CPM1A-10CDT-A-V1 Omron CPM1A Series Programmable Controller
CPM1A-10CDT-A-V1 Omron CPM1A Series Programmable Controller
Omron

CPM1A-10CDT-A-V1 Omron CPM1A Series Programmable Controller

SKU: CPM1A-10CDT-A-V1
Categories : All Products
In Stock
  • Dimensions: 90 mm x 66 mm x 70 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Omron CPM1A-10CDT-A-V1, also cataloged as the CPM1A Programmable Controller, operates as a dedicated hardware component for direct digital I/O processing and high-speed pulse count verification within stand-alone automation panels.

Nomenclature Breakdown

  • CPM1A: Compact Micro PLC Base Platform
  • 10: Total Integrated I/O Point Capacity (6 Digital Inputs / 4 Transistor Outputs)
  • C: CPU Unit with Integrated I/O Terminals
  • D: 24 VDC Discrete Input Signal Processing
  • T: NPN Transistor Sink Output Configurations
  • A: 85 to 264 VAC Line Voltage Power Input
  • V1: Version 1 Hardware and Processing Upgrade Baseline

Technical Specifications Summary

Parameter Specification
Model CPM1A-10CDT-A-V1
Brand Omron
Origin Japan
Weight 3.1 kg (Shipping)
Shipping Dimensions 90 mm x 66 mm x 70 mm
Operating Temp 0 to 55 deg C
Power Consumption 20 VA max
Power Supply 85 to 264 VAC
Digital Inputs 6 points
Digital Outputs 4 points (Transistor sink type)
Program Capacity 2 kWords
Data Memory 1 kWords
Execution Speed 0.72 us to 1.72 us
Built-In Functions 1 Encoder input (5 kHz), 1 Pulse output (2 kHz)
Expansion Support Not supported

Logic Execution Velocity & Firmware Flash Synchronization

The central processing architecture executes ladder instructions at scan velocities between 0.72 us and 1.72 us per basic instruction. System initialization runs an integrated firmware flash compatibility check on internal ROM address space to maintain deterministic cyclic task updates across local I/O update buffers.

Package Inventory

  • 1 x Omron CPM1A-10CDT-A-V1 PLC Base Controller
  • 1 x Removable Terminal Block Safety Cover
  • 1 x Instruction Sheet and Wiring Guide

Mounting & Electrical Isolation Directives

  • Mount the controller vertically on a 35 mm DIN rail or attach directly to a grounded panel backing plate using M4 screws.
  • Maintain a minimum clearance of 50 mm above and below the housing to allow natural thermal convection.
  • Connect the line power ground terminal directly to a heavy-duty copper earth bar using AWG 14 minimum copper wire.
  • Route NPN sink output wires separately from incoming AC main lines to minimize capacitive noise coupling.

Frequently Asked Questions

  • What exact input and output channel count is provided on the terminal blocks?

    The terminal strip incorporates 6 discrete input points rated for 24 VDC signals and 4 NPN transistor sink output channels.

  • Can additional local expansion I/O modules be added to this model?

    No, the CPM1A-10CDT-A-V1 is a non-expandable micro CPU unit designed exclusively for fixed 10-point I/O applications.

  • What high-speed counting functions are integrated directly into the processing hardware?

    The CPU features one built-in high-speed encoder input capable of tracking pulses up to 5 kHz and one dedicated 2 kHz pulse output.

  • Is hot-swapping or live terminal removal permitted during operation?

    Hot-swapping is strictly prohibited. Power must be fully disconnected before removing wire leads or terminal covers to prevent hardware failure.

  • How does the system handle internal ladder program and data memory storage?

    The CPU provides 2 kWords of user program capacity and 1 kWord of data memory, maintained by non-volatile flash memory and backup capacitor circuits.

  • What operational line voltage limits are supported by the AC power supply?

    The internal power unit accepts an AC input range from 85 VAC to 264 VAC at a frequency of 50/60 Hz with a maximum load of 20 VA.

  • What happens if a firmware flash mismatch occurs during programming updates?

    The CPU halts ladder program execution, turns on the ERROR LED indicator, and sets system flags to prevent corrupt instruction execution.

  • What wire gauge is specified for the AC line power terminal connections?

    Use stranded copper wires with a cross-sectional area of 0.75 mm sq to 2.0 mm sq (AWG 18 to AWG 14) stripped to 6 mm length.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Nov 19, 2026
Maxwell
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Schneider Electric has announced a strategic collaboration with NVIDIA and Hewlett Packard Enterprise to accelerate...
Read More
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
Nov 19, 2026
Maxwell
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
SpaceX has placed an order with German equipment manufacturer SINGULUS Technologies for a heterojunction (HJT)...
Read More
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Nov 19, 2026
Maxwell
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Rockwell Automation has unveiled PanelView Pro, a next-generation high-performance human-machine interface designed to meet the...
Read More
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
Nov 18, 2026
Maxwell
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
A milestone in the American energy transition is approaching, and it is happening in the...
Read More
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Nov 18, 2026
Maxwell
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Humanoid robots have crossed a threshold from laboratory curiosity to production floor reality in the...
Read More
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
Nov 18, 2026
Maxwell
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
The global industrial automation sector is witnessing a dramatic reshuffling of strategic alliances as SoftBank...
Read More
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
Nov 17, 2026
Maxwell
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
The global electric vehicle battery landscape has undergone a decisive shift. According to data released...
Read More
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Nov 17, 2026
Maxwell
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Honeywell has entered a new chapter. At the ninth China International Import Expo (CIIE), held...
Read More
Siemens Signs Strategic Partnership with Nanjing for Smart Manufacturing Under 15th Five-Year Plan
Nov 17, 2026
Maxwell
Siemens Signs Strategic Partnership with Nanjing for Smart Manufacturing Under 15th Five-Year Plan
Siemens is deepening its roots in one of China's most important manufacturing hubs. On November...
Read More
Apple Unveils HALO Humanoid Robot Autonomous Control System with 91% Task Success Rate
Nov 16, 2026
Maxwell
Apple Unveils HALO Humanoid Robot Autonomous Control System with 91% Task Success Rate
Apple has entered the humanoid robotics race, albeit in characteristically understated fashion. On November 4,...
Read More