Allen-Bradley 2711-K5A2 Operator Interface PanelView 550 HMI
Allen-Bradley 2711-K5A2 Operator Interface PanelView 550 HMI
Allen-Bradley 2711-K5A2 Operator Interface PanelView 550 HMI
Allen-Bradley

Allen-Bradley 2711-K5A2 Operator Interface PanelView 550 HMI

SKU: 2711-K5A2
Categories : All Products
In Stock
  • Dimensions: 27.9 cm x 17.8 cm x 10.2 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley 2711-K5A2, also cataloged as the 2711-K5A2 Operator Interface, operates as a dedicated hardware component for localized process visualization and command execution within DH-485 industrial network platforms.

Model Identification Data

The 2711-K5A2 is a monochrome terminal belonging to the PanelView 550 series. This hardware unit features a 5.5-inch display and an integrated keypad for operator input. It utilizes 240 KB of nonvolatile memory and 170 KB of RAM for runtime application storage and execution.

Hardware Technical Specifications

Parameter Specification
Model 2711-K5A2
Brand Allen-Bradley
Origin USA
Weight 1.2 kg
Shipping Dimensions 27.9 x 17.8 x 10.2 cm
Operating Temp Standard Industrial Range
Power Consumption Not specified (120/240 VAC Input)
Display 5.5 in Monochrome
Input Type Keypad
Communication DH-485
Memory 240 KB NV / 170 KB RAM

Industrial Control Compatibility

This device maintains synchronization with PLC architectures through the DH-485 protocol, ensuring deterministic data exchange. The system architecture supports standard backplane bus communication velocity for this series, allowing for reliable register status polling without additional latency. Firmware flash compatibility is limited; specific application requirements must be pre-loaded into the nonvolatile memory via the dedicated configuration port.

Ordering and Scope of Delivery

  • Allen-Bradley 2711-K5A2 terminal unit.

  • Package excludes DH-485 communication cables, mounting clips, and configuration software unless explicitly listed.

Installation and Field Directives

  • Power Isolation: De-energize the 120/240 VAC power source before mounting the unit to prevent electrical hazards.

  • Enclosure Sealing: Verify that the panel cutout dimensions are correct to allow for proper gasket compression and environmental protection against contaminants.

  • Grounding: Secure the chassis ground terminal to an industrial earth point to mitigate electromagnetic interference (EMI) that may cause signal jitter on the DH-485 link.

  • ESD Mitigation: Use a grounded wrist strap when handling the terminal to prevent electrostatic discharge to the internal logic and display controller components.

Logistics and Transit Standards

  • Delivery time: 2-7 days when payment finish.

  • Dispatched via DHL/FEDEX/UPS.

  • All hardware is shipped utilizing anti-static industrial packaging to provide protection against physical shock and electrostatic discharge during international transit.

Frequently Asked Questions

  • What indicates a backlight failure?

    A darkened screen despite active power input suggests a failure of the internal backlight inverter or bulb; this component is not field-serviceable.

  • Can the unit operate in hazardous environments?

    The terminal must be installed in a cabinet rated for the specific hazardous location Class and Division to ensure compliance with safety standards.

  • What causes DH-485 communication timeouts?

    Timeouts typically result from incorrect network termination resistors or duplicate node addresses on the DH-485 daisy chain.

  • How is the application memory accessed?

    Application runtime memory is accessed via the configuration software; ensure the project file size does not exceed the 240 KB limit of the nonvolatile storage.

  • Is the device firmware field-upgradable?

    The PanelView 550 firmware is static; terminal functionality is determined by the project file version developed within the configuration environment.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More