ITCTU11 ABB Infi 90 Termination Unit
ABB

ITCTU11 ABB Infi 90 Termination Unit

SKU: ITCTU11
Categories : ABB
In Stock
  • Dimensions: 20.3 x 5.1 x 35.6 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB ITCTU11, also cataloged as the ITCTU11 Termination Unit, operates as a dedicated hardware component for field signal termination and I/O bus routing within ABB Bailey Infi 90 control cabinets.

Hardware Configuration Options

  • ITCTU11 Standard: Primary termination assembly configured for field signal landing in Infi 90 racks.

  • ITCTU11-A High Isolation: Variant supporting enhanced dielectric separation across adjacent channels.

  • Infi 90 Interface Standard: Standardized multi-pin connector landing profile for system interconnect cables.

Hardware Specifications

Parameter Specification
Model ITCTU11
Brand ABB
Origin SWEDEN
Weight 0.5 kg
Shipping Dimensions 20.3 x 5.1 x 35.6 cm
Operating Temp -25 to +70 deg C
Storage Temp -40 to +85 deg C
Humidity 5-95% RH non-condensing
Power Consumption Passive unit (N/A)
Rated Current 5 A
Contact Resistance < 5 mOhm
Insulation Resistance > 100 MOhm at 500 V DC
Harmonized Tariff Code 8537101190

Deterministic Backplane Communications and Signal Integrity

The ITCTU11 ensures optimized signal transmission paths without degrading backplane bus communication velocity across connected Infi 90 processing modules. High insulation resistance (> 100 MOhm at 500 V DC) paired with contact resistance under 5 mOhm guarantees accurate signal pass-through for high-density I/O configurations while isolating internal control logic from external transients.

Order Fulfillment Details

  • 1 x ABB ITCTU11 Termination Unit Assembly

  • 2 x Panel Mounting Brackets

Assembly Installation Procedures

  • DIN Rail Mounting: Secure the termination unit firmly onto standard mounting rails, verifying mechanical latch engagement.

  • Shield Grounding: Connect instrument cable drain wires directly to the main cabinet protective earth bar to optimize noise suppression.

  • Wiring Clearance: Maintain a minimum 100 mm separation between low-voltage field signal wiring and 230 VAC / 480 VAC power lines.

  • Terminal Screw Tightening: Fasten field wire terminal screws to 0.5 Nm maximum torque to ensure low contact resistance without stripping threads.

Frequently Asked Questions

  • What causes high channel resistance values on the ITCTU11 termination unit?

    Corrosion or loose screw connections on field terminals increase contact resistance beyond 5 mOhm, leading to signal drop errors.

  • Can I hot-swap I/O cable harnesses connected to the ITCTU11?

    Disconnecting cable harnesses while connected I/O loops are active drops live process feedback and can trigger system alarm faults.

  • What insulation test parameters apply to the terminal track?

    The termination assembly insulation resistance must measure greater than 100 MOhm when tested at 500 V DC continuous.

  • How does extreme temperature exposure impact signal transmission?

    Exceeding the -25 to +70 deg C operating threshold causes thermal expansion across contacts, increasing resistance above the < 5 mOhm limit.

  • What current rating limits apply to individual terminal blocks?

    Each termination path on the ITCTU11 is engineered to handle up to 5 A continuous current without thermal degradation.

  • Does the ITCTU11 require an independent DC power supply connection?

    No, the unit functions as a passive field signal landing block and requires no external auxiliary power inputs to operate.

  • How does high ambient humidity affect internal track isolation?

    Operation within 5-95% non-condensing RH is standard; moisture condensation lowers insulation resistance below the 100 MOhm threshold.

  • What wire size range fits into the screw termination points?

    The screw compression terminal blocks accept field wiring ranging from 14 AWG down to 24 AWG solid or stranded copper conductors.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

SUPCON Showcases Industrial AI and Autonomous Operating Plant Solutions at OGA 2026
Sep 16, 2026
MaxWell
SUPCON Showcases Industrial AI and Autonomous Operating Plant Solutions at OGA 2026
SUPCON Technology showcased its comprehensive industrial AI and autonomous operating plant solutions at the Oil...
Read More
ADNOC Deploys Taurob Heavy-Duty Inspection Robot at Tawila Gas Compression Plant
Sep 16, 2026
MaxWell
ADNOC Deploys Taurob Heavy-Duty Inspection Robot at Tawila Gas Compression Plant
Abu Dhabi National Oil Company has successfully deployed a Taurob heavy-duty inspection robot at the...
Read More
Honeywell Technologies Innovation Summit Brings AI and Autonomous Operations to Guiyang
Sep 16, 2026
MaxWell
Honeywell Technologies Innovation Summit Brings AI and Autonomous Operations to Guiyang
Honeywell Technologies convened industry leaders, technical experts, and ecosystem partners at the 2026 Honeywell Technologies...
Read More
US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
Sep 15, 2026
MaxWell
US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
The U.S. Energy Information Administration forecasts that the United States will add a record 86...
Read More
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
Sep 15, 2026
MaxWell
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
WindEurope expects Europe to install 151 gigawatts of new wind power capacity over the 2026-2030...
Read More
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
Sep 15, 2026
Shopify API
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
India has achieved a significant renewable energy milestone, reaching 150 gigawatts of installed solar capacity...
Read More
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
Sep 14, 2026
Shopify API
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
The German government has approved plans to reform offshore wind auction processes, according to Windpower...
Read More
Masdar and ScottishPower Advance East Anglia Three 1.4 GW Offshore Wind Project
Sep 14, 2026
Shopify API
Masdar and ScottishPower Advance East Anglia Three 1.4 GW Offshore Wind Project
Masdar and ScottishPower Renewables have announced significant progress on the East Anglia Three offshore wind...
Read More
China Develops World's Largest 50MW Floating Wind Turbine Prototype
Sep 14, 2026
Shopify API
China Develops World's Largest 50MW Floating Wind Turbine Prototype
China is developing what is planned to become the world's largest floating wind turbine with...
Read More
Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
Sep 13, 2026
MaxWell
Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
The oil and gas industry is accelerating adoption of predictive maintenance strategies, with over 60%...
Read More