IMRIO22 ABB Remote Rack I/O Module Bailey
IMRIO22 ABB Remote Rack I/O Module Bailey
ABB

IMRIO22 ABB Remote Rack I/O Module Bailey

SKU: IMRIO22
Categories : ABB
In Stock
  • Dimensions: 3.8 x 17.8 x 30.5 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for distributed process data acquisition in industrial networks, the ABB IMRIO22, also cataloged as the IMRIO22 Remote Rack I/O Module, operates as a dedicated hardware component for bridging field input/output channels with centralized control node architecture.

Module Identification & Part Matrix

Component Level Identifier Technical Specification
Brand ABB Manufacturer entity
Model IMRIO22 Bailey INFI 90 Harmony remote I/O module
Function Remote I/O Distributed signal interface controller
Architecture INFI 90 / Harmony Plant-wide control network integration

Hardware Specifications

Parameter Specification
Model IMRIO22
Brand ABB
Origin SWEDEN
Weight 0.2 kg
Shipping Dimensions 3.8 cm x 17.8 cm x 30.5 cm
Operating Temp -40 deg C to +70 deg C
Power Consumption 10 – 20 W
Supply Voltage 24 V DC
Storage Temperature -40 deg C to +85 deg C
Humidity 5 – 95% RH non-condensing

Backplane Communication & I/O Density Scaling

The hardware utilizes backplane bus communication velocity licences to manage deterministic packet transfers across distributed remote racks. I/O density scaling capabilities allow operators to expand channel capacity incrementally without degrading bus update rates. Firmware flash compatibility ensures that low-level network protocol stacks remain synchronized with central node controller revisions, minimizing command execution latency during high-speed process loops.

Package Contents & Ordering Info

  • 1 x ABB IMRIO22 Remote Rack I/O Module (Part Number: IMRIO22)
  • 1 x Front Faceplate Extraction Handle Assembly
  • 1 x Technical Compliance and Installation Documentation Leaflet

Physical Mounting & Electrical Grounding Guidelines

  • Insert the module smoothly into the designated rack slot, ensuring the backplane connector aligns without bending pins.
  • Secure the top and bottom captive retention screws to maintain mechanical stability against continuous industrial vibration.
  • Connect the chassis earth grounding lug directly to the cabinet ground bar using low-impedance copper strapping.
  • Keep incoming field signal wiring segregated from high-voltage power conduits to prevent electromagnetic induction.

Frequently Asked Questions

  • Q: What is the primary operational function of this module within the control network?
  • A: It acts as a remote interface node to collect and transfer field I/O data back to the central controller.
  • Q: Does this hardware support online hot-swapping during active plant operations?
  • A: Hot-swap capability depends on backplane power partitioning and rack bus configuration limits specified by system design.
  • Q: What power supply voltage is required to operate the module?
  • A: The unit operates using an external 24 VDC power supply rail distributed through the rack infrastructure.
  • Q: What is the operational power consumption range under full load?
  • A: The module consumes between 10 W and 20 W of electrical power depending on active channel states.
  • Q: What environmental temperature range is permitted for continuous deployment?
  • A: The hardware functions reliably within an ambient operating temperature range of -40 deg C to +70 deg C.
  • Q: How does firmware management affect network communication stability?
  • A: Firmware flash compatibility ensures uniform protocol processing and prevents timing mismatches on the bus.
  • Q: Why must the chassis ground lug be connected to the cabinet bar?
  • A: Proper grounding shunts high-frequency electromagnetic noise away from sensitive internal processing circuits.
  • Q: How should the module be handled during routine maintenance to prevent electrostatic damage?
  • A: Technicians must wear a grounded wrist strap and handle the printed circuit board strictly by its non-conductive edges.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

European Wind Energy Installations Surge 30% in First Half of 2026
Sep 17, 2026
MaxWell
European Wind Energy Installations Surge 30% in First Half of 2026
WindEurope reports that European wind energy installations surged 30 percent in the first half of...
Read More
Siemens and NVIDIA Build Industrial AI Operating System for Manufacturing and Semiconductor Design
Sep 17, 2026
MaxWell
Siemens and NVIDIA Build Industrial AI Operating System for Manufacturing and Semiconductor Design
Siemens and NVIDIA are collaborating to build what they describe as an industrial artificial intelligence...
Read More
Dongfang Electric Installs World's Largest 26MW Offshore Wind Turbine in China
Sep 17, 2026
MaxWell
Dongfang Electric Installs World's Largest 26MW Offshore Wind Turbine in China
Dongfang Electric Corporation has successfully completed the installation of what is described as the world's...
Read More
SUPCON Showcases Industrial AI and Autonomous Operating Plant Solutions at OGA 2026
Sep 16, 2026
MaxWell
SUPCON Showcases Industrial AI and Autonomous Operating Plant Solutions at OGA 2026
SUPCON Technology showcased its comprehensive industrial AI and autonomous operating plant solutions at the Oil...
Read More
ADNOC Deploys Taurob Heavy-Duty Inspection Robot at Tawila Gas Compression Plant
Sep 16, 2026
MaxWell
ADNOC Deploys Taurob Heavy-Duty Inspection Robot at Tawila Gas Compression Plant
Abu Dhabi National Oil Company has successfully deployed a Taurob heavy-duty inspection robot at the...
Read More
Honeywell Technologies Innovation Summit Brings AI and Autonomous Operations to Guiyang
Sep 16, 2026
MaxWell
Honeywell Technologies Innovation Summit Brings AI and Autonomous Operations to Guiyang
Honeywell Technologies convened industry leaders, technical experts, and ecosystem partners at the 2026 Honeywell Technologies...
Read More
US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
Sep 15, 2026
MaxWell
US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
The U.S. Energy Information Administration forecasts that the United States will add a record 86...
Read More
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
Sep 15, 2026
MaxWell
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
WindEurope expects Europe to install 151 gigawatts of new wind power capacity over the 2026-2030...
Read More
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
Sep 15, 2026
Shopify API
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
India has achieved a significant renewable energy milestone, reaching 150 gigawatts of installed solar capacity...
Read More
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
Sep 14, 2026
Shopify API
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
The German government has approved plans to reform offshore wind auction processes, according to Windpower...
Read More