CC-SCMB05 Honeywell C300 Controller Memory Backup Module
CC-SCMB05 Honeywell C300 Controller Memory Backup Module
CC-SCMB05 Honeywell C300 Controller Memory Backup Module
Honeywell

CC-SCMB05 Honeywell C300 Controller Memory Backup Module

SKU: CC-SCMB05
Categories : All Products
In Stock
  • Dimensions: 24 x 18.8 x 6.5 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Honeywell CC-SCMB05 is a specialized safety and data integrity component engineered specifically for the Experion PKS C300 controller series. This Memory Backup Module functions as a high-reliability energy reservoir, ensuring that the controller’s volatile memory—containing critical process strategies, runtime variables, and configuration data—is preserved during primary power interruptions. Unlike standard consumer batteries, the CC-SCMB05 is an industrial-grade assembly designed for seamless integration into the C300 hardware stack, providing the deterministic protection required for Distributed Control Systems (DCS) in high-stakes process environments.

(Note: While some legacy documentation erroneously conflates this with pressure transmitters, the CC-SCMB05 is strictly a memory preservation module for Series C control hardware.)

Critical Hardware Parameters and System Specifications

  • Model Identification: CC-SCMB05

  • System Compatibility: Honeywell Experion PKS C300 Controllers

  • Functional Role: Non-volatile data retention and RAM backup

  • Installation Type: Plug-in module for Series C I/O and Controller rows

  • Operating Temperature Range: -40°C to +70°C

  • Hardware Lifecycle: Active support for legacy and modern DCS architectures

  • Product Weight: 0.4 kg

  • Physical Dimensions: 24 x 18.8 x 6.5 cm

  • HS Code: 8537101190

  • Country of Origin: USA

Industrial Reliability and Operational Use Cases

In the event of a total plant power failure or a localized cabinet electrical fault, the CC-SCMB05 serves as the final line of defense for the controller's logic state. It is primarily deployed in oil refineries, chemical plants, and pharmaceutical facilities where a "cold start" (loss of memory) could result in hours of downtime or hazardous process conditions. By maintaining the RAM contents, the module allows the C300 controller to perform a "warm start" once power is restored, resuming control exactly where it left off. Its robust design is vibration-resistant, ensuring that it remains securely connected even in the high-frequency environments of heavy machinery rooms or offshore platforms.

FAQ

Q: How often should the CC-SCMB05 module be replaced?

A: To ensure maximum reliability, Honeywell typically recommends a proactive replacement cycle every 3 to 5 years, depending on the ambient temperature of the control cabinet.

Q: Will the C300 controller trigger an alarm if this module fails?

A: Yes, the Experion PKS system monitors the health of the CC-SCMB05. If the backup capacity drops below a safe threshold, a "Battery Low" or "Backup Module Fault" alarm will be generated in the operator’s HMI.

Q: Is the CC-SCMB05 hot-swappable?

A: Yes, the module can be replaced while the controller is powered by the primary supply. However, care should be taken to ensure the system is not in a power-fail state during the swap, as the memory will not be protected while the module is removed.

Q: Does this module require specialized configuration software?

A: No, the CC-SCMB05 is a hardware-level backup device. Once plugged into the C300 interface, it is automatically recognized and managed by the controller’s internal power management firmware.

Q: Can this module be used with Series A or Series M hardware?

A: No, the CC-SCMB05 is specifically keyed and designed for the Series C form factor used by the C300 and associated PKS hardware.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Schneider Expands U.S. Manufacturing Infrastructure as ForwardX and Lynx Drive European AMR Growth
Jul 20, 2026
MaxWell
Schneider Expands U.S. Manufacturing Infrastructure as ForwardX and Lynx Drive European AMR Growth
The industrial automation and power distribution sectors are undergoing rapid transformations driven by the exponential...
Read More
Weintek Redefines Floor Mobility with New cMT3106XM Handheld HMI
Jul 20, 2026
MaxWell
Weintek Redefines Floor Mobility with New cMT3106XM Handheld HMI
As manufacturing facilities grow in size and operational complexity, fixed control panel layouts can introduce...
Read More
Wenglor Launches AI Lab to Streamline Industrial Image Processing Workflows
Jul 19, 2026
MaxWell
Wenglor Launches AI Lab to Streamline Industrial Image Processing Workflows
Wenglor Sensoric Group has unveiled its new AI Lab, a cloud-based platform engineered to accelerate the...
Read More
AutoStore Unveils Fall 2025 Portfolio to Enhance Warehouse Throughput and Operational Efficiency
Jul 19, 2026
MaxWell
AutoStore Unveils Fall 2025 Portfolio to Enhance Warehouse Throughput and Operational Efficiency
AutoStore has officially launched its Fall 2025 product portfolio, introducing a suite of seven modular...
Read More
Ati Motors Introduces Sherpa Mecha for Adaptive Industrial Automation
Jul 19, 2026
MaxWell
Ati Motors Introduces Sherpa Mecha for Adaptive Industrial Automation
Ati Motors has expanded the boundaries of robotic material handling with the launch of Sherpa...
Read More
Cincoze Expands Industrial Edge Capabilities with MD-3000 DIN-Rail Computer Series
Jul 18, 2026
MaxWell
Cincoze Expands Industrial Edge Capabilities with MD-3000 DIN-Rail Computer Series
Cincoze has bolstered its MAGNET industrial computing portfolio with the launch of the MD-3000 series,...
Read More
Banner Engineering Enhances Predictive Maintenance with IO-Link Enabled QM30VT3 Sensors
Jul 18, 2026
MaxWell
Banner Engineering Enhances Predictive Maintenance with IO-Link Enabled QM30VT3 Sensors
Banner Engineering has updated its QM30VT3 three-axis vibration and temperature sensor, integrating IO-Link connectivity to bridge the...
Read More
Yokogawa Launches OpreX A8 Edge Controller to Streamline Data-Centric Automation
Jul 18, 2026
MaxWell
Yokogawa Launches OpreX A8 Edge Controller to Streamline Data-Centric Automation
Yokogawa has officially unveiled its new OpreX Intelligent Edge Controller A8, a Linux-based platform engineered to...
Read More
ABB Launches Baldor-Reliance SP4 Shaft-Ground Motors for Longer VSD Service Life
Jul 17, 2026
MaxWell
ABB Launches Baldor-Reliance SP4 Shaft-Ground Motors for Longer VSD Service Life
ABB has introduced a new addition to its Baldor-Reliance SP4 motor portfolio, bringing integrated shaft-grounding...
Read More
Rockwell Automation Expands Global R&D Footprint with New Prague Advanced Technology Lab
Jul 17, 2026
MaxWell
Rockwell Automation Expands Global R&D Footprint with New Prague Advanced Technology Lab
Rockwell Automation has officially inaugurated a dedicated advanced technology research lab in Prague, Czech Republic, signaling...
Read More