LD800HSE 3BDH000320R02 ABB AC800F Linking Device
LD800HSE 3BDH000320R02 ABB AC800F Linking Device
ABB

LD800HSE 3BDH000320R02 ABB AC800F Linking Device

SKU: 3BDH000320R02
Categories : ABB
In Stock
  • Dimensions: 4.7 x 12.2 x 13.3 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for fieldbus protocol conversion and network bridging in distributed control architectures, the ABB LD800HSE 3BDH000320R02, also cataloged as the LD800HSE Linking Device, provides direct physical and electrical execution for routing data between Ethernet and fieldbus communication tiers.

Part Number Breakdown & Configuration Matrix

Component Level Identifier Technical Specification
Brand ABB Manufacturer entity
Series AC800F Process control platform
Base Model LD800HSE Linking Device designation
Spare Part Number 3BDH000320R02 Factory catalog reference ID

Hardware Specifications

Parameter Specification
Model LD800HSE 3BDH000320R02
Brand ABB
Origin Sweden
Weight 0.42 kg
Shipping Dimensions 4.7 cm x 12.2 cm x 13.3 cm
Operating Temp 0 deg C to +55 deg C
Power Consumption 5.0 W typical
Channels 4 channels
Transfer Rate 31.25 kbit/s fieldbus, 10/100 Mbit/s Ethernet

Backplane Bus & Network Communication Parameters

The hardware utilizes backplane bus communication velocity licences to maintain deterministic packet transfers across network segments. I/O density scaling capabilities allow system expansion without violating bus update intervals or protocol timing constraints. Firmware flash compatibility ensures that communication stacks remain synchronized across distributed node architectures during active process operations.

Package Contents & Ordering Info

  • 1 x ABB LD800HSE Linking Device (Part Number: 3BDH000320R02)
  • 1 x RJ45 Network Patch Cable Assembly
  • 1 x Technical Compliance Documentation Leaflet

Field Installation Guidelines

  • Mount the linking device securely onto a standard industrial DIN-rail, ensuring proper mechanical latching.
  • Connect the Ethernet interface using a shielded Cat5e or higher cable to the 10BASE-T/100BASE-TX RJ45 port.
  • Terminate the 4-channel fieldbus wiring to the designated connection terminals, maintaining correct polarity.
  • Verify that ground continuity is established between the device chassis and the cabinet grounding bus to minimize noise.

Frequently Asked Questions

  • Q: What is the primary operational function of this linking device within the control system?
  • A: It bridges high-speed Ethernet networks with lower-speed fieldbus communication channels.
  • Q: How many communication channels does the unit support?
  • A: The hardware supports 4 independent fieldbus channels alongside standard Ethernet connectivity.
  • Q: What data transfer rates are supported on the Ethernet port?
  • A: The RJ45 port supports autosensing data rates of 10 Mbit/s and 100 Mbit/s.
  • Q: What is the specified operating temperature range for the hardware?
  • A: The device operates reliably within an ambient temperature range of 0 deg C to +55 deg C.
  • Q: Does this device require an external power supply connection?
  • A: Yes, it requires a stable DC power input to sustain internal processing and communication circuits.
  • Q: What precautions should be taken during fieldbus wiring installation?
  • A: Ensure proper shielding and termination resistors are utilized to prevent signal reflections and data corruption.
  • Q: Can the device firmware be updated in the field?
  • A: Yes, firmware flash compatibility allows updates to maintain protocol synchronization with controller nodes.
  • Q: What maintenance procedures are recommended for this hardware?
  • A: Regularly inspect terminal torque settings and verify that ventilation clearances around the housing remain unobstructed.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

European Wind Energy Installations Surge 30% in First Half of 2026
Sep 17, 2026
MaxWell
European Wind Energy Installations Surge 30% in First Half of 2026
WindEurope reports that European wind energy installations surged 30 percent in the first half of...
Read More
Siemens and NVIDIA Build Industrial AI Operating System for Manufacturing and Semiconductor Design
Sep 17, 2026
MaxWell
Siemens and NVIDIA Build Industrial AI Operating System for Manufacturing and Semiconductor Design
Siemens and NVIDIA are collaborating to build what they describe as an industrial artificial intelligence...
Read More
Dongfang Electric Installs World's Largest 26MW Offshore Wind Turbine in China
Sep 17, 2026
MaxWell
Dongfang Electric Installs World's Largest 26MW Offshore Wind Turbine in China
Dongfang Electric Corporation has successfully completed the installation of what is described as the world's...
Read More
SUPCON Showcases Industrial AI and Autonomous Operating Plant Solutions at OGA 2026
Sep 16, 2026
MaxWell
SUPCON Showcases Industrial AI and Autonomous Operating Plant Solutions at OGA 2026
SUPCON Technology showcased its comprehensive industrial AI and autonomous operating plant solutions at the Oil...
Read More
ADNOC Deploys Taurob Heavy-Duty Inspection Robot at Tawila Gas Compression Plant
Sep 16, 2026
MaxWell
ADNOC Deploys Taurob Heavy-Duty Inspection Robot at Tawila Gas Compression Plant
Abu Dhabi National Oil Company has successfully deployed a Taurob heavy-duty inspection robot at the...
Read More
Honeywell Technologies Innovation Summit Brings AI and Autonomous Operations to Guiyang
Sep 16, 2026
MaxWell
Honeywell Technologies Innovation Summit Brings AI and Autonomous Operations to Guiyang
Honeywell Technologies convened industry leaders, technical experts, and ecosystem partners at the 2026 Honeywell Technologies...
Read More
US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
Sep 15, 2026
MaxWell
US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
The U.S. Energy Information Administration forecasts that the United States will add a record 86...
Read More
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
Sep 15, 2026
MaxWell
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
WindEurope expects Europe to install 151 gigawatts of new wind power capacity over the 2026-2030...
Read More
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
Sep 15, 2026
Shopify API
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
India has achieved a significant renewable energy milestone, reaching 150 gigawatts of installed solar capacity...
Read More
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
Sep 14, 2026
Shopify API
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
The German government has approved plans to reform offshore wind auction processes, according to Windpower...
Read More