Honeywell MU-T Series MU-KBFT02 80366198-200 HPM FTA Cable Bridge
Honeywell MU-T Series MU-KBFT02 80366198-200 HPM FTA Cable Bridge
Honeywell MU-T Series MU-KBFT02 80366198-200 HPM FTA Cable Bridge
Honeywell

Honeywell MU-T Series MU-KBFT02 80366198-200 HPM FTA Cable Bridge

SKU: 80366198-200
Categories : All Products
In Stock
  • Dimensions: 26 cm x 26 cm x 3 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Honeywell MU-KBFT02 80366198-200 is an HPM Field Termination Assembly cable bridge designed to provide reliable interconnection between HPM controllers and associated FTA hardware within Honeywell distributed control systems. As part of the MU-T Series, this cable bridge ensures stable signal routing and mechanical integrity in control cabinets used for industrial process automation.

Engineered for fixed installation in DCS environments, the MU-KBFT02 supports orderly wiring layouts and secure electrical continuity between system components, contributing to long-term system stability and ease of maintenance.

Key Technical Characteristics

  • Model: MU-KBFT02

  • Order Number: 80366198-200

  • Product Type: HPM FTA Cable Bridge

  • Series: MU-T Series

  • Function: Signal and connection bridging between HPM and FTA assemblies

  • Installation Type: Panel-mounted control cabinet component

  • Construction: Industrial-grade insulated assembly

  • Weight: Approx. 0.38 kg

  • Dimensions: 26 × 26 × 3 cm

  • Country of Origin: USA

  • Product Status: Active

Industrial Applications

The MU-KBFT02 80366198-200 cable bridge is used in Honeywell DCS installations where HPM controllers interface with field termination assemblies. Typical applications include oil and gas processing, chemical production, power generation, and large-scale manufacturing plants.

By maintaining consistent electrical connections and organized wiring paths, this component supports reliable signal transmission, reduces installation complexity, and improves serviceability during commissioning and system upgrades.

 

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Sep 04, 2026
MaxWell
Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Germany’s manufacturing framework is undergoing a structural pivot, balancing macroeconomic stagnation with targeted, high-capital deployments...
Read More
Emerson Unveils DeltaV v16.LTS DCS Architecture
Sep 04, 2026
MaxWell
Emerson Unveils DeltaV v16.LTS DCS Architecture
Modern industrial operations face mounting pressure to modernize their automation infrastructure while controlling lifecycle expenditures...
Read More
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Sep 04, 2026
MaxWell
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Industrial facilities are rapidly evolving into the primary engines of data generation across global enterprise...
Read More
Industrial AI Scaling Depends on OT Data Readiness
Sep 03, 2026
MaxWell
Industrial AI Scaling Depends on OT Data Readiness
Industrial companies have invested heavily in automation, control systems, historians, manufacturing software and enterprise platforms...
Read More
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Sep 03, 2026
Shopify API
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Few engineering achievements capture the imagination quite like Shell Prelude. Moored approximately 475 kilometers off...
Read More
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
Sep 03, 2026
Shopify API
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
In the high-stakes world of offshore and onshore gas production, few projects carry the geopolitical...
Read More
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
Sep 03, 2026
Shopify API
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
The industrial automation landscape is shifting rapidly as manufacturers demand greater flexibility from their control...
Read More
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Sep 03, 2026
MaxWell
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Critical Manufacturing is preparing to demonstrate how manufacturers can use MES, industrial connectivity, manufacturing analytics and...
Read More
Automation Can Create a Hidden Single-Point-of-Failure Risk
Sep 03, 2026
MaxWell
Automation Can Create a Hidden Single-Point-of-Failure Risk
As factories become more automated, the biggest operational risk may not always be a failed...
Read More
Water Utilities Face Growing Cybersecurity Pressure as OT Risks Rise
Sep 02, 2026
MaxWell
Water Utilities Face Growing Cybersecurity Pressure as OT Risks Rise
The cybersecurity of water and wastewater infrastructure is drawing renewed attention across the industrial automation...
Read More