NICS01 ABB Termination Module Bailey INFI 90
NICS01 ABB Termination Module Bailey INFI 90
NICS01 ABB Termination Module Bailey INFI 90
NICS01 ABB Termination Module Bailey INFI 90
NICS01 ABB Termination Module Bailey INFI 90
ABB

NICS01 ABB Termination Module Bailey INFI 90

SKU: NICS01
Categories : ABB
In Stock
  • Dimensions: 17.8 x 5.1 x 17.8 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB NICS01, also cataloged as the NICS01 Termination Module, operates as a dedicated hardware component for field signal interface routing and DC power distribution within Bailey INFI 90 DCS racks. It bridges external field wiring directly to system I/O modules, providing structured terminal connections for 3 A at 24 VDC continuous bus loads and 1 A at 24/125 VDC discrete loops without inducing signal cross-talk or thermal degradation.

Signal Circuitry & Contact Load Architecture

  • NICS01: Standard base model designation for the INFI 90 field termination unit.
  • High-Current Bus Rating: Integrated power trace layout supporting up to 3 A continuous current at 24 VDC for system field distribution.
  • Auxiliary Signal Contacts: Discrete signal channel wiring path rated for 1 A switching/conduction at 24 VDC or 125 VDC operation.

Technical & Operating Specifications

Parameter Specification
Model NICS01
Brand ABB
Origin SWEDEN
Weight 0.2 kg
Shipping Dimensions 17.8 x 5.1 x 17.8 cm
Operating Temp -20 deg C to +70 deg C
Power Consumption 3-7 W (typical)
Power Supply 24 V DC
Input Voltage 24 V DC nominal
Load Rating (Primary) 3 A @ 24 VDC
Load Rating (Secondary) 1 A @ 24/125 VDC
Storage Temperature -40 deg C to +85 deg C
Humidity 5-95% RH (non-condensing)
Tariff Code 8537101190

Deterministic Bus Connectivity & Power Distribution

The NICS01 termination unit provides direct signal routing between field devices and rack-mounted processing hardware, maintaining backplane bus communication velocity across the INFI 90 architecture. By standardizing physical terminal connections, it prevents voltage drop across high-density I/O channels and ensures consistent signal timing. The assembly maintains physical firmware flash compatibility standards for linked controller interfaces while operating efficiently under a 3-7 W dissipation profile across -20 deg C to +70 deg C ambient spans.

Standard Package & Ordering Information

  • 1 x ABB NICS01 Termination Module unit
  • Factory ESD protective packaging enclosure

Wiring & Mounting Field Procedures

  • Power Source Isolation: De-energize all connected 24 VDC field lines and 125 VDC potential sources before attaching or removing terminal connections.
  • Conductor Termination Torque: Secure field wiring to screw terminal blocks using a calibrated screwdriver, applying a torque of 0.5 to 0.6 Nm to maintain physical contact.
  • Shield Grounding Rules: Connect field cable drain wires to the designated system shield bus bar; do not ground shields at both ends to prevent earth ground loops.
  • Enclosure Clearance: Maintain a minimum distance of 50 mm between terminal blocks and cabinet wireways to allow convection cooling and prevent cable strain.

Technical & Diagnostic FAQ

  • What is the maximum continuous current rating for the primary 24 VDC power bus?

    The primary power bus path on the NICS01 supports a maximum continuous current load of 3 A at 24 VDC.

  • What voltage levels are supported on the secondary 1 A rated terminals?

    The 1 A rated terminal paths are specified to handle operational field voltages of 24 VDC or 125 VDC.

  • Is the NICS01 termination module suitable for hot-swapping under live load?

    Field wiring circuits must be isolated prior to module disconnection to prevent electrical arcing and field channel faults.

  • What is the typical power dissipation of the NICS01 module during operation?

    Under standard load conditions, internal thermal power consumption ranges between 3 W and 7 W.

  • How are field cable shields terminated on this module?

    Shield wires connect directly to the module chassis earth terminal to route noise away from signal conductors.

  • Does the module require an external secondary power feed for internal operation?

    No, the unit operates off the nominal 24 V DC system supply fed through the standard backplane distribution.

  • What environmental humidity limits apply during continuous field operation?

    The unit operates within 5% to 95% relative humidity non-condensing across its -20 deg C to +70 deg C temperature range.

  • What gauge wire is recommended for the terminal block connections?

    Use stranded copper conductors ranging from 14 AWG to 22 AWG depending on current load requirements.

 

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More