INIET800 ABB Communication Module Symphony Plus
ABB

INIET800 ABB Communication Module Symphony Plus

SKU: INIET800
Categories : ABB
In Stock
  • Dimensions: 5.1 x 17.8 x 33.0 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB INIET800, also cataloged as the INIET800 Communication Module, operates as a dedicated hardware component for Ethernet CIU transfer processing within Symphony Plus and Infi 90 networks.

Hardware Specifications

Parameter Specification
Model INIET800 (Replaced by SPIET800)
Brand ABB
Origin SWEDEN
Weight 0.3 kg
Shipping Dimensions 5.1 cm x 17.8 cm x 33.0 cm
Operating Temp 0 to +70 deg C
Relative Humidity 20% to 95%, 0 deg C to 55 deg C (noncondensing)
Power Consumption 10 W maximum (Typical: 1.05 A @ +5 VDC)
Voltage Input +5 VDC (2 A maximum rating)
Onboard Memory 4 Mbytes ROM; 64 Mbytes RAM; 2 Mbytes NVRAM
Communication Ports

1x 10/100 Mbps Ethernet TCP/IP (CH 0)


2x RS-232 Serial (19.2, 38.4, 57.6, or 115.2 Kbps)

Backplane Bus Communication Velocity and Deterministic Networking

The INIET800 bridges high-level Ethernet TCP/IP structures with the inner deterministic processing layers of the rack assembly. By maintaining a synchronous backplane bus communication velocity, the module transfers operational parameters across high-density I/O configurations without cycle time extension. Onboard memory configurations, including 64 Mbytes RAM and 2 Mbytes non-volatile RAM (NVRAM), provide steady firmware flash compatibility parameters across legacy Infi 90 hardware revisions and contemporary Symphony Plus applications, supporting steady I/O density scaling during continuous processing cycles.

Technical Performance FAQ

Q: What is the direct backplane current demand for the INIET800 on the logic plane?

A: The module exhibits a typical current draw of 1.05 A from the +5 VDC backplane rail, peaking up to a maximum allocation of 2 A under full port loading.

Q: Can this communication module be extracted from the slot while the rack is live?

A: No, hot-swapping the INIET800 module while the backplane is energized can cause communication packets on the data bus to corrupt and may result in memory lockups within the NVRAM sector.

Q: How do the serial ports adjust their transmission rates?

A: The two RS-232 serial interfaces feature variable step selection configured through onboard hardware options or system software parameters, supporting standard rates from 19.2 Kbps up to 115.2 Kbps.

Field Installation Guidelines

  • Slot Alignment: Insert the module vertically into the chassis tracking slots, applying linear pressure until the rear pin socket locks completely into the backplane power and data grid.

  • Network Shield Integrity: Ground all external Ethernet cable shielding at the entry point of the distribution cabinet to maintain optical and electrical data isolation parameters.

  • Fastener Torque: Tighten the front faceplate thumb screws to establish a constant metal-to-metal chassis earth bond and prevent physical displacement from localized vibration.

  • Thermal Boundaries: Maintain open airflow channels above and below the module housing to prevent component deterioration when running at the +70 deg C operating threshold.

Packaging Assembly Checklist

  • 1 x ABB INIET800 Communication Module

  • 1 x Protective Faceplate Shield

Logistics and Dispatch Standards

Delivery time: 2-7 days when payment finish, routed via specialized international express lines including DHL, FEDEX, and UPS. All units are shipped inside calibrated anti-static industrial packaging matrices designed to insulate the logic processors and memory chips from static buildup and mechanical transit impacts.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Autonomous Operations in Process Manufacturing: Reality vs Industry Hype
Sep 05, 2026
MaxWell
Autonomous Operations in Process Manufacturing: Reality vs Industry Hype
The industrial manufacturing landscape is witnessing a growing divide between discrete assembly operations and complex...
Read More
Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Sep 04, 2026
MaxWell
Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Germany’s manufacturing framework is undergoing a structural pivot, balancing macroeconomic stagnation with targeted, high-capital deployments...
Read More
Emerson Unveils DeltaV v16.LTS DCS Architecture
Sep 04, 2026
MaxWell
Emerson Unveils DeltaV v16.LTS DCS Architecture
Modern industrial operations face mounting pressure to modernize their automation infrastructure while controlling lifecycle expenditures...
Read More
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Sep 04, 2026
MaxWell
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Industrial facilities are rapidly evolving into the primary engines of data generation across global enterprise...
Read More
Industrial AI Scaling Depends on OT Data Readiness
Sep 03, 2026
MaxWell
Industrial AI Scaling Depends on OT Data Readiness
Industrial companies have invested heavily in automation, control systems, historians, manufacturing software and enterprise platforms...
Read More
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Sep 03, 2026
Shopify API
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Few engineering achievements capture the imagination quite like Shell Prelude. Moored approximately 475 kilometers off...
Read More
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
Sep 03, 2026
Shopify API
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
In the high-stakes world of offshore and onshore gas production, few projects carry the geopolitical...
Read More
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
Sep 03, 2026
Shopify API
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
The industrial automation landscape is shifting rapidly as manufacturers demand greater flexibility from their control...
Read More
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Sep 03, 2026
MaxWell
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Critical Manufacturing is preparing to demonstrate how manufacturers can use MES, industrial connectivity, manufacturing analytics and...
Read More
Automation Can Create a Hidden Single-Point-of-Failure Risk
Sep 03, 2026
MaxWell
Automation Can Create a Hidden Single-Point-of-Failure Risk
As factories become more automated, the biggest operational risk may not always be a failed...
Read More