Bently Nevada 128276-01E 128276-01 Half-Height Future Expansion Faceplate 3500/25 Series
Bently Nevada 128276-01E 128276-01 Half-Height Future Expansion Faceplate 3500/25 Series
Bently Nevada

Bently Nevada 128276-01E 128276-01 Half-Height Future Expansion Faceplate 3500/25 Series

SKU: 128276-01
Categories : All Products
In Stock
  • Dimensions: 2.5 x 3 x 12 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Bently Nevada 128276-01E, also cataloged as the 128276-01 Half-Height Future Expansion Faceplate, operates as a dedicated hardware component for physical slot protection and chassis sealing within 3500/25 Series machinery protection system platforms.

Physical and Environmental Parameters

Parameter Specification
Model 128276-01E / 128276-01
Spare Model 131151-01
Brand Bently Nevada
Origin USA
Weight 0.04 kg
Shipping Dimensions 2.5 x 3 x 12 cm
Operating Temp -40 deg C to +85 deg C
Humidity 0 to 95% RH (non-condensing)
Power Consumption 0 W (Passive component)
System Compatibility 3500/25 Enhanced Keyphasor Module
Tariff Code 8537101190

Cross-Talk Suppression and Rotor Dynamics Integrity

In high-density TSI (Turbine Supervisory Instrumentation) environments, maintaining the mechanical and electromagnetic integrity of the 3500 rack backplane is necessary for accurate rotor dynamics telemetry. This half-height faceplate provides critical cross-talk suppression by shielding adjacent active monitor channels—such as proximity probe inputs and magnetic pickups—from external electromagnetic interference (EMI) and radio frequency interference (RFI). By sealing the unpopulated half-slot of a 3500/25 Enhanced Keyphasor monitor configuration, the component ensures stable eddy-current probe scaling and prevents disruptions to gap voltage validation (-10 VDC targets), maintaining precise phase reference tracking without signal degradation.

Core Technical Inquiries

Q: What is the primary mechanical function of this half-height faceplate?

A: It secures unpopulated half-slots in a 3500 chassis when a half-height module like the 3500/25 is installed, ensuring correct cooling airflow profiles through internal convection and maintaining structural rigidity.

Q: Does this component affect the electrical load or backplane current consumption?

A: No. The faceplate is a completely passive mechanical asset and draws 0 mA from the 3500 rack backplane power supplies.

Q: Can this component be installed or removed while the rack is energized?

A: Yes, it can be handled during live rack operations (hot-swapped) without interrupting the operation of adjacent online monitoring channels or the rack interface module.

On-Site Deployment Procedures

  • Verify that the target 3500 chassis slot contains a half-height module (e.g., 3500/25) leaving an open half-slot position.

  • Align the faceplate with the chassis guide rails corresponding to the vacant upper or lower half-slot section.

  • Slide the component horizontally into the rack until the front panel sits flush with the adjacent monitor faceplates.

  • Tighten the integrated retaining screws to the specified chassis torque limits to ensure proper grounding and EMI seal engagement.

  • Inspect the surrounding chassis boundary to confirm that no gaps remain that could disrupt internal cooling air velocity.

Logistics and Procurement Elements

  • 128276-01E Half-Height Expansion Faceplate

  • Integrated panel retention fasteners

  • Factory certificate of conformance

Dispatch and Logistics Processing

Delivery time: 2-7 days when payment finish via global express couriers including DHL, FEDEX, and UPS. All components are packed in certified anti-static industrial packaging to mitigate electrostatic discharge risks during transit. Shipments originate from central logistics hubs in Xiamen, China.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More