NKTU02-10 ABB Infi 90 Termination Cable
ABB

NKTU02-10 ABB Infi 90 Termination Cable

SKU: NKTU02-10
Categories : ABB
In Stock
  • Dimensions: 30.5 x 7.6 x 35.6 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB NKTU02-10, also cataloged as the NKTU02 I/O Module to Termination Module Cable, operates as a dedicated hardware component for direct signal routing between process I/O cards and field termination units within ABB Bailey Infi 90 racks.

Cable Assembly Variants and Length Options

  • NKTU02-10 Base Unit: Factory-terminated assembly configured for standard rack signal connections.
  • NKTU02 Series Standard: Low-attenuation multi-conductor design engineered for Bailey Infi 90 I/O interfaces.
  • Strain-Relief Backshell Standard: Integrated hardware retention connectors at both cable ends.

Technical Data Specifications

Parameter Specification
Model NKTU02-10
Brand ABB
Origin SWEDEN
Weight 0.9 kg
Shipping Dimensions 30.5 x 7.6 x 35.6 cm
Operating Temp -20 to +80 deg C
Storage Temp -40 to +85 deg C
Humidity 5 - 95 % RH non-condensing
Power Consumption Passive component (N/A)
Conductor Gauge 22-24 AWG
Voltage Rating 300 V AC/DC
Current Rating 3-5 A per conductor
Harmonized Tariff Code 8537101190

High-Density I/O Signal Transmission

In Bailey Infi 90 controller racks, the NKTU02-10 interface cable optimizes I/O density scaling by routing high-density control signals directly from rack-mounted modules to field termination units. The multi-conductor 22-24 AWG internal layout prevents channel crosstalk and maintains backplane bus communication velocity across continuous 300 V AC/DC signal paths.

Delivery Package Scope

  • 1 x ABB NKTU02-10 I/O Module to Termination Module Cable
  • 1 x Cable Inspection Certificate

Cabinet Installation and Routing Guidelines

  • Minimum Bending Radius: Maintain a bend radius of at least 10 times the cable overall diameter to avoid internal wire stress.
  • Separation Rules: Keep the signal cable assembly in low-voltage wiring troughs at least 300 mm away from high-power AC distribution lines.
  • Connector Retention: Engage and fully tighten the built-in locking screws on both module connectors to prevent accidental dislodgement under vibration.
  • Grounding Shield: Ensure overall cable shielding connects to cabinet safety ground via the termination module grounding bracket.

Frequently Asked Questions

  • What causes channel signal degradation across the NKTU02-10 cable harness?

    Exceeding the 3-5 A per conductor current rating generates excessive heat, causing conductor resistance shifts and signal attenuation.

  • Can the NKTU02-10 assembly be disconnected while the parent I/O module is live?

    Unplugging the cable during live operations drops active signal loops instantly, which may trigger field actuator safety trips.

  • What is the maximum dielectric insulation limit for the internal conductors?

    The internal 22-24 AWG copper conductors feature insulation rated up to 300 V AC/DC continuous potential between conductors and ground.

  • How does thermal exposure beyond +80 deg C impact cable performance?

    Operating above +80 deg C weakens outer insulation, potentially causing dielectric breakdown or short circuits between signal pairs.

  • Is field splicing recommended to extend the cable assembly?

    Field splicing disrupts impedance matching and signal shielding, leading to noise pickup; dedicated factory cables must be used.

  • Does the cable require external power to operate?

    No, the NKTU02-10 is a passive structural cable harness with zero power consumption on the backplane logic bus.

  • What wire size range is utilized within the NKTU02-10 assembly?

    The multi-conductor harness is constructed using stranded tinned copper conductors ranging from 22 AWG to 24 AWG.

  • How does humidity impact the cable connector contact points?

    Operation within 5-95% non-condensing RH is standard; condensed moisture on pins can cause tracking currents and short circuits.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

SUPCON Showcases Industrial AI and Autonomous Operating Plant Solutions at OGA 2026
Sep 16, 2026
MaxWell
SUPCON Showcases Industrial AI and Autonomous Operating Plant Solutions at OGA 2026
SUPCON Technology showcased its comprehensive industrial AI and autonomous operating plant solutions at the Oil...
Read More
ADNOC Deploys Taurob Heavy-Duty Inspection Robot at Tawila Gas Compression Plant
Sep 16, 2026
MaxWell
ADNOC Deploys Taurob Heavy-Duty Inspection Robot at Tawila Gas Compression Plant
Abu Dhabi National Oil Company has successfully deployed a Taurob heavy-duty inspection robot at the...
Read More
Honeywell Technologies Innovation Summit Brings AI and Autonomous Operations to Guiyang
Sep 16, 2026
MaxWell
Honeywell Technologies Innovation Summit Brings AI and Autonomous Operations to Guiyang
Honeywell Technologies convened industry leaders, technical experts, and ecosystem partners at the 2026 Honeywell Technologies...
Read More
US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
Sep 15, 2026
MaxWell
US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
The U.S. Energy Information Administration forecasts that the United States will add a record 86...
Read More
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
Sep 15, 2026
MaxWell
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
WindEurope expects Europe to install 151 gigawatts of new wind power capacity over the 2026-2030...
Read More
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
Sep 15, 2026
Shopify API
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
India has achieved a significant renewable energy milestone, reaching 150 gigawatts of installed solar capacity...
Read More
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
Sep 14, 2026
Shopify API
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
The German government has approved plans to reform offshore wind auction processes, according to Windpower...
Read More
Masdar and ScottishPower Advance East Anglia Three 1.4 GW Offshore Wind Project
Sep 14, 2026
Shopify API
Masdar and ScottishPower Advance East Anglia Three 1.4 GW Offshore Wind Project
Masdar and ScottishPower Renewables have announced significant progress on the East Anglia Three offshore wind...
Read More
China Develops World's Largest 50MW Floating Wind Turbine Prototype
Sep 14, 2026
Shopify API
China Develops World's Largest 50MW Floating Wind Turbine Prototype
China is developing what is planned to become the world's largest floating wind turbine with...
Read More
Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
Sep 13, 2026
MaxWell
Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
The oil and gas industry is accelerating adoption of predictive maintenance strategies, with over 60%...
Read More