88FV01F GJR2332300R0100 ABB Master Station Modem Module Procontrol P14
88FV01F GJR2332300R0100 ABB Master Station Modem Module Procontrol P14
88FV01F GJR2332300R0100 ABB Master Station Modem Module Procontrol P14
ABB

88FV01F GJR2332300R0100 ABB Master Station Modem Module Procontrol P14

SKU: GJR2332300R0100
Categories : ABB
In Stock
  • Dimensions: 24 x 19 x 5.3cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for high-speed data transmission in Procontrol P14 networks, the ABB GJR2332300R0100 (88FV01F Master Station Modem Module) provides direct physical and electrical execution of FDDI token ring optical fiber communication.

Module Variant and Nomenclature

The 88FV01F designation corresponds to the Master Station Modem Module hardware assembly within the Procontrol P14 architecture. This unit handles signal modulation and conversion between electrical backplane signals and optical fiber physical layers for deterministic network operations.

Hardware Specifications

Parameter Specification
Model GJR2332300R0100 (88FV01F)
Brand ABB
Origin Sweden
Weight 1.22 kg
Shipping Dimensions 24.0 cm x 19.0 cm x 5.3 cm
Operating Temp Standard industrial ambient range
Power Consumption System-dependent
Communication FDDI Token Ring 100 Mbit/s

Network Determinism and Firmware Compatibility

The module manages network token circulation to ensure deterministic communication across the Procontrol P14 backplane bus. Firmware flash compatibility is strictly enforced to match the network master configuration; mismatching firmware versions will result in network initialization failure. The modem executes signal conversion at 100 Mbit/s, utilizing optical isolation to provide immunity against electromagnetic interference in high-noise environments. In the event of a fiber loop break, the module initiates a self-healing protocol, reconfiguring the ring topology to maintain communication between operational nodes without manual intervention.

Ordering Info

  • GJR2332300R0100 Master Station Modem Module

  • Optical fiber connector housing

  • Technical installation guide

Field Installation Guidelines

  • Ensure the module is inserted into the designated Procontrol P14 rack slot, ensuring proper engagement with the backplane bus.

  • Clean optical fiber termination surfaces using approved lint-free tools before connection.

  • Connect fiber-optic cables, ensuring the transmit (TX) and receive (RX) ports match the system cabling plan.

  • Verify network status indicators on the module front panel after power-on.

  • Inspect fiber paths for excessive bending radii, which may induce signal attenuation.

Frequently Asked Questions

  • Q: Can this module be hot-swapped while the network is active?

    A: No, module insertion or removal during active network token circulation may cause transient ring errors; follow system-specific shutdown procedures.

  • Q: What is the maximum fiber length supported?

    A: The module supports transmission up to 2,000 meters depending on fiber quality and attenuation per splice.

  • Q: How is network fault detection handled?

    A: The module detects link loss via the FDDI physical layer and triggers an automated network reconfiguration sequence.

  • Q: Is this module compatible with standard Ethernet (IEEE 802.3)?

    A: No, it utilizes the FDDI protocol over fiber and is not natively compatible with standard RJ45 Ethernet switches.

  • Q: How do I upgrade module firmware?

    A: Firmware upgrades are performed via the Procontrol P14 engineering workstation connected through the rack interface.

  • Q: What indicates a module failure?

    A: Failure is indicated by diagnostic LED patterns on the front panel and a "Network Not Ready" status reported to the controller.

  • Q: Are redundant fiber paths required?

    A: For self-healing topology, dual fiber loops are necessary to allow the module to reroute traffic during a single cable break.

  • Q: Does the module provide backplane power?

    A: No, it consumes power from the system rack backplane; ensure the rack power supply module is rated for the total installed load.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Assembly
Oct 15, 2026
Maxwell
Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Ass...
On September 29, 2026, the Future Astronaut Xiongan Smart Manufacturing Base officially commenced operations in...
Read More
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
Oct 15, 2026
Maxwell
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
The 2026 World Manufacturing Conference, held September 20-23 in Hefei, Anhui Province, concluded with an...
Read More
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More