overheating?

A: The PW301 utilizes high-efficiency switching regulators and a ventilated chassis design to dissipate heat effectively, though it should always be installed in cabinets with adequate airflow.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB and Mettler Toledo Partner to Drive Robotic Automation in Laboratory Environments
Jun 05, 2026
MaxWell
ABB and Mettler Toledo Partner to Drive Robotic Automation in Laboratory Environments
Industrial technology leaderABBRobotics has signed a memorandum of understanding with Mettler Toledo to bridge collaborative...
Read More
Emerson Launches PACSystems IPC 2010 to Bridge Shop Floor Data with Cloud Networks
Jun 05, 2026
MaxWell
Emerson Launches PACSystems IPC 2010 to Bridge Shop Floor Data with Cloud Networks
Global engineering technology leaderEmersonhas introduced its PACSystems IPC 2010, a compact and rugged industrial computer...
Read More
KUKA Partners with Micropsi to Integrate MIRAI AI Vision Systems into Industrial Robotics
Jun 05, 2026
MaxWell
KUKA Partners with Micropsi to Integrate MIRAI AI Vision Systems into Industrial Robotics
Industrial robotics manufacturer KUKA has formed a strategic partnership with Micropsi Industries to offer the...
Read More
Banner Engineering Launches DXM1200 Industrial Wireless Gateways for Severe Environments
Jun 05, 2026
MaxWell
Banner Engineering Launches DXM1200 Industrial Wireless Gateways for Severe Environments
Industrial automation instrumentation manufacturer Banner Engineering has released its DXM1200-B2 and DXM1200-X2 wireless controller series,...
Read More
Idec Launches FT2J Series Combined 7-Inch HMI and Programmable Controller
Jun 05, 2026
MaxWell
Idec Launches FT2J Series Combined 7-Inch HMI and Programmable Controller
Global automation components manufacturer Idec has expanded its SmartAXIS Touch hardware family with the introduction...
Read More
Rockwell Automation Introduces Rugged ASEM 6300 Industrial PCs for FactoryTalk Optix Ecosystem
Jun 05, 2026
MaxWell
Rockwell Automation Introduces Rugged ASEM 6300 Industrial PCs for FactoryTalk Optix Ecosystem
Industrial automation leaderRockwell Automationhas expanded its visualization hardware portfolio with the launch of the ASEM...
Read More
Fanuc Invests $110M in Massive Michigan West Campus to Boost Robotics Logistics
Jun 04, 2026
MaxWell
Fanuc Invests $110M in Massive Michigan West Campus to Boost Robotics Logistics
Industrial automation giantFanuchas officially opened a new 650,000-square-foot West Campus facility in Auburn Hills, Michigan,...
Read More
Rockwell Automation Expands Armor Lineup to Accelerate On-Machine System Design
Jun 04, 2026
MaxWell
Rockwell Automation Expands Armor Lineup to Accelerate On-Machine System Design
To minimize panel footprints and accelerate deployment timelines for machine builders,Rockwell Automationhas expanded its ruggedized...
Read More
Schneider Electric Unveils Next-Gen IT/OT Integration Portfolio at SPS
Jun 04, 2026
MaxWell
Schneider Electric Unveils Next-Gen IT/OT Integration Portfolio at SPS
Global energy management and automation specialistSchneider Electrichas unveiled an expansive suite of industrial technology designed...
Read More
Schneider Electric Unveils Unified Ecosystem Strategy for Seamless Industrial IT-OT Convergence
Jun 04, 2026
MaxWell
Schneider Electric Unveils Unified Ecosystem Strategy for Seamless Industrial IT-OT Convergence
Schneider Electric presented a comprehensive showcase of its next-generation smart manufacturing portfolio, demonstrating how a...
Read More