CS1W-BC103 Omron CS1 CPU Backplane Unit
CS1W-BC103 Omron CS1 CPU Backplane Unit
CS1W-BC103 Omron CS1 CPU Backplane Unit
Omron

CS1W-BC103 Omron CS1 CPU Backplane Unit

SKU: CS1W-BC103
Categories : All Products
In Stock
  • Dimensions: 48.0 x 15.0 x 12.0 cm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Omron CS1W-BC103, also cataloged as the CS1W-BC103 CPU Backplane Unit, operates as a dedicated hardware component for central rack power distribution and internal bus communication within SYSMAC CS1 controller assemblies.

Functional Class Breakdown

  • CS1W System Identifier: Designates structural mounting rack hardware compatible with CS1 system power supply units, CPUs, and I/O modules.
  • BC Backplane Code: Indicates a CPU backplane rack fitted with dedicated power supply, CPU, and expansion bus cable connectors.
  • 103 Slot Allocation Index: Specifies 10 available I/O expansion slots alongside the dedicated CPU and power supply unit positions.

Physical Parameters

Parameter Specification
Model CS1W-BC103
Brand Omron
Origin Japan
Weight 1.40 kg
Shipping Dimensions 48.0 x 15.0 x 12.0 cm
Operating Temp 0 to +55 deg C
Power Consumption Passive chassis (powered via PS module)
Total I/O Slots 10 slots (excluding CPU and Power Supply slots)
Expansion Bus Interface 1 x CS1 expansion bus connector
Mounting Type Panel mounting via M4 screws

Backplane Integration and Scalability

The backplane maintains backplane bus communication velocity across all 10 local module slots. Onboard copper tracks facilitate uniform power distribution from the power supply unit to all connected modules, supporting high I/O density scaling while maintaining firmware flash compatibility across installed intelligent I/O units.

Package Order Content

  • 1 x Omron CS1W-BC103 10-Slot CPU Backplane Unit
  • 1 x Expansion Bus Connector Cover Cap
  • 2 x Panel Mounting Brackets

Physical Mounting and Wiring Standards

  • De-energize Control Cabinet: Always disconnect primary AC/DC power sources before mounting the backplane or plugging in CPU and I/O modules.
  • Ground Lug Termination: Connect a dedicated protective earth ground conductor (10 AWG minimum) directly to the functional earth terminal on the backplane frame.
  • Convective Clearance Rules: Maintain a minimum vertical distance of 50 mm above and below the backplane unit for unrestricted thermal dissipation.
  • Connector Shielding Cap: Keep the protective cover cap installed on the expansion bus connector if no expansion cable is attached.

Frequently Asked Questions

  • Can CPU or I/O modules be hot-swapped directly from the CS1W-BC103 backplane?

    No, removing or inserting modules while the backplane power supply is active can damage internal bus driver circuits and halt the system.

  • How many total expansion slots are available for functional I/O cards?

    The chassis features 10 general-purpose slots in addition to the dedicated slots reserved for the power supply unit and CPU processor.

  • Does the CS1W-BC103 backplane require an external DC power connection?

    No, the backplane is a passive structural unit that routes 5 VDC and 24 VDC power directly from the installed power supply module.

  • How is an expansion rack linked to the CS1W-BC103 CPU backplane?

    A dedicated CS1 expansion bus cable connects from the right-hand expansion port of the CS1W-BC103 to the expansion backplane unit.

  • What panel mounting hardware is required to secure the backplane frame?

    Use four M4 pan-head steel screws tightened into threaded enclosure mounting plate holes to achieve a solid mechanical ground bond.

  • What limits the maximum number of I/O modules installed on the backplane?

    The total 5 VDC power consumption of all 10 installed modules must not exceed the current output rating of the power supply unit.

  • Does the backplane require individual slot addressing via DIP switches?

    No, slot addresses are fixed geographically by the backplane printed circuit board trace layout from left to right starting at slot 00.

  • How does ground noise suppression function across the backplane chassis?

    The backplane incorporates an internal ground plane bonded to the metallic mounting frame and functional earth terminal pin.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


PDF Datasheet Official Technical Specifications

CS1W-BC103 Omron CS1 CPU Backplane Unit

You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More