CP2E-N20DT-D Omron Programmable Controller CP2E Series
CP2E-N20DT-D Omron Programmable Controller CP2E Series
CP2E-N20DT-D Omron Programmable Controller CP2E Series
CP2E-N20DT-D Omron Programmable Controller CP2E Series
CP2E-N20DT-D Omron Programmable Controller CP2E Series
CP2E-N20DT-D Omron Programmable Controller CP2E Series
Omron

CP2E-N20DT-D Omron Programmable Controller CP2E Series

SKU: CP2E-N20DT-D
Categories : All Products
In Stock
  • Dimensions: 130 mm x 110 mm x 100 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Omron CP2E-N20DT-D, also cataloged as the CP2E Programmable Controller, operates as a dedicated hardware component for direct digital I/O processing and discrete logic execution within CP2E automation platforms.

Model Suffix Key & Architecture

  • CP2E: Base compact controller series platform identifier.

  • N: Network-type CPU unit with built-in Ethernet functionality.

  • 20: Total integrated digital I/O point capacity (12 inputs / 8 outputs).

  • D: Direct current power supply rating (24 VDC).

  • T: Transistor sinking output configuration.

Operating & Hardware Parameters

Parameter Specification
Model CP2E-N20DT-D
Brand Omron
Origin Japan
Weight 0.36 kg (Shipping Weight 2.0 kg)
Shipping Dimensions 130 mm x 110 mm x 100 mm
Power Supply 24 VDC
Integrated Inputs 12 points (24 VDC)
Integrated Outputs 8 points (Transistor, sinking)
Current Consumption 0.27 A at 5 VDC / 0.02 A at 24 VDC
Operating Temp 0 deg C to 55 deg C

Deterministic Communication & Memory Bus

The CPU unit integrates deterministic network protocols across its onboard Ethernet interfaces to ensure synchronous data exchanges with supervisory PLC and HMI hosts. Embedded logic hardware maintains full firmware flash compatibility, facilitating real-time memory address synchronization and rapid scan cycle times across expanding I/O density configurations.

Standard Delivery Contents

  • 1 x Omron CP2E-N20DT-D PLC CPU unit

  • 1 x Field hardware wiring and terminal layout reference document

Mechanical Mounting & Wiring Guidelines

  • Mounting Execution

    Snap securely onto standard 35 mm DIN rail or secure directly to a steel enclosure backpanel using M4 mounting screws.

  • Signal Separation

    Route 24 VDC power supply leads and transistor output lines in separate wire ducts away from high-voltage AC power circuits.

  • Cable Shielding

    Terminate communication cable shields and field input common lines to the functional earth (FE) terminal using short copper braid conductors.

Technical FAQ

  • What power supply voltage is required for the CP2E-N20DT-D CPU?

    The controller operates on a nominal 24 VDC power supply with permissible operating tolerance ranges.

  • What is the digital I/O point allocation on this CPU unit?

    The module integrates 20 total points, partitioned specifically as 12 digital inputs and 8 sinking transistor outputs.

  • What are the internal power supply current draws for this model?

    Current consumption is rated at 0.27 A from the internal 5 VDC bus and 0.02 A from the 24 VDC power line.

  • Does the CPU support direct network integration without option boards?

    Yes, the N-type CP2E model includes built-in Ethernet ports supporting socket communications and Modbus TCP protocols.

  • Can I terminal-block wire NPN or PNP sinking/sourcing field devices?

    The digital inputs accept sink or source wiring topologies, while the output stage consists strictly of sinking (NPN) transistors.

  • Is hot-swapping permitted for expansion units on this controller?

    No, main DC power must be isolated before attaching or removing CPU expansion terminal units to prevent hardware damage.

  • What is the operating ambient temperature limit inside the panel?

    The hardware operates within a thermal window of 0 deg C to 55 deg C under non-condensing relative humidity conditions.

  • How is user program memory retained during power outages?

    Program logic and system parameters are saved in non-volatile flash memory without requiring continuous battery power backup.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


PDF Datasheet Official Technical Specifications

CP2E-N20DT-D Omron Programmable Controller CP2E Series

You may also like

From our blog

Latest News and Insights

Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
Aug 29, 2026
Maxwell PLC Ltd
Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
At the ACG Caving Conference 2026 in Ulaanbaatar, mining technology developer Sandvik formally introduced xCell...
Read More
Vale Partners with ABB to Deploy Advanced Automation across Mining Fleet
Aug 29, 2026
Maxwell PLC Ltd
Vale Partners with ABB to Deploy Advanced Automation across Mining Fleet
Mining giant Vale has formalized a long-term strategic alliance with industrial engineering group ABB to...
Read More
Tanzania Commissions 2,115 MW Julius Nyerere Hydropower Project on Rufiji River
Aug 29, 2026
Maxwell PLC Ltd
Tanzania Commissions 2,115 MW Julius Nyerere Hydropower Project on Rufiji River
Tanzania officially brought East Africa's largest hydroelectric facility online following the inauguration of the 2,115...
Read More
Schneider Electric Backs Rare Earth Supply Chain
Aug 29, 2026
MaxWell
Schneider Electric Backs Rare Earth Supply Chain
Schneider Electric and Torngat Metals have signed a non-binding Memorandum of Understanding to explore a...
Read More
Schneider Electric and Torngat Metals Target Resilient Rare Earth Supply Chain
Aug 29, 2026
MaxWell
Schneider Electric and Torngat Metals Target Resilient Rare Earth Supply Chain
Schneider Electric and Torngat Metals have signed a non-binding Memorandum of Understanding to explore an...
Read More
Schneider Electric Puts Business Value at the Center of Industrial Digitalization
Aug 29, 2026
MaxWell
Schneider Electric Puts Business Value at the Center of Industrial Digitalization
Schneider Electric is calling on industrial companies to take a more disciplined approach to digital...
Read More
Holland-Controls Modernizes Siemens PCS 7 Control Infrastructure for Offshore Oil Platform
Aug 28, 2026
MaxWell
Holland-Controls Modernizes Siemens PCS 7 Control Infrastructure for Offshore Oil Platform
System integrator Holland-Controls has initiated a critical automation system modernization project across an active offshore oil and...
Read More
Streamlining Plant Maintenance Documentation Eliminates Operational Delays and Boosts Reliability
Aug 28, 2026
MaxWell
Streamlining Plant Maintenance Documentation Eliminates Operational Delays and Boosts Reliability
Operational delays in heavy industrial facilities frequently stem from fragmented documentation rather than actual mechanical...
Read More
Baker Hughes Outlines Next-Generation Autonomous Well Construction Framework
Aug 27, 2026
MaxWell
Baker Hughes Outlines Next-Generation Autonomous Well Construction Framework
Energy services provider Baker Hughes is accelerating upstream digitalization by expanding its autonomous drilling architecture. Executive...
Read More
Emerson Enhances Guardian Digital Platform with Advanced Industrial AI Tools
Aug 27, 2026
MaxWell
Emerson Enhances Guardian Digital Platform with Advanced Industrial AI Tools
To streamline process operations, Emerson has integrated advanced enterprise artificial intelligence into its flagship Guardian digital platform....
Read More