CJ1W-ID212 Omron DC Input Module CJ Series
Omron

CJ1W-ID212 Omron DC Input Module CJ Series

SKU: CJ1W-ID212
Categories : All Products
In Stock
  • Dimensions: 180 x 130 x 90 mm
  • Country of origin: Japan
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Omron CJ1W-ID212, also cataloged as the CJ1W-ID212 DC Input Unit, operates as a dedicated hardware component for high-speed 24 VDC discrete signal sensing within CJ Series PLC backplane architectures.

Input Channel Breakdown & Allocation

  • Signal Density: Accommodates 16 high-speed DC input channels sharing 1 common electrical line.
  • PLC Memory Mapping: Occupies exactly 1 word (16 bits) in the CPU memory allocation map for direct digital I/O processing.
  • Electrical Termination: Equipped with a standard front-facing removable terminal block for field conductor terminations.

Performance Specifications

Parameter Specification
Model CJ1W-ID212
Brand Omron
Module Type DC Input Unit
Series CJ Series
Number of Inputs 16 points (High speed, 1 circuit, 16 points/common)
Input Voltage & Current 24 VDC, 7 mA per point
Memory Allocation 1 word (16 bits)
External Connection Removable terminal block
Power Consumption 0.13 A max. at 5 VDC (Internal backplane)
Operating Temp 0 to 55 deg C
Weight Approx. 0.110 kg
Shipping Weight 2.0 kg
Shipping Dimensions Approx. 180 x 130 x 90 mm

High-Speed Backplane Synchronization & Execution

The module architecture interfaces directly with the system backplane to achieve deterministic signal acquisition. High-speed optocouplers isolate external field inputs while leveraging backplane bus communication velocity Licences to transfer digital states to the main processor within a single CPU scan cycle. Firmware flash compatibility across CJ Series controllers ensures predictable execution timings and seamless hardware swap behavior.

Package & Order Contents

  • 1 x Omron CJ1W-ID212 High-Speed DC Input Unit
  • 1 x Removable Terminal Block Assembly
  • 1 x Product Installation Sheet

Mechanical Mounting & Wiring Protocol

  • Chassis Insertion: Align the unit guides with the CJ Series backplane slot and press firmly until both the upper and lower locking tabs lock into position.
  • Terminal Wiring: Terminate 24 VDC field signal wires onto the removable terminal block using isolated crimp ferrules to maintain tight terminal spacing.
  • Terminal Block Attachment: Torque terminal screws evenly to prevent loose connections or resistance hot spots during continuous high-speed switching operations.
  • Conduit Isolation: Separate 24 VDC signal lines from high-voltage AC motor wires inside panel ducts to prevent induced electrical noise on input channels.

Technical Questions & Answers

  • What is the rated operating voltage and current draw per input channel?

    Each input channel operates at a nominal input rating of 24 VDC with a typical current draw of 7 mA.

  • How many memory words does this 16-point input module consume in the CPU?

    The module allocates exactly 1 word (16 bits) in the I/O memory map of the host CPU controller.

  • What terminal connection style is utilized for field signal wiring?

    Field signals terminate via a removable terminal block, allowing unit replacement without disconnecting individual field wires.

  • How much current does the unit draw from the internal 5 VDC power rail?

    The hardware draws 0.13 A (130 mA) from the internal 5 VDC backplane bus for logic circuit operation.

  • Can the terminal block be safely detached while field power is applied?

    No, field supply voltage and controller rack power must be turned off before detaching the terminal block to prevent electrical arc damage.

  • Are input points divided into multiple isolated commons on this hardware?

    No, all 16 high-speed input points share 1 single common connection point across the module terminal array.

  • Does the module require an external 5 VDC supply for internal operations?

    No, internal processing power is derived directly from the system backplane's 5 VDC power supply line.

  • How are input status changes conveyed to the CPU during execution?

    Input state transitions pass through fast optical isolators directly into the CPU backplane memory buffer during each scan phase.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


PDF Datasheet Official Technical Specifications

CJ1W-ID212 Omron DC Input Module CJ Series

You may also like

From our blog

Latest News and Insights

Baker Hughes Secures $7.1 Billion Record Orders Driven by Industrial Power Demand
Aug 31, 2026
MaxWell
Baker Hughes Secures $7.1 Billion Record Orders Driven by Industrial Power Demand
Energy technology provider Baker Hughes posted second-quarter revenues of $6.74 billion, navigating strategic divestitures while...
Read More
Mitsubishi Electric Consolidates North American Operations Under US Division Strategic Restructure
Aug 31, 2026
MaxWell
Mitsubishi Electric Consolidates North American Operations Under US Division Strategic Restructure
Mitsubishi Electric US, Inc. (MEUS) has initiated a structural consolidation of its United States enterprise...
Read More
Finnvera Secures Up to $132M Export Credit Financing Support for Troilus Copper-Gold Mine Development
Aug 31, 2026
MaxWell
Finnvera Secures Up to $132M Export Credit Financing Support for Troilus Copper-Gold Mine Develop...
Troilus Mining has secured non-binding support for up to $132 million in export credit support from Finland's...
Read More
First Mining Reaches Development Deal With Ontario First Nations
Aug 30, 2026
MaxWell
First Mining Reaches Development Deal With Ontario First Nations
Cat Lake First Nation (CLFN), Lac Seul First Nation (LSFN) and First Mining Gold have...
Read More
Cabral Gold Uncovers High-Grade Extension at Cuiú Cuiú Ahead of September Initial Pour
Aug 30, 2026
MaxWell
Cabral Gold Uncovers High-Grade Extension at Cuiú Cuiú Ahead of September Initial Pour
Cabral Gold has identified a promising new mineralized strike at its Cuiú Cuiú project in northern Brazil, expanding...
Read More
Boliden Expands in Latin America With $1.3B Nexa Deal
Aug 30, 2026
MaxWell
Boliden Expands in Latin America With $1.3B Nexa Deal
Swedish mining group Boliden has agreed to acquire Votorantim’s 65% controlling stake in Nexa Resources...
Read More
Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
Aug 29, 2026
Maxwell PLC Ltd
Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
At the ACG Caving Conference 2026 in Ulaanbaatar, mining technology developer Sandvik formally introduced xCell...
Read More
Vale Partners with ABB to Deploy Advanced Automation across Mining Fleet
Aug 29, 2026
Maxwell PLC Ltd
Vale Partners with ABB to Deploy Advanced Automation across Mining Fleet
Mining giant Vale has formalized a long-term strategic alliance with industrial engineering group ABB to...
Read More
Tanzania Commissions 2,115 MW Julius Nyerere Hydropower Project on Rufiji River
Aug 29, 2026
Maxwell PLC Ltd
Tanzania Commissions 2,115 MW Julius Nyerere Hydropower Project on Rufiji River
Tanzania officially brought East Africa's largest hydroelectric facility online following the inauguration of the 2,115...
Read More
Schneider Electric Backs Rare Earth Supply Chain
Aug 29, 2026
MaxWell
Schneider Electric Backs Rare Earth Supply Chain
Schneider Electric and Torngat Metals have signed a non-binding Memorandum of Understanding to explore a...
Read More