DSDI120AV1 3BSE018296R1 ABB Digital Input Module S100 I/O
DSDI120AV1 3BSE018296R1 ABB Digital Input Module S100 I/O
DSDI120AV1 3BSE018296R1 ABB Digital Input Module S100 I/O
ABB

DSDI120AV1 3BSE018296R1 ABB Digital Input Module S100 I/O

SKU: DSDI120AV1 3BSE018296R1
Categories : ABB
In Stock
  • Dimensions: 2 x 25.5 x 24.3 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for high-density digital signal acquisition in Advant Controller 800 Series and S100 I/O platforms, the ABB DSDI120AV1 (3BSE018296R1 Digital Input Module) provides direct physical/electrical execution.

Model Identification & Part Number Suffix Mapping

  • Base Model Designation: DSDI120AV1
  • Full Catalog Number: 3BSE018296R1
  • System Architecture Family: S100 I/O and Advant Controller 800 Series
  • Hardware Classification: 32-Channel Digital Input Board

Hardware Specifications

Parameter Specification
Model DSDI120AV1
Brand ABB
Part Number 3BSE018296R1
Origin SWEDEN
Weight 0.25 kg
Shipping Dimensions 2 x 25.5 x 24.3 cm
Operating Temp 0 deg C to +60 deg C
Storage Temperature -40 deg C to +85 deg C
Relative Humidity 5 to 95 percent non-condensing
Nominal Input Voltage 24 VDC
Input Voltage Range 19.2 to 30 VDC
Channel Capacity 32 channels (configured in groups of 16)

PLC and DCS Integration Architecture

  • Backplane Communication Velocity: Operates over the high-speed S100 I/O backplane bus, interfacing directly with Advant Controller and MasterPiece controllers.
  • I/O Density Scaling: Houses 32 physical input channels separated into two distinct groups of 16 channels, sharing common 0 V references.
  • Firmware Flash Compatibility: Fully compatible with standard system software revisions utilized across Advant DCS environments.
  • Connection Topology: Supports up to four connection units of 8 inputs each via standard multi-core system interface cables.

Ordering Information

  • 1 x DSDI120AV1 3BSE018296R1 Digital Input Module
  • Documentation and configuration software are not physically bundled in the shipment box unless explicitly requested.

Field Installation Guidelines

  • DIN-Rail and Chassis Mounting: Secure the module firmly onto the designated S100 I/O chassis slot to ensure proper backplane pin engagement and chassis grounding continuity.
  • Signal Wiring & Shielding: Route low-voltage 24 VDC input lines away from high-voltage AC power cables to minimize electromagnetic interference (EMI). Terminate drain wires at the designated system grounding bar.
  • External Fusing Configuration: Implement external fuses for sub-groups of channels if isolated channel protection is required outside the shared 0 V common architecture.
  • Power Verification: Verify that the 24 VDC nominal supply voltage is stable within the 19.2 to 30 VDC threshold range before energizing the module.

Frequently Asked Questions

  • What is the nominal operating voltage of the DSDI120AV1 module?

    The module operates at a nominal input voltage of 24 VDC, with an acceptable operating range spanning from 19.2 to 30 VDC.

  • How many total input channels are available on this board?

    The unit features 32 total digital input channels, divided into groups that share common 0 V reference points.

  • Which control system platforms are compatible with this I/O card?

    It is engineered specifically for deployment within ABB Advant Controller 800 Series, MasterPiece, and S100 I/O infrastructure.

  • Is hot-swapping supported on the S100 I/O backplane?

    Hot-insertion or removal should be evaluated based on specific system rack power states and processor configuration guidelines to avoid bus communication faults.

  • What are the storage temperature limits for this hardware?

    The module can be safely stored in environments ranging from -40 deg C to +85 deg C.

  • Can external fusing be applied to individual channel groups?

    Yes, external fusing can be utilized for smaller sub-groups of channels even though the main groups share a common 0 V reference.

  • What physical dimensions can be expected for shipping preparation?

    The estimated packaging dimensions are approximately 2 x 25.5 x 24.3 cm with a net unit weight of 0.25 kg.

  • What type of connection units interface with this digital board?

    Users can connect up to four connection units consisting of 8 inputs each using standard ABB interface cabling.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
Sep 15, 2026
MaxWell
US EIA Forecasts Record 86 GW Grid Capacity Additions in 2026
The U.S. Energy Information Administration forecasts that the United States will add a record 86...
Read More
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
Sep 15, 2026
MaxWell
WindEurope Reports 151 GW New Wind Capacity Expected Across Europe 2026-2030
WindEurope expects Europe to install 151 gigawatts of new wind power capacity over the 2026-2030...
Read More
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
Sep 15, 2026
Shopify API
India Reaches 150 GW Solar Milestone with 44.6 GW Added in Fiscal 2026
India has achieved a significant renewable energy milestone, reaching 150 gigawatts of installed solar capacity...
Read More
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
Sep 14, 2026
Shopify API
German Cabinet Approves Offshore Wind Auction Reform to Accelerate Deployment
The German government has approved plans to reform offshore wind auction processes, according to Windpower...
Read More
Masdar and ScottishPower Advance East Anglia Three 1.4 GW Offshore Wind Project
Sep 14, 2026
Shopify API
Masdar and ScottishPower Advance East Anglia Three 1.4 GW Offshore Wind Project
Masdar and ScottishPower Renewables have announced significant progress on the East Anglia Three offshore wind...
Read More
China Develops World's Largest 50MW Floating Wind Turbine Prototype
Sep 14, 2026
Shopify API
China Develops World's Largest 50MW Floating Wind Turbine Prototype
China is developing what is planned to become the world's largest floating wind turbine with...
Read More
Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
Sep 13, 2026
MaxWell
Predictive Maintenance Adoption Accelerates Across Oil and Gas Operations
The oil and gas industry is accelerating adoption of predictive maintenance strategies, with over 60%...
Read More
Industrial Automation Sector Q2 2026 Financial Results Show Mixed Performance
Sep 13, 2026
MaxWell
Industrial Automation Sector Q2 2026 Financial Results Show Mixed Performance
Industrial automation companies reported mixed financial results for the second quarter of 2026, reflecting varying...
Read More
POWERCHINA Advances 1.8 GW Wind Power Portfolio to Support Egypt's Energy Transition
Sep 13, 2026
MaxWell
POWERCHINA Advances 1.8 GW Wind Power Portfolio to Support Egypt's Energy Transition
Power Construction Corporation of China is advancing a portfolio of wind power projects totaling more...
Read More
Siemens Industrial AI Strategy: From CES 2026 to Production Floor
Sep 12, 2026
MaxWell
Siemens Industrial AI Strategy: From CES 2026 to Production Floor
Siemens' industrial artificial intelligence strategy has evolved from concept demonstration to production deployment, marking a...
Read More