IPECB13 ABB Bailey Infi 90 Power Entry Circuit Breaker
ABB

IPECB13 ABB Bailey Infi 90 Power Entry Circuit Breaker

SKU: IPECB13
Categories : ABB
In Stock
  • Dimensions: 22.5 x 12.5 x 16.5 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB IPECB13, also cataloged as the IPECB13 Power Entry Circuit Breaker, operates as a dedicated hardware component for branch power isolation and overcurrent interruption within Bailey Infi 90 power distribution assemblies. The breaker unit manages DC and AC input protection through mechanically actuated thermal-magnetic interruption circuitry connected to industrial control cabinet power entry sections.

Product Configuration

The IPECB13 is supplied as a fixed power protection assembly for ABB Bailey Infi 90 systems. Available technical data does not define configurable suffix-dependent hardware options or alternate catalog matrix structures.

Electrical and Mechanical Specifications

Parameter Specification
Model IPECB13
Brand ABB
Product Type Power Entry Circuit Breaker
Series Bailey Infi 90
Origin Sweden
Manufacturer ABB
Rated Voltage 125 VDC / 240 VAC
Current Rating 10 A, 13 A, 16 A
Breaking Capacity 4.5 kA to 10 kA
Number of Poles 1P or 2P
Operating Temp -25 to +70 deg C
Storage Temp -40 to +85 deg C
Humidity 5-95 % RH non-condensing
Weight 2.25 kg
Shipping Dimensions 22.5 x 12.5 x 16.5 cm
Place of Shipment Xiamen, China
Tariff Code 8537101190
Power Consumption Passive protection device without continuous power draw

Power Distribution and Protection Characteristics

The IPECB13 breaker assembly provides branch-level interruption protection for industrial control power distribution sections within ABB Infi 90 infrastructure. Thermal and magnetic trip mechanisms respond to sustained overload and instantaneous fault current conditions.

Mechanical contact interruption timing is dependent on breaker loading conditions and applied fault current magnitude. During installation, conductor termination torque and bus connection alignment should be verified to minimize resistive heating at connection points.

The breaker structure supports integration into deterministic industrial control power systems where cabinet-level isolation and branch segmentation are required for distributed module protection.

Technical Questions

Q: Does the IPECB13 support both AC and DC applications?
A: The available technical data specifies operation at 125 VDC and 240 VAC system voltage conditions.

Q: What trip current ratings are available for the breaker?
A: Documented current ratings include 10 A, 13 A, and 16 A configurations.

Q: What is the purpose of the breaking capacity specification?
A: The breaking capacity defines the maximum fault current the breaker can interrupt without structural damage to the interruption mechanism.

Q: Can the breaker be installed in single-pole and dual-pole configurations?
A: Yes. The documented hardware supports 1P and 2P pole arrangements depending on installation requirements.

Q: What installation factor most affects long-term contact stability?
A: Improper conductor torque, loose bus termination hardware, and thermal cycling may increase connection resistance and localized heating.


Installation and Wiring Guidelines

  • Verify complete de-energization of incoming power conductors before installation or servicing.

  • Maintain proper cabinet grounding continuity prior to energizing protected circuits.

  • Tighten terminal connections according to approved industrial electrical practices.

  • Separate control wiring from high-current feeder conductors where possible.

  • Inspect breaker terminals and bus interfaces for oxidation or mechanical damage before installation.

  • Maintain enclosure airflow conditions within specified operating temperature limits.

  • Use anti-static handling precautions when working near adjacent control electronics.

Included Shipment Contents

  • IPECB13 Power Entry Circuit Breaker

  • Industrial anti-static protective packaging

  • Standard transport protection materials

Optional associated hardware may include:

  • Power distribution chassis

  • Bus connection accessories

  • Mounting hardware kits

Packaging and Transport Information

Delivery time: 2-7 days when payment finish. Shipment available through DHL, FedEx, and UPS international industrial transport services.

The breaker assembly is packed using reinforced anti-static industrial packaging with internal cushioning to reduce mechanical stress during export handling and warehouse movement.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Oct 19, 2026
Maxwell
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Water utilities around the world are discovering that the same programmable logic controllers that run...
Read More
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
Oct 19, 2026
Maxwell
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
A conveyor belt spanning a hundred kilometers does not fail politely. In iron-ore logistics, the...
Read More
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
Oct 18, 2026
Maxwell
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
On September 28, 2026, a robotics company in Yichang, Hubei Province unveiled what it claims...
Read More
Ondas Cyberhawk Secures Multi-Year Drone Inspection Contract with SSE plc
Oct 18, 2026
Maxwell
Ondas Cyberhawk Secures Multi-Year Drone Inspection Contract with SSE plc
drone-based infrastructure inspection has moved from experimental pilot projects to long-term service agreements, signaling a...
Read More
IFR World Robotics Report 2026 China Installs 354000 Industrial Robots
Oct 18, 2026
Maxwell
IFR World Robotics Report 2026 China Installs 354000 Industrial Robots
The International Federation of robotics released its 2026 World Robotics Report on September 24, and...
Read More
Subsea Pipeline Integrity Monitoring Systems Advance in North Sea
Oct 17, 2026
Maxwell
Subsea Pipeline Integrity Monitoring Systems Advance in North Sea
Subsea pipeline integrity monitoring has entered a new era with the deployment of autonomous systems...
Read More