Honeywell 51202330-300 I/O Link Coaxial Cable Assembly
Honeywell 51202330-300 I/O Link Coaxial Cable Assembly
Honeywell 51202330-300 I/O Link Coaxial Cable Assembly
Honeywell

Honeywell 51202330-300 I/O Link Coaxial Cable Assembly

SKU: 51202330-300
Categories : All Products
In Stock
  • Dimensions: 280 mm x 280 mm x 60 mm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen

Request a quote

1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Honeywell 51202330-300 I/O Link Cable Assembly establishes high-speed, fault-tolerant data pathways within advanced Honeywell Experion PKS environments. Plant automation engineers install this heavy-duty communication interconnect to bridge C300 controllers, I/O Link Modules (IOLM), and highly distributed field termination assemblies. By maintaining exact characteristic impedance and providing a completely deterministic data path, the cable layout eliminates transmission reflections and preserves microsecond-level synchronization across adjacent cabinet tiers. This premium bus component secures vital process automation loops in aggressive industrial sectors, including high-capacity oil refineries, offshore gas separation units, and multi-stage power generation centers. The 51202330-300 isolates critical control backplane traffic from crushing electromagnetic field transients, keeping emergency shutdown systems responsive and protecting processing plants from unplanned outages.

Architecture and Physical Bus Hardening

The 51202330-300 utilizes a high-grade coaxial architecture specifically tailored to support continuous, high-frequency serial transmissions without data packets skewing or losing amplitude. The central copper conductor features a high-purity composition to minimize electrical attenuation, paired with a low-density fluorinated ethylene propylene (FEP) dielectric core that keeps capacitance extremely stable over varying thermal shifts.

To achieve complete isolation against severe radio frequency interference (RFI) and magnetic fields generated by heavy-duty switchgear, Honeywell implements a multi-layered shielding network. A continuous foil wrap and an ultra-dense tinned copper braid work together to divert electrostatic noise straight to chassis ground. The outer protective jacket comprises an industrial-grade, flame-retardant compound that prevents mechanical tearing, resists oil-based chemical degradation, and stands up to long-term exposure inside unventilated marshalling panels.

Hardware Configuration and Electrical Benchmarks

Mechanical Properties

Structural Parameter Certified Engineering Value
Manufacturer Honeywell
Model Identifier 51202330-300
Country of Origin United States
Harmonized System (HS) Code 85444290
Physical Weight 0.52 kg (1.15 lbs)
Shipping Dimensions 280 mm x 280 mm x 60 mm

Technical Capabilities

Operational Parameter Performance Rating
Cable Assembly Architecture Pre-terminated High-Speed I/O Link Cable
Total Cable Physical Length 3.0 Meters (Approx. 9.8 Feet)
Signaling Topology High-Frequency Deterministic Serial Link Bus
Insulation Resistance 1200 Megohms / km Minimum
Operating Temperature Range -40°C to +85°C (-40°F to 185°F)
Enclosure Ingress Protection IP20 Rated Chemical Resistant Outer Jacket

Field Routing and Mechanical Management

Lay the 51202330-300 link cable assembly carefully into dedicated low-voltage wiring ducts inside the DCS cabinet, ensuring it bypasses heavy three-phase AC motor starters and variable frequency drive (VFD) output runs. Maintain a strict minimum dynamic cable bend radius of 75mm during routing to protect the internal FEP dielectric core from deformation and prevent data impedance mismatches.

Align the factory-terminated physical connectors squarely with the matching ports on the C300 controller base or I/O module before pushing the connector pins into place. Hand-tighten the integrated mechanical retention hardware to build a secure, vibration-proof connection and complete the automated shield grounding loop through the module chassis frame. Do not apply excessive force or use uncalibrated tools on the locking mechanisms, as excess tension can warp the internal pins and disrupt backplane data.

Process Resilience and Experion PKS Integration

The 51202330-300 system exhibits superior field survivability, handling continuous industrial vibrations and environmental thermal spikes without dropping active control loops. The non-porous outer insulation blocks moisture condensation and airborne sulfur compounds from infiltrating the copper cores, preventing micro-corrosion in harsh chemical environments.

This communication bridge drops natively into standard Honeywell Series C I/O configurations, allowing fast plug-and-play expansions of local or remote I/O slots. The high-integrity shielding preserves clear, noise-free diagnostic pipelines, allowing the primary Experion software platform to extract multi-variable instrumentation variables and valve health metrics without data dropouts.

Fulfillment Matrix and Ordering Data

Your high-speed process network hardware undergoes full factory continuity validation and insulation breakdown testing prior to international shipment. Your box contains:

(1) New Original Honeywell 51202330-300 3-Meter I/O Link Cable

(2) Pre-installed Dual Mechanical Locking Fasteners

(3) Factory Continuity and Shield Integrity Compliance Certificate

(4) Removable Terminal Connection Dust Protection Caps

Global Distribution and Packing Integrity

We process international express dispatch within 2-7 days when payment finish, coordinating secure air delivery via world-class couriers including DHL, FEDEX, and UPS. Technicians enclose each pre-terminated cable assembly within specialized anti-static industrial packaging sleeves to block static charges during air transit. The item is packed in rigid outer boxes lined with custom-molded, shock-absorbent foam inserts, ensuring your essential communication hardware arrives clean, dry, and ready for immediate deployment on the plant floor.

System Interconnect Technical FAQs

Q1: What structural specification does the "-300" identifier determine for this Honeywell cable model?

A1: The -300 suffix dictates the exact factory-measured length and termination layout of the assembly. This specific variant delivers an exact 3.0-meter physical length (approximately 9.8 feet), making it optimal for linking stacked I/O modules or bridging redundant controller slots within a single standard panel enclosure.

Q2: Can field technicians trim excess length off this cable or use field-applied connectors to adjust it?

A2: No. This high-speed I/O link cable relies on precise factory calibration of its internal capacitance, resistance, and shielding parameters. Cutting, splicing, or installing third-party connectors alters this delicate electrical balance, leading to signal reflections, CRC packet errors, and sudden module dropouts.

Q3: How does the cable handle shield grounding when connected to a C300 controller slot?

A3: The pre-terminated connectors feature an integrated metallic grounding cuff that links the cable's internal foil and braid shields directly to the controller base plate upon installation. Tightening the retention fasteners completes a solid, low-impedance grounding path that filters out high-frequency EMI without needing separate ground wires.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB and Mettler Toledo Partner to Drive Robotic Automation in Laboratory Environments
Jun 05, 2026
MaxWell
ABB and Mettler Toledo Partner to Drive Robotic Automation in Laboratory Environments
Industrial technology leaderABBRobotics has signed a memorandum of understanding with Mettler Toledo to bridge collaborative...
Read More
Emerson Launches PACSystems IPC 2010 to Bridge Shop Floor Data with Cloud Networks
Jun 05, 2026
MaxWell
Emerson Launches PACSystems IPC 2010 to Bridge Shop Floor Data with Cloud Networks
Global engineering technology leaderEmersonhas introduced its PACSystems IPC 2010, a compact and rugged industrial computer...
Read More
KUKA Partners with Micropsi to Integrate MIRAI AI Vision Systems into Industrial Robotics
Jun 05, 2026
MaxWell
KUKA Partners with Micropsi to Integrate MIRAI AI Vision Systems into Industrial Robotics
Industrial robotics manufacturer KUKA has formed a strategic partnership with Micropsi Industries to offer the...
Read More
Banner Engineering Launches DXM1200 Industrial Wireless Gateways for Severe Environments
Jun 05, 2026
MaxWell
Banner Engineering Launches DXM1200 Industrial Wireless Gateways for Severe Environments
Industrial automation instrumentation manufacturer Banner Engineering has released its DXM1200-B2 and DXM1200-X2 wireless controller series,...
Read More
Idec Launches FT2J Series Combined 7-Inch HMI and Programmable Controller
Jun 05, 2026
MaxWell
Idec Launches FT2J Series Combined 7-Inch HMI and Programmable Controller
Global automation components manufacturer Idec has expanded its SmartAXIS Touch hardware family with the introduction...
Read More
Rockwell Automation Introduces Rugged ASEM 6300 Industrial PCs for FactoryTalk Optix Ecosystem
Jun 05, 2026
MaxWell
Rockwell Automation Introduces Rugged ASEM 6300 Industrial PCs for FactoryTalk Optix Ecosystem
Industrial automation leaderRockwell Automationhas expanded its visualization hardware portfolio with the launch of the ASEM...
Read More
Fanuc Invests $110M in Massive Michigan West Campus to Boost Robotics Logistics
Jun 04, 2026
MaxWell
Fanuc Invests $110M in Massive Michigan West Campus to Boost Robotics Logistics
Industrial automation giantFanuchas officially opened a new 650,000-square-foot West Campus facility in Auburn Hills, Michigan,...
Read More
Rockwell Automation Expands Armor Lineup to Accelerate On-Machine System Design
Jun 04, 2026
MaxWell
Rockwell Automation Expands Armor Lineup to Accelerate On-Machine System Design
To minimize panel footprints and accelerate deployment timelines for machine builders,Rockwell Automationhas expanded its ruggedized...
Read More
Schneider Electric Unveils Next-Gen IT/OT Integration Portfolio at SPS
Jun 04, 2026
MaxWell
Schneider Electric Unveils Next-Gen IT/OT Integration Portfolio at SPS
Global energy management and automation specialistSchneider Electrichas unveiled an expansive suite of industrial technology designed...
Read More
Schneider Electric Unveils Unified Ecosystem Strategy for Seamless Industrial IT-OT Convergence
Jun 04, 2026
MaxWell
Schneider Electric Unveils Unified Ecosystem Strategy for Seamless Industrial IT-OT Convergence
Schneider Electric presented a comprehensive showcase of its next-generation smart manufacturing portfolio, demonstrating how a...
Read More