Allen-Bradley 2711-K3A5L1 Operator Interface PanelView 300
Allen-Bradley 2711-K3A5L1 Operator Interface PanelView 300
Allen-Bradley 2711-K3A5L1 Operator Interface PanelView 300
Allen-Bradley 2711-K3A5L1 Operator Interface PanelView 300
Allen-Bradley

Allen-Bradley 2711-K3A5L1 Operator Interface PanelView 300

SKU: 2711-K3A5L1
Categories : All Products
In Stock
  • Dimensions: 14 x 8 x 19.6 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley 2711-K3A5L1, also cataloged as the 2711K3A5L1 Operator Interface, operates as a dedicated hardware component for human-machine interaction and data visualization within DH-485 communication network platforms.

Model Identification Data

The unit is a monochrome keypad-based operator terminal specifically engineered for discrete process monitoring. The identifier 2711-K3A5L1 signifies the hardware configuration including integrated keypad input, monochrome display capability, and designated RS-232 communication architecture.

Primary Hardware Specifications

Parameter Specification
Model 2711-K3A5L1
Brand Allen-Bradley
Origin United States
Weight 0.52 kg
Shipping Dimensions 14 x 8 x 19.6 cm
Display Type 3 inch Monochrome
Interface Keypad
Communication RS-232 (DH-485) & RS-232 Printer Port
Input Voltage DC Power Supply

Deterministic Network Connectivity

The 2711-K3A5L1 utilizes RS-232 physical layer signaling to facilitate data exchange over DH-485 networks. System integration requires strict adherence to communication cabling length limitations and termination resistor specifications to maintain signal integrity within the deterministic network topology. Firmware flash compatibility is managed via the integrated programming port, requiring specific RSLinx driver configurations for successful host-to-terminal data synchronization.

Logistics and Package Contents

  • 1 x 2711-K3A5L1 Operator Terminal unit.

  • 1 x Installation gasket and mounting hardware clips.

  • 1 x Terminal block for DC power input.

  • Note: Communication cables and programming software are sold separately.

Installation and Integration Procedures

  • Mounting: Ensure the control panel cutout dimensions meet factory specifications to maintain NEMA/IP rating integrity. Secure the four mounting clips evenly to provide uniform compression on the front gasket.

  • Grounding: Establish a low-impedance earth ground connection to the terminal chassis to mitigate electromagnetic interference (EMI).

  • Wiring: Use shielded twisted-pair cabling for DH-485 communication lines. Route signal lines separately from high-voltage AC power cabling to prevent noise coupling.

  • Powering: Verify the 24 VDC power source is filtered and regulated prior to connection to avoid voltage transients during startup.

Distribution Logistics

  • Delivery time: 2-7 days when payment finish.

  • Dispatched via DHL/FEDEX/UPS.

  • All units are sealed in anti-static industrial packaging to prevent electrostatic discharge (ESD) and mechanical shock during transit.

Technical FAQs

  1. What is the primary communication protocol supported by this terminal?

    The unit utilizes the DH-485 protocol over an RS-232 physical link.

  2. Does this unit support hot-swapping during operation?

    No, power must be disconnected before connecting or disconnecting the terminal from the communication network.

  3. What is the expected service life of the monochrome backlight?

    The backlight intensity will degrade over time; maintenance intervals should be aligned with the industrial environment's duty cycle.

  4. Is the terminal compatible with current firmware updates?

    Compatibility depends on the existing terminal firmware version and the targeted development software environment.

  5. How should the keypad be cleaned?

    Use a soft cloth dampened with mild detergent; avoid abrasive solvents that may damage the membrane overlay.

  6. What is the maximum cable length for the DH-485 link?

    The total segment length is typically limited to 1219 meters (4000 feet) depending on the cable type and node count.

  7. What is the power supply tolerance?

    The unit requires a nominal 24 VDC supply; verify the voltage remains within the manufacturer's specified percentage range to ensure stable operation.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
Nov 03, 2026
Maxwell
ABB Robotics Unveils IRB 1700 and Physical AI at CIIF 2026
ABB Robotics has made its most significant product announcement of the year at the 26th...
Read More
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Nov 02, 2026
Maxwell
Apple iPhone 18 Pro Mass Production at Foxconn Zhengzhou with AI Automation
Apple's iPhone 18 Pro is entering mass production at Foxconn's Zhengzhou facility, marking the first...
Read More
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen No. 1
Nov 02, 2026
Maxwell
CIMC Raffles Launches World's First Semi-Submersible Wind-to-Hydrogen Platform Shenhai Hydrogen N...
CIMC Raffles Offshore, a subsidiary of China International Marine Containers Group, has launched the world's...
Read More
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Nov 02, 2026
Maxwell
Envision Technology Launches AI Wind Storage Integrated Machine Product Matrix at CWP 2026
Envision Technology has unveiled a comprehensive AI Wind Storage Integrated Machine product matrix at the...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
IFR Reports Global Industrial Robot Stock Surges to 5 Million Units as China Drives Growth
The density of industrial robots per 10,000 manufacturing employees in China has climbed to approximately...
Read More
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
Nov 01, 2026
Maxwell
IDC Reports Q3 2026 Global Smartphone Shipments Plunge 22 Percent Amid Memory Chip Crisis
The global smartphone market experienced its sharpest quarterly decline on record in the third quarter...
Read More
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Production
Nov 01, 2026
Maxwell
Hithium Chongqing Base Becomes World's First Lighthouse Factory for Energy Storage Battery Produc...
Hithium Energy Storage's Chongqing base has achieved a major production milestone, reaching 200 gigawatt-hours of...
Read More
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measures with 1.6 Billion Yuan Central Funding
Oct 31, 2026
Maxwell
China Three Ministries Release Hydrogen Energy Comprehensive Application Pilot Management Measure...
China's Ministry of Industry and Information Technology (MIIT), Ministry of Finance, and National Development and...
Read More
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Oct 31, 2026
Maxwell
Intel Seeks FCC Exemption for Foreign Robots to Maintain U.S. Semiconductor Production Lines
Intel Corporation has submitted a formal petition to the U.S. Federal Communications Commission (FCC) requesting...
Read More
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construction at Shengli Oilfield
Oct 31, 2026
Maxwell
China's First Million-Ton Low-Concentration CCUS Full-Chain Demonstration Project Starts Construc...
China's largest carbon capture, utilization, and storage (CCUS) initiative targeting low-concentration emissions has officially commenced...
Read More