DLM02 P37421-4-0338434 ABB Link Module H&B Freelance 2000 Series
DLM02 P37421-4-0338434 ABB Link Module H&B Freelance 2000 Series
DLM02 P37421-4-0338434 ABB Link Module H&B Freelance 2000 Series
DLM02 P37421-4-0338434 ABB Link Module H&B Freelance 2000 Series
ABB

DLM02 P37421-4-0338434 ABB Link Module H&B Freelance 2000 Series

SKU: DLM02
Categories : ABB
In Stock
  • Dimensions: 4.1 x 20.5 x 31 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB DLM 02 P37421-4-0338434, also cataloged as the DLM02 Link Module, operates as a dedicated hardware component for system communication and module interconnection within ABB H&B Freelance 2000 platforms.

Model Identification Matrix

Parameter Specification
Model DLM02
Full Ordering Code P37421-4-0338434
Spare Model DLM 02 P37421-4-0338434
Product Type Link Module
Series ABB H&B Freelance 2000
Manufacturer ABB
Country of Origin Germany

Hardware Specifications

Parameter Specification
Model DLM02
Brand ABB
Origin Germany
Weight 1.68 kg
Shipping Dimensions 4.1 x 20.5 x 31 cm
Operating Temp Not specified
Power Consumption Not specified
Module Function Communication link interface
System Platform ABB H&B Freelance 2000
Module Type DLM-02 Link Module

Industrial Communication Interface Characteristics

The ABB DLM02 is a communication interface module designed for the H&B Freelance 2000 automation system. The module provides internal data exchange capability between system components through the defined Freelance 2000 communication architecture.

As part of ABB modular control platforms, the DLM02 requires correct hardware identification and system configuration matching during replacement. Communication performance depends on the installed controller architecture, connected modules, and configured system parameters.

ABB control systems use structured backplane and communication interfaces to maintain deterministic data exchange between automation components. Proper module addressing, connection verification, and firmware compatibility checks should be completed before commissioning.

Ordering Information

  • 1 x ABB DLM02 P37421-4-0338434 Link Module
  • Supplied as an individual H&B Freelance 2000 communication module
  • No external communication cables, mounting accessories, or additional interface components are included

Installation Guidelines

  • Disconnect system power before installing or removing the DLM02 module.
  • Confirm the correct Freelance 2000 rack position before installation.
  • Inspect module connectors and mating interfaces before insertion.
  • Ensure communication wiring follows the original system configuration.
  • Keep communication cables separated from high-voltage power wiring.
  • Maintain proper grounding and shielding practices for industrial communication lines.
  • Verify module recognition and communication status after installation.

Frequently Asked Questions

  • What is the main function of ABB DLM02?

The DLM02 is a Link Module designed for communication and interconnection functions within ABB H&B Freelance 2000 systems.

  • What is the complete part number of DLM02?

The full identification is P37421-4-0338434, also listed as DLM 02 P37421-4-0338434.

  • Is DLM02 an input or output module?

No. DLM02 is a communication link module and does not function as a standard field I/O module.

  • Which system uses the DLM02 module?

The DLM02 belongs to the ABB H&B Freelance 2000 automation platform.

  • Can DLM02 be installed while the system is powered?

No. Power isolation is recommended before removing or installing communication modules.

  • Does DLM02 require firmware compatibility checking?

Yes. System firmware and hardware configuration should be verified before replacement.

  • What should be checked after DLM02 installation?

Verify module recognition, communication status, and system diagnostics after installation.

  • What precautions are required when handling DLM02?

Use ESD protection, avoid connector damage, and maintain original wiring and grounding arrangements.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


PDF Datasheet Official Technical Specifications

DLM02 P37421-4-0338434 ABB Link Module H&B Freelance 2000 Series

You may also like

From our blog

Latest News and Insights

Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More
China Intelligent Technology Empowers Global South
Oct 11, 2026
Maxwell
China Intelligent Technology Empowers Global South Mining Development
China's mining intelligence technologies are gaining international recognition as countries across the Global South seek...
Read More
Luliang Builds 62 Intelligent Coal Mines with 678 Positions Achieving Unmanned Operation
Oct 11, 2026
Maxwell
Luliang Builds 62 Intelligent Coal Mines with 678 Positions Achieving Unmanned Operation
The city of Luliang in Shanxi Province has emerged as a showcase for the transformation...
Read More