ICSI08E1-230 FPR3316101R0016 ABB Procontic CS31 Binary Input Unit
ABB

ICSI08E1-230 FPR3316101R0016 ABB Procontic CS31 Binary Input Unit

SKU: ICSI08E1-230
Categories : ABB
In Stock
  • Dimensions: 12 x 9.3 x 6.2 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for discrete state signal processing in distributed control architectures, the ABB ICSI08E1-230 FPR3316101R0016 (ICSI08E1-230 Binary Input Unit- CS 31) provides direct physical/electrical execution.

Part Number Breakdown & Identification

  • Base Model Designation: ICSI08E1
  • Suffix Variant: -230
  • Factory Part Number: FPR3316101R0016
  • Hardware Classification: Binary Input Unit
  • Series Architecture: ABB Procontic CS31

Hardware Specifications

Parameter Specification
Model ICSI08E1-230
Brand ABB
Part Number FPR3316101R0016
Origin Verify via Factory Label
Weight 0.44 kg
Shipping Dimensions 12 x 9.3 x 6.2 cm
Operating Temp 0 deg C to 55 deg C
Power Consumption Standard internal bus load limits
Core Function Multi-channel discrete binary signal acquisition
Network Protocol CS31 bus communication standard

Backplane Bus Communication and Firmware Integration

The unit interfaces directly with the CS31 system bus topology, utilizing deterministic token-passing communication protocols to transmit discrete acquisition data to the central processing unit. Firmware flash compatibility requires specific revision levels on the main controller to correctly map the binary input registers into system memory. I/O density scaling relies on backplane current distribution, requiring external power considerations if cumulative loop loads exceed designated bus thresholds. Flash memory constraints mandate verified checksum matching during firmware deployment sequences to prevent configuration corruption.

Ordering Information

  • 1 x ICSI08E1-230 Binary Input Unit Module
  • 1 x Factory Inspection Document
  • 1 x ESD Protection Packaging Enclosure

Physical Setup and Grounding Protocol

  • DIN-Rail Mounting: Secure the module horizontally onto a standard 35 mm DIN rail inside the control cabinet, ensuring proper mechanical locking latches engage fully.
  • Shielding and Grounding: Terminate all field signal cable shields at the designated cabinet grounding bar using low-impedance metal clamps to minimize electromagnetic interference.
  • Terminal Block Seating: Verify that pluggable screw terminals are fully inserted and torqued to manufacturer specifications to prevent intermittent connection failures under vibration.
  • Thermal Clearance: Maintain a minimum vertical clearance of 50 mm above and below the housing to facilitate natural convection cooling.

Frequently Asked Questions

  • Does this input unit support live hot-swapping under power?

    No, removing or inserting the module while the system rack is powered can cause bus communication faults or permanent hardware damage.

  • What type of signals does this binary unit process?

    The module processes discrete binary state signals and contact closures from industrial field devices.

  • How are input channels protected against voltage spikes?

    Internal transient voltage suppression diodes safeguard each channel against standard industrial electromagnetic disturbances.

  • Are firmware updates mandatory when replacing this unit?

    Firmware updates are generally unnecessary unless upgrading the main rack control processor or system software architecture.

  • What causes an input configuration mismatch on the CPU?

    Mismatches occur when the physical hardware revision differs from the hardware configuration loaded in the programming software project.

  • Is calibration required upon initial installation?

    Factory calibration is pre-set for digital switching thresholds, but verification via the programming software tool is recommended during commissioning.

  • What is the maximum wire gauge accepted by the terminals?

    The screw terminals accept solid or stranded copper conductors up to standard industrial cross-section limits.

  • How does the system indicate hardware operational status?

    Front-panel diagnostic light-emitting diodes display power, bus communication health, and individual channel state errors.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More