88FV01F GJR2332300R0100 ABB Master Station Modem Module Procontrol P14
88FV01F GJR2332300R0100 ABB Master Station Modem Module Procontrol P14
88FV01F GJR2332300R0100 ABB Master Station Modem Module Procontrol P14
ABB

88FV01F GJR2332300R0100 ABB Master Station Modem Module Procontrol P14

SKU: GJR2332300R0100
Categories : ABB
In Stock
  • Dimensions: 24 x 19 x 5.3cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for high-speed data transmission in Procontrol P14 networks, the ABB GJR2332300R0100 (88FV01F Master Station Modem Module) provides direct physical and electrical execution of FDDI token ring optical fiber communication.

Module Variant and Nomenclature

The 88FV01F designation corresponds to the Master Station Modem Module hardware assembly within the Procontrol P14 architecture. This unit handles signal modulation and conversion between electrical backplane signals and optical fiber physical layers for deterministic network operations.

Hardware Specifications

Parameter Specification
Model GJR2332300R0100 (88FV01F)
Brand ABB
Origin Sweden
Weight 1.22 kg
Shipping Dimensions 24.0 cm x 19.0 cm x 5.3 cm
Operating Temp Standard industrial ambient range
Power Consumption System-dependent
Communication FDDI Token Ring 100 Mbit/s

Network Determinism and Firmware Compatibility

The module manages network token circulation to ensure deterministic communication across the Procontrol P14 backplane bus. Firmware flash compatibility is strictly enforced to match the network master configuration; mismatching firmware versions will result in network initialization failure. The modem executes signal conversion at 100 Mbit/s, utilizing optical isolation to provide immunity against electromagnetic interference in high-noise environments. In the event of a fiber loop break, the module initiates a self-healing protocol, reconfiguring the ring topology to maintain communication between operational nodes without manual intervention.

Ordering Info

  • GJR2332300R0100 Master Station Modem Module

  • Optical fiber connector housing

  • Technical installation guide

Field Installation Guidelines

  • Ensure the module is inserted into the designated Procontrol P14 rack slot, ensuring proper engagement with the backplane bus.

  • Clean optical fiber termination surfaces using approved lint-free tools before connection.

  • Connect fiber-optic cables, ensuring the transmit (TX) and receive (RX) ports match the system cabling plan.

  • Verify network status indicators on the module front panel after power-on.

  • Inspect fiber paths for excessive bending radii, which may induce signal attenuation.

Frequently Asked Questions

  • Q: Can this module be hot-swapped while the network is active?

    A: No, module insertion or removal during active network token circulation may cause transient ring errors; follow system-specific shutdown procedures.

  • Q: What is the maximum fiber length supported?

    A: The module supports transmission up to 2,000 meters depending on fiber quality and attenuation per splice.

  • Q: How is network fault detection handled?

    A: The module detects link loss via the FDDI physical layer and triggers an automated network reconfiguration sequence.

  • Q: Is this module compatible with standard Ethernet (IEEE 802.3)?

    A: No, it utilizes the FDDI protocol over fiber and is not natively compatible with standard RJ45 Ethernet switches.

  • Q: How do I upgrade module firmware?

    A: Firmware upgrades are performed via the Procontrol P14 engineering workstation connected through the rack interface.

  • Q: What indicates a module failure?

    A: Failure is indicated by diagnostic LED patterns on the front panel and a "Network Not Ready" status reported to the controller.

  • Q: Are redundant fiber paths required?

    A: For self-healing topology, dual fiber loops are necessary to allow the module to reroute traffic during a single cable break.

  • Q: Does the module provide backplane power?

    A: No, it consumes power from the system rack backplane; ensure the rack power supply module is rated for the total installed load.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Rockwell Automation Faces New Industry Dynamics as AI, Open Architecture and Next-Generation PLC Platforms Reshape Automation
Aug 14, 2026
MaxWell
Rockwell Automation Faces New Industry Dynamics as AI, Open Architecture and Next-Generation PLC ...
Rockwell Automation’s long-established position in industrial control is facing new competitive pressures as the automation...
Read More
OMRON Introduces Next-Generation AMRs to Advance Smart Manufacturing Logistics
Aug 14, 2026
MaxWell
OMRON Introduces Next-Generation AMRs to Advance Smart Manufacturing Logistics
OMRON Robotics is preparing to showcase its latest generation of autonomous mobile robots (AMRs) at Automate...
Read More
Comau and Invent Highlight Smart Automation for Future Industrial Operations
Aug 13, 2026
MaxWell
Comau and Invent Highlight Smart Automation for Future Industrial Operations
Comau and Invent have presented their latest automation and intralogistics technologies at Brasil em Código...
Read More
More Than 4,400 Rockwell PLCs Found Exposed Online Amid Water Sector Cyber Risks
Aug 13, 2026
MaxWell
More Than 4,400 Rockwell PLCs Found Exposed Online Amid Water Sector Cyber Risks
A global scan conducted by cybersecurity researchers has identified thousands of internet-facing Rockwell Automation programmable...
Read More
HII Partners with Robotics Firms to Accelerate AI-Powered Shipbuilding
Aug 13, 2026
MaxWell
HII Partners with Robotics Firms to Accelerate AI-Powered Shipbuilding
Huntington Ingalls Industries (HII) has announced long-term performance-based production agreements with Path Robotics and GrayMatter...
Read More
ABB Powers Allseas’ Next-Generation Offshore Converter Transport Vessel
Aug 12, 2026
MaxWell
ABB Powers Allseas’ Next-Generation Offshore Converter Transport Vessel
ABB has signed a new agreement with Guangzhou Shipyard International (GSI) to provide the complete power...
Read More
Schneider Electric Unveils Digital Mining Technologies for Electra Mining Africa 2026
Aug 12, 2026
MaxWell
Schneider Electric Unveils Digital Mining Technologies for Electra Mining Africa 2026
Schneider Electric will showcase the future of intelligent mining at Electra Mining Africa 2026, presenting...
Read More
Vale and ABB Launch AI Automation Program to Transform Iron Ore Processing
Aug 12, 2026
MaxWell
Vale and ABB Launch AI Automation Program to Transform Iron Ore Processing
Vale S.A. and ABB have entered into a strategic agreement to expand the use of artificial...
Read More
Siemens Redefines Software-Defined Automation via Simatic AX Extensions
Aug 11, 2026
MaxWell
Siemens Redefines Software-Defined Automation via Simatic AX Extensions
In an ongoing effort to democratize software-defined automation, Siemens has rolled out critical updates to its Simatic...
Read More
Rockwell Automation and CAR Outline Smart Manufacturing Shift in Automotive
Aug 11, 2026
MaxWell
Rockwell Automation and CAR Outline Smart Manufacturing Shift in Automotive
Rockwell Automation and the Center for Automotive Research have published findings detailing how data architectures and...
Read More