Honeywell 51199932-200 51199932-200-RP C300 Controller Memory Backup Assembly
Honeywell 51199932-200 51199932-200-RP C300 Controller Memory Backup Assembly
Honeywell 51199932-200 51199932-200-RP C300 Controller Memory Backup Assembly
Honeywell

Honeywell 51199932-200 51199932-200-RP C300 Controller Memory Backup Assembly

SKU: 51199932-200-RP
Categories : All Products
In Stock
  • Dimensions: 15.2 cm x 8.4 cm x 3.8 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen

Request a quote

1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Honeywell 51199932-200 (also referenced as 51199932-200-RP) operates as the vital Memory Backup Assembly for the flagship Experion PKS C300 Controller environment. This specialized hardware sub-system provides dependable energy storage to preserve critical volatile memory registers, control strategies, and real-time database configurations during main power interruptions. It serves as an indispensable line of defense within high-availability DCS configurations across petrochemical plants, offshore platforms, and baseload utilities.

A sudden total loss of station power can wipe out non-synchronized runtime variables, leading to protracted, hazardous plant restarts. The 51199932-200 assembly safeguards against this catastrophe by instantly supplying continuous hold-up energy to the RAM cache. This deep security measure ensures that the C300 controller retains its complete functional state, execution parameters, and network identification properties, facilitating a rapid, seamless, and safe return to active process control when primary utility power stabilizes.

Backup Cell Architecture and Charge Supervision

This memory backup assembly utilizes premium-grade, high-capacity cell chemistry selected for prolonged energy retention and stable voltage output under continuous float-charge environments. The integrated charging circuit interfaces directly with the C300 controller backplane, managing optimal energy levels without taxing the main power supply.

Intelligent Health Diagnostics

The assembly communicates its internal operational status directly to the Experion PKS diagnostic subsystem. The onboard monitoring network continuously tracks cell degradation, impedance variations, and state-of-charge capacity, projecting maintenance timelines well before the backup integrity falls below safety thresholds.

Safe Hot-Swap Deployment

The mechanical and electrical interface allows on-line physical replacement while the system remains fully energized. A built-in isolation circuit prevents current spikes or voltage dips from destabilizing adjacent processing hardware during insertion, maintaining full system uptime during preventive maintenance windows.

Hardware Configuration and Physical Metrics

Industrial Attribute Engineering Specification
Manufacturer Honeywell
Model Identifier 51199932-200 / 51199932-200-RP
Primary System Role C300 Controller Volatile RAM Memory Backup
Cell Capacity Rating High-Yield Extended Hold-Up Time Specification
Net Weight 0.26 kg
Pack Dimensions 15.2 cm x 8.4 cm x 3.8 cm
Casing Construction Material High-Impact Polycarbonate Resin
Country of Origin USA
Harmonized HS Code 8507600090
Optimal Operating Temperature 0 to 50 Degrees Celsius
Permissible Storage Limits -20 to 45 Degrees Celsius
Protection Classification IP20

On-Site Deployment and Preventive Maintenance Guidelines

Slide the memory backup assembly firmly into its dedicated orientation slot on the C300 execution structure or mounting block, verifying that the polarized locking mechanism latches securely to prevent accidental physical disconnection from panel vibration.

Initial Activation Protocols

New assemblies ship in an isolated storage mode to prevent self-discharge over extended transit durations. Technicians must engage the physical activation tab or configure the system software switch during installation to initiate the continuous automated float-charging loop.

Electrostatic Discharge Isolation

As with all advanced Experion hardware, engineers must connect a verified grounding wrist strap to the cabinet frame before handling this assembly. Avoid touching the exposed electrical contact pads on the rear interface to eliminate the risk of ESD puncture to the internal monitoring chips.

Environmental Endurance and Experion Synergy

This backup hardware withstands continuous ambient cabinet temperatures up to 50 degrees Celsius without experiencing accelerated cell swelling or capacity loss. The ruggedized housing isolates the internal energy elements from trace industrial chemical vapors and high-frequency EMI fields found in modern heavy industrial switchrooms.

High-Availability System Cohesion

The module coordinates tightly with redundant C300 topologies, ensuring that both primary and secondary controllers maintain distinct, fully functional memory backup vectors. This dual-layered hardware preservation strategy satisfies the strict safety requirements of emergency shutdown systems and critical turbine supervisor instrumentation configurations.

Ordering info

The factory procurement kit includes the following verified industrial components:

(1) Brand New Honeywell 51199932-200 Memory Backup Assembly

(2) Factory Sealed Anti-Static Shielding Barrier Bag

(3) Engineering Installation and Maintenance Reference Leaflet

Shipping Protocols and Packaging Management

Delivery time: 2-7 days when payment finish. We route all critical automation components via premier international logistics operators including DHL, FEDEX, and UPS to secure rapid, tracked transit to global destinations. Due to the regulated energy storage elements inside this assembly, each package features certified, specialized anti-static industrial packaging and shock-damping filler materials to fully comply with international transit regulations.

Critical Backup Operations FAQ

Q1: What is the technical distinction between the 51199932-200 and the 51199932-200-RP part numbers?

A1: The base part number indicates the original equipment manufacture component, while the "-RP" suffix designates a certified Renewal Part kit. Both variations share identical technical specifications, dimensions, and electrical capacities, providing absolute cross-compatibility in all C300 installations.

Q2: How long can this assembly preserve the C300 controller memory during a total power blackout?

A2: Under nominal operating and environmental conditions, a fully charged assembly provides a minimum of 72 hours of continuous hold-up power to preserve the entire volatile RAM database of a standard C300 controller node.

Q3: How often do Honeywell engineering standards recommend replacing this memory backup module?

A3: To maintain peak asset reliability, plant guidelines recommend proactive replacement of the assembly every 3 to 5 years, depending on average cabinet operating temperatures, or immediately upon a persistent "Low Battery" warning state inside the Experion PKS diagnostic viewer.

Q4: Will removing an old backup module cause immediate memory loss if the controller is still running?

A4: No, if the C300 controller is currently receiving active 24V DC system power via its main power supply, you can safely hot-swap the backup assembly. The controller continues to run normally while relying on primary system power during the replacement procedure.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB and Mettler Toledo Partner to Drive Robotic Automation in Laboratory Environments
Jun 05, 2026
MaxWell
ABB and Mettler Toledo Partner to Drive Robotic Automation in Laboratory Environments
Industrial technology leaderABBRobotics has signed a memorandum of understanding with Mettler Toledo to bridge collaborative...
Read More
Emerson Launches PACSystems IPC 2010 to Bridge Shop Floor Data with Cloud Networks
Jun 05, 2026
MaxWell
Emerson Launches PACSystems IPC 2010 to Bridge Shop Floor Data with Cloud Networks
Global engineering technology leaderEmersonhas introduced its PACSystems IPC 2010, a compact and rugged industrial computer...
Read More
KUKA Partners with Micropsi to Integrate MIRAI AI Vision Systems into Industrial Robotics
Jun 05, 2026
MaxWell
KUKA Partners with Micropsi to Integrate MIRAI AI Vision Systems into Industrial Robotics
Industrial robotics manufacturer KUKA has formed a strategic partnership with Micropsi Industries to offer the...
Read More
Banner Engineering Launches DXM1200 Industrial Wireless Gateways for Severe Environments
Jun 05, 2026
MaxWell
Banner Engineering Launches DXM1200 Industrial Wireless Gateways for Severe Environments
Industrial automation instrumentation manufacturer Banner Engineering has released its DXM1200-B2 and DXM1200-X2 wireless controller series,...
Read More
Idec Launches FT2J Series Combined 7-Inch HMI and Programmable Controller
Jun 05, 2026
MaxWell
Idec Launches FT2J Series Combined 7-Inch HMI and Programmable Controller
Global automation components manufacturer Idec has expanded its SmartAXIS Touch hardware family with the introduction...
Read More
Rockwell Automation Introduces Rugged ASEM 6300 Industrial PCs for FactoryTalk Optix Ecosystem
Jun 05, 2026
MaxWell
Rockwell Automation Introduces Rugged ASEM 6300 Industrial PCs for FactoryTalk Optix Ecosystem
Industrial automation leaderRockwell Automationhas expanded its visualization hardware portfolio with the launch of the ASEM...
Read More
Fanuc Invests $110M in Massive Michigan West Campus to Boost Robotics Logistics
Jun 04, 2026
MaxWell
Fanuc Invests $110M in Massive Michigan West Campus to Boost Robotics Logistics
Industrial automation giantFanuchas officially opened a new 650,000-square-foot West Campus facility in Auburn Hills, Michigan,...
Read More
Rockwell Automation Expands Armor Lineup to Accelerate On-Machine System Design
Jun 04, 2026
MaxWell
Rockwell Automation Expands Armor Lineup to Accelerate On-Machine System Design
To minimize panel footprints and accelerate deployment timelines for machine builders,Rockwell Automationhas expanded its ruggedized...
Read More
Schneider Electric Unveils Next-Gen IT/OT Integration Portfolio at SPS
Jun 04, 2026
MaxWell
Schneider Electric Unveils Next-Gen IT/OT Integration Portfolio at SPS
Global energy management and automation specialistSchneider Electrichas unveiled an expansive suite of industrial technology designed...
Read More
Schneider Electric Unveils Unified Ecosystem Strategy for Seamless Industrial IT-OT Convergence
Jun 04, 2026
MaxWell
Schneider Electric Unveils Unified Ecosystem Strategy for Seamless Industrial IT-OT Convergence
Schneider Electric presented a comprehensive showcase of its next-generation smart manufacturing portfolio, demonstrating how a...
Read More